基于BIM技術(shù)的中建時(shí)代廣場(chǎng)全生命周期項(xiàng)目管理
[Abstract]:Zhongjian Times Square is a benchmarking project based on the Standard of Shanghai Building Information Model to study the application of BIM technology in the whole life cycle of the project. This paper mainly expounds the application of BIM technology from three aspects: "Green technology management based on BIM technology", "construction quality management based on BIM technology" and "operation and maintenance stage work management based on BIM technology". The purpose of saving construction costs is to provide detailed data support for green Samsung and LEED Gold Awards certification.
【作者單位】: 上海中建東孚投資發(fā)展有限公司;中建八局工程研究院;中建八局上海分公司;
【分類號(hào)】:TU712;TU17
【相似文獻(xiàn)】
相關(guān)期刊論文 前8條
1 杜少東;柳琴;臧倩;;綠色建筑成本效益分析——以深圳建科大樓為例[J];建設(shè)科技;2012年17期
2 姚玉蓉;毛曄;許長(zhǎng)青;;我國(guó)開征物業(yè)稅的合理稅率設(shè)定研究[J];建筑經(jīng)濟(jì);2007年S1期
3 武田艷;何芳;;可持續(xù)性住宅全生命周期的節(jié)能研究[J];工業(yè)建筑;2008年03期
4 尚新民;王泰典;李佳翰;林銘郎;;從檢修案例探討水工隧道全生命周期觀點(diǎn)的設(shè)計(jì)考量[J];隧道建設(shè);2010年S1期
5 徐雋;譚忠富;溫超;董力通;;電網(wǎng)客戶全生命周期IT系統(tǒng)數(shù)據(jù)的“綠化”[J];電力信息化;2008年07期
6 李曉東;李永錄;;煉鋼廠房的結(jié)構(gòu)病態(tài)分析與對(duì)策[J];工業(yè)建筑;2013年S1期
7 蘇慶華,黃長(zhǎng)林,王耘,胡樹根;綠色設(shè)計(jì)思想在電除塵器產(chǎn)品開發(fā)中的應(yīng)用研究[J];華東電力;2002年10期
8 ;[J];;年期
相關(guān)會(huì)議論文 前3條
1 屈江林;付振旭;林奕富;;核電設(shè)備生命周期的研究管理與實(shí)現(xiàn)[A];2013電力行業(yè)信息化年會(huì)論文集[C];2013年
2 屈江林;付振旭;林奕富;;核電設(shè)備生命周期的研究管理與實(shí)現(xiàn)[A];2013電力行業(yè)信息化年會(huì)論文集[C];2013年
3 尚新民;王泰典;李佳翰;林銘郎;;從檢修案例探討水工隧道全生命周期觀點(diǎn)的設(shè)計(jì)考量[A];第九屆海峽兩岸隧道與地下工程學(xué)術(shù)及技術(shù)研討會(huì)論文集[C];2010年
,本文編號(hào):2304306
本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/2304306.html