灰土擠密樁施工全面質(zhì)量控制研究

發(fā)布時(shí)間:2018-04-13 17:30

  本文選題:灰土擠密樁 + 施工 ; 參考:《蘭州交通大學(xué)》2015年碩士論文


【摘要】:黃土高原地區(qū)溝壑縱橫、地形破碎、地貌復(fù)雜,在黃土區(qū)域進(jìn)行工程建設(shè)難度大,對地基承載力的要求尤其高,為了消除或降低濕陷性黃土地基在施工后因過大荷載導(dǎo)致不均勻沉降問題,就必須加強(qiáng)地基承載力處理,而灰土擠密樁這種復(fù)合地基具有易于施工,處理土層效果好,取材經(jīng)濟(jì)等優(yōu)點(diǎn)故常用來處理濕陷性黃土。論文以灰土擠密樁施工工藝作為研究載體,分析了影響灰土擠密樁施工質(zhì)量的主要因素并運(yùn)用全面質(zhì)量管理的基本原理對施工過程進(jìn)行質(zhì)量控制研究,取得較好控制效果,主要研究內(nèi)容如下:(1)灰土擠密樁施工事前質(zhì)量控制的主要措施:首先做好技術(shù)資料、文件準(zhǔn)備的質(zhì)量控制。依照施工項(xiàng)目自然條件及技術(shù)經(jīng)濟(jì)條件,制定切實(shí)可行的施工組織設(shè)計(jì),做好充分的現(xiàn)場準(zhǔn)備,熟悉相關(guān)法律法規(guī),為即將到來的施工從技術(shù)和資料方面做好準(zhǔn)備。同時(shí)重視設(shè)計(jì)交底和圖紙審核工作,加強(qiáng)采購質(zhì)量控制包括制定物資采購計(jì)劃、要求驗(yàn)收標(biāo)準(zhǔn)等,其中分包商的選擇也是采購的一部分。最后做好質(zhì)量教育與培訓(xùn),通過教育提高員工的技術(shù)水平,增強(qiáng)質(zhì)量意識,滿足所從事的質(zhì)量工作對能力的要求。(2)灰土擠密樁施工事中質(zhì)量控制的主要措施有:嚴(yán)格執(zhí)行質(zhì)量標(biāo)準(zhǔn)體系,做好組織機(jī)構(gòu)、采購控制、測量控制、過程控制。強(qiáng)化管理,落實(shí)管理層、執(zhí)行層及操作層的質(zhì)量責(zé)任。做好工序控制,嚴(yán)格施工流程,確定質(zhì)量目標(biāo),制定實(shí)施保證措施。同時(shí)施工過程中做好工序配合、工種配合、單位配合工作便于統(tǒng)一目標(biāo),保證質(zhì)量。在施工過程中為了提高質(zhì)量控制水平,項(xiàng)目部組建質(zhì)量控制小組,通過對人員、材料、設(shè)備、工藝、環(huán)境等方面分析查找問題,采用質(zhì)量管理的PDCA循環(huán),對遇到的問題進(jìn)行甄別處理,提高施工質(zhì)量。(3)灰土擠密樁施工事后質(zhì)量控制的主要措施有:做好最終質(zhì)量檢驗(yàn)和試驗(yàn),技術(shù)資料的整理,及時(shí)對施工質(zhì)量缺陷進(jìn)行處理。論文以實(shí)訓(xùn)礦井實(shí)際工程項(xiàng)目灰土擠密樁施工的質(zhì)量控制作為實(shí)證研究對象,采用論文所提出質(zhì)量控制的主要措施,保證了該工程項(xiàng)目基礎(chǔ)工程的順利實(shí)施并通過了竣工驗(yàn)收,截至目前基礎(chǔ)工程未出現(xiàn)任何質(zhì)量問題。
[Abstract]:In the loess plateau area, the gully is vertical and horizontal, the terrain is broken, the geomorphology is complex, it is difficult to carry on the engineering construction in the loess area, the demand for the foundation bearing capacity is especially high.In order to eliminate or reduce the uneven settlement of collapsible loess foundation caused by excessive load after construction, it is necessary to strengthen the treatment of foundation bearing capacity, while the composite foundation of lime-soil compaction pile is easy to be constructed, and the treatment effect of soil layer is good.Therefore, it is often used to deal with collapsible loess.This paper takes the construction technology of lime-soil compaction pile as the research carrier, analyzes the main factors influencing the construction quality of lime-soil compaction pile, and studies the quality control of the construction process by using the basic principle of total quality management, and obtains better control effect.The main research contents are as follows: (1) the main measures of quality control in advance of lime-soil compaction pile construction: firstly, the quality control of technical data and document preparation.In accordance with the natural conditions and technical and economic conditions of the construction project, to formulate feasible construction organization design, to make adequate on-site preparation, familiar with relevant laws and regulations, and to prepare for the upcoming construction from the technical and material aspects.At the same time, we pay attention to the design and drawing audit, strengthen the quality control of procurement, including the preparation of material purchase plan, requirements for acceptance criteria, among which the selection of subcontractors is also a part of the procurement.Finally, we do a good job in quality education and training, improve the technical level of our staff through education, and enhance our awareness of quality.The main measures of quality control in the construction of lime-soil compaction pile are as follows: strictly implement the quality standard system, do well the organization, purchase control, measure control and process control.Strengthen management and implement quality responsibility of management, executive and operation level.Do a good job control, strict construction process, determine quality objectives, formulate implementation assurance measures.At the same time, in the process of construction process coordination, type of work coordination, unit coordination easy to unify the goal, to ensure quality.In order to improve the quality control level during the construction, the project department sets up the quality control team, through the personnel, the material, the equipment, the craft, the environment and so on aspect analysis finds the question, adopts the quality management PDCA cycle,The main measures to control the quality of lime-soil compaction pile after construction are as follows: finish the final quality inspection and test, arrange the technical data, and deal with the defects of construction quality in time.This paper takes the quality control of lime-soil compaction pile construction of practical mine engineering project as the empirical research object, and adopts the main measures of quality control proposed in the paper to ensure the smooth implementation of the foundation project of the project and the acceptance of the completion of the project.Up to now, there are no quality problems in foundation engineering.
【學(xué)位授予單位】:蘭州交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:TU753.3

