基于風(fēng)險(xiǎn)分析的承包商索賠管理研究
[Abstract]:At present, the competition in China's construction market is increasingly fierce, contractors often adopt the strategy of winning bids at low prices in order to win projects, and their profit levels are getting lower and lower. Contractors in a relatively passive position are trying to improve their project management level. Try to make up for the decrease in profits by winning a bid at a low price in other ways. Claim management has been favored by contractors because of its low cost and obvious economic effect. It has become an important strategy for contractors to protect their legitimate rights and interests, make up for project losses and improve economic benefits in the whole process of construction projects. The claim management in China started relatively late. Although the research on claim management in China has made great progress in recent years, the relevant theoretical research and practical application are still at an imperfect stage, especially for contractors who are in a passive position in engineering projects. How to carry out reasonable engineering risk analysis and establish a risk-based claim management mechanism has become an urgent problem for all parties in construction enterprises, especially contractors, which is the purpose of this paper. From the point of view of contractor, this paper introduces systematically the theories of risk analysis and claim management at home and abroad, and discusses the meaning of claim risk, the methods and procedures of risk analysis, and the present situation of claim management of contractors in China. On this basis, contractor risk identification is carried out, risk sources and events are classified, and contractor claim risk list is constructed. Then, the risk evaluation model of contractor's claim based on risk analysis is constructed by using fuzzy mathematics, and the claim risk of a high-rise residential district in Qingdao is analyzed quantitatively and ranked according to the example of a high-rise residential district in Qingdao. Finally, according to the risk of claim factors, five claims management strategies are put forward to provide new ideas for claim management.
【學(xué)位授予單位】:青島理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2011
【分類號(hào)】:TU72
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 羅紹榮;甄峰;魏宗財(cái);;城市發(fā)展戰(zhàn)略規(guī)劃中情景分析方法的運(yùn)用——以臨汾市為例[J];城市問題;2008年09期
2 彭艷;;建筑承包商風(fēng)險(xiǎn)評(píng)價(jià)的灰色關(guān)聯(lián)分析[J];湖南工程學(xué)院學(xué)報(bào)(社會(huì)科學(xué)版);2011年02期
3 劉志強(qiáng),于維洋,蔡煒樺;試論加強(qiáng)工程索賠管理研究[J];河北建筑科技學(xué)院學(xué)報(bào)(社科版);2004年01期
4 劉伊生;王小龍;陳忠林;;國(guó)外工程擔(dān)保制度及其啟示[J];工程管理學(xué)報(bào);2010年01期
5 陳衛(wèi)華,梁曉艷,糜仲春;模糊綜合評(píng)判在人事考核中的應(yīng)用[J];價(jià)值工程;2005年10期
6 李慧民;黃鶯;陳旭;;模糊綜合評(píng)判在索賠風(fēng)險(xiǎn)中的應(yīng)用[J];建筑經(jīng)濟(jì);2006年S1期
7 李冰心;朱天志;楊曉靜;張明;邢妍;;承包商施工合同風(fēng)險(xiǎn)分析及防范[J];建筑經(jīng)濟(jì);2007年08期
8 程學(xué)昌;奚涵川;;建設(shè)工程項(xiàng)目的全過程成本管理[J];建筑經(jīng)濟(jì);2007年11期
9 卿姚;王月明;;工程風(fēng)險(xiǎn)管理與工程保險(xiǎn)[J];四川建筑;2006年04期
10 張水波,何伯森;國(guó)際工程索賠權(quán)論證中處理開脫性條款的原則與實(shí)踐[J];天津大學(xué)學(xué)報(bào)(社會(huì)科學(xué)版);1999年03期
本文編號(hào):2440637
本文鏈接:http://sikaile.net/jingjilunwen/gongyejingjilunwen/2440637.html