BHEL交付使用在印度東北部最大的聯(lián)合循環(huán)裝置
發(fā)布時(shí)間:2018-10-11 19:05
【摘要】:正據(jù)《Gas Turbine World》2014年9-10月刊報(bào)道,印度重型電氣公司已交付用在離阿格爾塔拉約50 km的特里普拉(位于帕拉塔納)的2×363.3 MW燃?xì)廨啓C(jī)聯(lián)合循環(huán)電站第2臺機(jī)組。OTPC(ONGC熱電公司)的這個(gè)項(xiàng)目是在印度整個(gè)東北部該類電站中最大工程項(xiàng)目。帕拉塔納項(xiàng)目的首臺機(jī)組是在去年1月份交付使用的。
[Abstract]:As reported in the September-October 2014 issue of < Gas Turbine World >, Heavy-duty Electric India has delivered the project in Tripura, about 50 km from Agartala (2 x 363.3 MW gas turbine combined cycle power plant in Paralatana) for unit 2,. OTPC (ONGC Heat and Power Co., Ltd., which is located throughout India. The largest project of this kind of power station in the northeast. The first unit of the Paratana project was delivered in January last year.
【分類號】:F416.6
本文編號:2264928
[Abstract]:As reported in the September-October 2014 issue of < Gas Turbine World >, Heavy-duty Electric India has delivered the project in Tripura, about 50 km from Agartala (2 x 363.3 MW gas turbine combined cycle power plant in Paralatana) for unit 2,. OTPC (ONGC Heat and Power Co., Ltd., which is located throughout India. The largest project of this kind of power station in the northeast. The first unit of the Paratana project was delivered in January last year.
【分類號】:F416.6
【相似文獻(xiàn)】
相關(guān)期刊論文 前7條
1 吉桂明;;用于聯(lián)合生產(chǎn)的燃?xì)廨啓C(jī)聯(lián)合循環(huán)裝置[J];熱能動力工程;2008年06期
2 學(xué)牛;標(biāo)準(zhǔn)小型聯(lián)合循環(huán)裝置的價(jià)格[J];熱能動力工程;1996年06期
3 廖勤;鎮(zhèn)海增加350MW的聯(lián)合循環(huán)裝置[J];燃?xì)廨啓C(jī)技術(shù);1997年01期
4 吉桂明;;GE能源公司FlexEfficiency 50聯(lián)合循環(huán)電站[J];熱能動力工程;2012年03期
5 吉桂明;;用聯(lián)合循環(huán)裝置取代噴水的簡單循環(huán)裝置[J];熱能動力工程;2013年02期
6 ;簡訊[J];熱能動力工程;2007年03期
7 ;[J];;年期
相關(guān)重要報(bào)紙文章 前1條
1 楊行年;年減少碳排放207萬噸[N];中國審計(jì)報(bào);2010年
,本文編號:2264928
本文鏈接:http://sikaile.net/jingjilunwen/gongyejingjilunwen/2264928.html
最近更新
教材專著