光谷網(wǎng)球中心5000座網(wǎng)球場(chǎng)結(jié)構(gòu)設(shè)計(jì)
發(fā)布時(shí)間:2018-09-10 21:15
【摘要】:武漢光谷國(guó)際網(wǎng)球中心5000座網(wǎng)球場(chǎng)樓層結(jié)構(gòu)分為4層,整個(gè)看臺(tái)結(jié)構(gòu)由雙向斜交的菱形空間曲面大網(wǎng)格圍合,在平臺(tái)層和看臺(tái)層頂層環(huán)梁標(biāo)高處分別與主體結(jié)構(gòu)鉸接連接。采用基于犀牛軟件的BIM技術(shù),高效、準(zhǔn)確的完成從計(jì)算模型建立,到施工圖設(shè)計(jì)、節(jié)點(diǎn)有限元分析及詳圖繪制等一系列設(shè)計(jì)過(guò)程。
[Abstract]:The floor structure of 5000 tennis courts of Wuhan Optical Valley International Tennis Center is divided into four stories. The whole stand structure is surrounded by a bidirectional oblique rhombic spatial curved surface large mesh, which is hinged with the main structure at the top level of the platform and the terrace. Using BIM technology based on rhinoceros software, a series of design processes such as calculation model establishment, construction drawing design, node finite element analysis and detail drawing are completed efficiently and accurately.
【作者單位】: 中信建筑設(shè)計(jì)研究總院有限公司;
【分類(lèi)號(hào)】:TU398.9
[Abstract]:The floor structure of 5000 tennis courts of Wuhan Optical Valley International Tennis Center is divided into four stories. The whole stand structure is surrounded by a bidirectional oblique rhombic spatial curved surface large mesh, which is hinged with the main structure at the top level of the platform and the terrace. Using BIM technology based on rhinoceros software, a series of design processes such as calculation model establishment, construction drawing design, node finite element analysis and detail drawing are completed efficiently and accurately.
【作者單位】: 中信建筑設(shè)計(jì)研究總院有限公司;
【分類(lèi)號(hào)】:TU398.9
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 鄭方;馮新力;;北京奧林匹克公園網(wǎng)球中心[J];建筑創(chuàng)作;2007年07期
2 呂強(qiáng);莊惟敏;栗鐵;;奧林匹克公園網(wǎng)球中心[J];建筑師;2008年03期
3 張旭,
本文編號(hào):2235631
本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/2235631.html
最近更新
教材專(zhuān)著