沈陽(yáng)寶能環(huán)球金融中心超高混凝土條基墊塊在大底板施工中的應(yīng)用
發(fā)布時(shí)間:2018-01-18 07:31
本文關(guān)鍵詞:沈陽(yáng)寶能環(huán)球金融中心超高混凝土條基墊塊在大底板施工中的應(yīng)用 出處:《施工技術(shù)》2016年23期 論文類型:期刊論文
更多相關(guān)文章: 高層建筑 大底板 混凝土 條基墊塊 施工效率 施工技術(shù)
【摘要】:沈陽(yáng)寶能環(huán)球金融中心項(xiàng)目T1塔樓為在建東北第一高樓,其大底板澆筑過(guò)程中采用250mm高超高混凝土條基墊塊替代常規(guī)鋼筋、槽鋼墊塊的施工工藝。大底板混凝土總用量約為3.6萬(wàn)m3,一次性澆筑完成,而且底板鋼筋用量約為6 800t。為保證鋼筋能夠快速綁扎,加快施工速度,采用該工藝。實(shí)踐表明,采用該工藝大大節(jié)約鋼筋綁扎時(shí)間,有效提高了施工速度。
[Abstract]:The T1 tower of Shenyang Baoneng Global Financial Center Project is the tallest building in Northeast China. In the process of pouring the large floor slab, 250 mm high super high concrete strip foundation cushion is used to replace the conventional steel bar. Construction technology of channel steel cushion. The total amount of large floor concrete is about 36,000 m3, one-time pouring is completed, and the amount of bottom steel bar is about 6 800 t. In order to ensure that the steel bar can be fastened quickly. The construction speed is accelerated and the technology is adopted. The practice shows that the application of this technology greatly saves the binding time of steel bar and effectively increases the construction speed.
【作者單位】: 中建三局集團(tuán)有限公司東北分公司;
【分類號(hào)】:TU755
【正文快照】: 0引言在國(guó)內(nèi),各大城市高層建筑如雨后春筍般拔地而起,這些超高層建筑儼然已成為城市建設(shè)的標(biāo)志和象征。超高層建筑往往伴隨著深基坑大底板施工,而300m高度的高層建筑其底板的平均厚度在6m以上,此厚度大底板的鋼筋綁扎過(guò)程是施工過(guò)程控制重點(diǎn),尤其是其馬鐙墊塊的選擇,因?yàn)轳R鐙
【相似文獻(xiàn)】
相關(guān)會(huì)議論文 前2條
1 王永輝;尹占剛;;某工程地下室底板的施工[A];土木建筑學(xué)術(shù)文庫(kù)(第9卷)[C];2008年
2 劉萬(wàn)忠;張偉;;陽(yáng)光棕櫚園10~#樓地下室底板施工技術(shù)[A];第十二屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集第Ⅱ冊(cè)[C];2003年
相關(guān)重要報(bào)紙文章 前1條
1 山西潞安工程有限公司 賈勇;地下室混凝土底板施工裂縫的分析及控制[N];科學(xué)導(dǎo)報(bào);2010年
,本文編號(hào):1440077
本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/1440077.html
最近更新
教材專著