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 李志芳;灰土擠密樁施工實(shí)踐[J];山西交通科技;2002年S1期

2 張喜彥,柴志信,高英杰;灰土擠密樁地基施工中若干問題的探討[J];山西建筑;2003年10期

3 馬培實(shí),劉秀全;灰土擠密樁在工程中應(yīng)用的體會(huì)[J];山西建筑;2004年14期

4 王俊林;王廣印;;灰土擠密樁的應(yīng)用及其原位檢測[J];山西建筑;2006年01期

5 王志國;;灰土擠密樁在虛填土處理中的應(yīng)用[J];山西建筑;2008年20期

6 圣小艷;;灰土擠密樁在離軍高速公路中的應(yīng)用[J];山西交通科技;2008年03期

7 孫建龍;;灰土擠密樁加固濕陷性黃土地基機(jī)理與施工[J];山西建筑;2008年29期

8 何斌;姜軍周;;灰土擠密樁及在處理濕陷性黃土地基中的應(yīng)用[J];山西建筑;2010年17期

9 何學(xué)勇;;灰土擠密樁施工概述[J];科技資訊;2010年15期

10 郭明;劉偉;郭亮;;西安某工程灰土擠密樁縮頸現(xiàn)象分析及治理[J];山西建筑;2011年20期

相關(guān)會(huì)議論文 前10條

1 史媛媛;逯曉冰;鄒璐;;灰土擠密樁在實(shí)際工程中的應(yīng)用[A];土木建筑學(xué)術(shù)文庫(第7卷)[C];2007年

2 布雷輝;;灰土擠密樁在濕陷性黃土地基處理中的應(yīng)用[A];科技、工程與經(jīng)濟(jì)社會(huì)協(xié)調(diào)發(fā)展——河南省第四屆青年學(xué)術(shù)年會(huì)論文集(上冊)[C];2004年

