高雄市立圖書(shū)總館全懸吊結(jié)構(gòu)設(shè)計(jì)與施工
發(fā)布時(shí)間:2018-04-24 21:39
本文選題:巨型柱 + 巨型桁架。 參考:《建筑鋼結(jié)構(gòu)進(jìn)展》2016年06期
【摘要】:高雄市立圖書(shū)館,地上結(jié)構(gòu)以位于四角的巨型柱與第8層的巨型桁架層組成巨型框架作為主要抗側(cè)力及豎向力系統(tǒng),并利用鋼材受拉最有效率的設(shè)計(jì)原則,采用高張力鋼棒懸吊3樓至7樓的樓板,有效減小柱截面尺寸,實(shí)現(xiàn)了地面層的無(wú)柱開(kāi)放空間。地下部分以經(jīng)濟(jì)性最好的鋼筋混凝土梁柱構(gòu)造加上筏式基礎(chǔ)。該工程為懸吊式結(jié)構(gòu),故施工順序是先完成巨柱及頂部桁架層,再自上而下建造,有別于傳統(tǒng)建筑工法。該工程在完工后還針對(duì)整體結(jié)構(gòu)及樓板作微震測(cè)量,以考察理論分析和實(shí)際建筑物的振動(dòng)頻率差異,及樓板振動(dòng)的舒適性。
[Abstract]:The invention relates to a high - tension steel bar suspension structure and a vertical force system , which comprises a giant column and an eighth layer of giant truss layers positioned at the four corners as main anti - lateral force and vertical force system , and utilizes the most effective design principle of steel tension steel bars to suspend the floors of the third floor to the seventh floor by adopting a high - tension steel rod , thereby effectively reducing the cross - sectional dimension of the column , and realizing the pillar - free open space of the ground layer .
【作者單位】: 筑遠(yuǎn)工程顧問(wèn)有限公司;
【分類(lèi)號(hào)】:TU318;TU765
,
本文編號(hào):1798346
本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/1798346.html
最近更新
教材專(zhuān)著