適應(yīng)貨運改革的鐵路編組站設(shè)備配置研究
[Abstract]:With the completion and opening of high-speed railway in China, railway freight capacity has been released, which creates conditions for railway departments to optimize transportation organization according to market demand. Since September 20, 2012, the railway department has launched the "real cargo system" transportation organization mode, relying on the freight electronic commerce system, which simplifies the procedures for consignments by cargo owners and saves transportation time. At the same time, it also improves the working efficiency of railway department itself, and makes the logistics service of railway get further expansion. As one of the most important subsystems in railway system, the adaptability of marshalling yard to freight transport quality determines the quality of freight transportation. This paper first introduces the classification and distribution of railway marshalling yards in China, analyzes the present situation of transportation organization and equipment allocation of marshalling yards in China, and expounds the passing capacity of marshalling yards under the trend of freight transportation organization reform. Adaptation capacity in the case of declining capacity to adapt to the basic freight transport demand. Then, starting with the content of the freight transport reform, the impact on the freight flow and the impact on the vehicle flow, the characteristics of the freight transport reform are analyzed, and the new transport products introduced by the railway after the freight transport reform are summarized. This paper introduces the express freight train and its timeliness requirements. Through the qualitative analysis of the transportation organization demand of the express freight train in the marshalling yard, it is found that the fast freight train has certain priority in the process of arrival, disintegration and marshalling because of the 18 hour time limit. Therefore, the marshalling yard needs to change the former organization mode with large group traffic as the core, and change to take the fast freight train group as the core to carry on the transportation organization. The capacity of extra work caused by freight reform for the equipment of marshalling station to departure line, shunting locomotive, hump and shunting line is calculated quantitatively. Taking the arrival and departure line as the research object, this paper puts forward the concept of fast train group arrival combination, and gives four kinds of train arrival combination. Based on the thought of queuing theory and the method of minimum interval, the minimum arrival interval of four kinds of combined trains is calculated, and the average minimum train arrival interval of arrival field is obtained, and the transit capacity of arrival and departure line is obtained. Further calculation of the shipping line due to the cargo change caused by the cost of space. Finally, taking Chengdu North marshalling Station as an example, the application of the equipment adapted to cargo reform is analyzed.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:U291.4
【參考文獻】
相關(guān)期刊論文 前10條
1 席偉;;駝峰編組站應(yīng)用新型調(diào)速設(shè)備的作業(yè)安全問題[J];減速頂與調(diào)速技術(shù);2013年02期
2 袁光明;;成都北編組站站場設(shè)計[J];高速鐵路技術(shù);2013年01期
3 李磊;;編組站各車場能力協(xié)調(diào)的研究[J];鐵道運輸與經(jīng)濟;2012年03期
4 衛(wèi)紅軍;;提高駝峰作業(yè)能力的思考[J];鐵道運輸與經(jīng)濟;2011年03期
5 李海鷹;張超;;編組站到解系統(tǒng)通過能力計算方法[J];中國鐵道科學(xué);2010年03期
6 劉玉興;;充分利用既有設(shè)備提高編組站的運輸能力[J];減速頂與調(diào)速技術(shù);2008年03期
7 李海鷹;張超;;提速干線上編組站列車到達規(guī)律[J];中國鐵道科學(xué);2007年06期
8 范振平;牛會想;林柏梁;;基于最小間隔法的重載運輸通過能力研究[J];物流技術(shù);2007年05期
9 朱曉立;李夏苗;;提速干線編組站出發(fā)子系統(tǒng)內(nèi)部匹配與協(xié)調(diào)關(guān)系[J];中國鐵道科學(xué);2006年05期
10 王德;謝文炳;胡思繼;鄭時德;;編組站到達—解體系統(tǒng)與區(qū)間通過能力的協(xié)調(diào)條件[J];北方交通大學(xué)學(xué)報;1993年03期
,本文編號:2345112
本文鏈接:http://sikaile.net/jingjilunwen/dianzishangwulunwen/2345112.html