【摘要】:保利國際廣場是一體型復(fù)雜的高層建筑,在3層設(shè)置巨型轉(zhuǎn)換桁架來支承上部樓層,結(jié)構(gòu)施工對(duì)結(jié)構(gòu)成型有很大的影響,通過施工模擬分析及對(duì)比,確定巨型桁架的施工順序、支撐架的拆除時(shí)間及樓板后澆帶的澆筑時(shí)間,對(duì)樓板裂縫進(jìn)行有效的控制,最后進(jìn)行了施工健康監(jiān)測,并與計(jì)算結(jié)果進(jìn)行對(duì)比。
[Abstract]:Poly International Plaza is a kind of complex high-rise building, which is supported by a giant transfer truss on the three floors. The construction of the structure has a great influence on the formation of the structure. The construction sequence of the giant truss is determined through the construction simulation analysis and comparison. The demolition time of the support frame and the pouring time of the post-pouring belt of the floor slab can effectively control the cracks of the floor slab. Finally, the construction health monitoring is carried out, and the results are compared with the calculated results.
【作者單位】: 廣東省建筑設(shè)計(jì)研究院;廣州大學(xué)土木工程學(xué)院;
【分類號(hào)】:TU974
[Abstract]:Poly International Plaza is a kind of complex high-rise building, which is supported by a giant transfer truss on the three floors. The construction of the structure has a great influence on the formation of the structure. The construction sequence of the giant truss is determined through the construction simulation analysis and comparison. The demolition time of the support frame and the pouring time of the post-pouring belt of the floor slab can effectively control the cracks of the floor slab. Finally, the construction health monitoring is carried out, and the results are compared with the calculated results.
【作者單位】: 廣東省建筑設(shè)計(jì)研究院;廣州大學(xué)土木工程學(xué)院;
【分類號(hào)】:TU974
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 練賢榮;曹偉良;尚文紅;馬臣杰;;京基金融中心施工模擬分析[J];建筑結(jié)構(gòu);2011年S1期
2 林歡;;矩陣遞推法在高層框架施工模擬計(jì)算中的應(yīng)用[J];建筑結(jié)構(gòu);1989年01期
3 袁政強(qiáng);梁建忠;張守筠;;柱長修正方法的施工模擬程序設(shè)計(jì)實(shí)現(xiàn)[J];重慶大學(xué)學(xué)報(bào);2010年10期
4 彭禮;王偉;李建宏;;杭州國際會(huì)議中心施工模擬分析[J];結(jié)構(gòu)工程師;2010年06期
5 方朔;趙昕;郁冰泉;伍小平;;考慮非彈性變形的建筑結(jié)構(gòu)施工模擬研究[J];建筑結(jié)構(gòu);2013年S1期
6 劉鑫;劉偉慶;王曙光;杜東升;;高層混合結(jié)構(gòu)基于模型分析的施工模擬方法[J];建筑結(jié)構(gòu);2013年05期
7 方永明,韋承基,戴國瑩;高層建筑結(jié)構(gòu)施工模擬分析的剖析[J];上海鐵道大學(xué)學(xué)報(bào);1997年04期
8 程媛;張偉才;李金果;;某懸掛結(jié)構(gòu)施工模擬分析[J];工程建設(shè)與設(shè)計(jì);2012年06期
9 牛r,
本文編號(hào):2298630
本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/2298630.html
最近更新
教材專著