3 崔玲秋;邰戰(zhàn)穩(wěn);張暢;;爆擴(kuò)灰土擠密樁在濕陷性黃土地基中的應(yīng)用分析[A];第七屆全國工程地質(zhì)大會(huì)論文集[C];2004年

4 呂清天;郭彥林;;灰土擠密樁在濕陷性黃土地基中的應(yīng)用與研究[A];第六屆全國土木工程研究生學(xué)術(shù)論壇論文集[C];2008年

5 謝星;王東紅;趙法鎖;鄭建國;;多道瞬態(tài)瑞雷波法在灰土擠密樁檢測中的應(yīng)用[A];第七屆全國工程地質(zhì)大會(huì)論文集[C];2004年

6 周建民;;灰土擠密樁處理濕陷性黃土地基的應(yīng)用研究[A];中國土木工程學(xué)會(huì)第九屆土力學(xué)及巖土工程學(xué)術(shù)會(huì)議論文集(下冊)[C];2003年

7 周德茂;劉毅;;強(qiáng)烈自重濕陷黃土地區(qū)灰土擠密樁的設(shè)計(jì)與計(jì)算[A];第五屆全國工程地質(zhì)大會(huì)文集[C];1996年

8 戴國亮;龔維明;鄭名良;葉建良;齊靜靜;;灰土擠密樁在濕陷性黃土地區(qū)地基處理的應(yīng)用實(shí)例[A];中國地質(zhì)學(xué)會(huì)工程地質(zhì)專業(yè)委員會(huì)2006年學(xué)術(shù)年會(huì)暨“城市地質(zhì)環(huán)境與工程”學(xué)術(shù)研討會(huì)論文集[C];2006年

9 楊明群;;淺談灰土擠密樁與DDC樁在工程實(shí)踐中應(yīng)用與發(fā)展[A];2002年中國西北部重大工程地質(zhì)問題論壇論文集[C];2002年

10 孟慶芬;;濕陷性黃土地區(qū)大型油罐上整片灰土擠密樁工程設(shè)計(jì)探討[A];第四屆全國青年地質(zhì)工作者學(xué)術(shù)討論會(huì)論文集[C];1999年

相關(guān)碩士學(xué)位論文 前8條

1 石磊;內(nèi)蒙古和林格爾地區(qū)灰土擠密樁法的應(yīng)用研究[D];石家莊經(jīng)濟(jì)學(xué)院;2015年

2 何天成;灰土擠密樁施工全面質(zhì)量控制研究[D];蘭州交通大學(xué);2015年

3 王臻;灰土擠密樁樁間土擠密效果的理論分析與實(shí)驗(yàn)研究[D];西安建筑科技大學(xué);2004年

4 胡奇;灰土擠密樁與柱錘沖擴(kuò)樁聯(lián)合處理濕陷性黃土地基[D];合肥工業(yè)大學(xué);2007年

5 朱武衛(wèi);濕陷性黃土場地上大直徑灰土擠密樁試驗(yàn)研究[D];西安建筑科技大學(xué);2008年

6 張富鈞;濕陷性黃土地基灰土擠密樁靜動(dòng)力特性研究[D];甘肅農(nóng)業(yè)大學(xué);2011年

7 王穎星;柱錘沖擴(kuò)灰土擠密樁法在處理雜填土地基中的應(yīng)用[D];中國地質(zhì)大學(xué)(北京);2008年

8 王凱;濕陷性黃土路段高速列車運(yùn)行下灰土擠密樁路基的動(dòng)態(tài)響應(yīng)研究[D];西安建筑科技大學(xué);2014年

,

本文編號:1745506

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/1745506.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶8edf7***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請E-mail郵箱bigeng88@qq.com