基于承包人公平感受的建設(shè)工程合同參照點(diǎn)研究:來自眼動(dòng)實(shí)驗(yàn)的數(shù)據(jù)
[Abstract]:In the field of construction projects, for the purpose of investment control and project performance, the contractor often designs strict control clauses in the process of contract formulation in the bidding and bidding stage of construction projects. Ensure the controllability of project investment and the realization of established project performance. However, based on the strict contract clause drawn up under the assumption of "economic person" of the contractor, the "social person" attribute of the contractor is ignored, and the overly strict contract terms will lead to the unfair feeling of the contractor. It indirectly leads to the negative performance of the contractor and even the occurrence of opportunistic behavior after the event, and finally leads to the low performance of the project. According to the theory of contract reference point, prior contract is the only criterion for contractors to judge the gains and losses of their own rights, and affects the choice of performance behavior of contractors. Therefore, the core problem of the improvement of project performance is whether the contractor feels that his own rights and interests have been treated fairly. According to the theory of contract reference point, in the field of construction engineering, the clause stipulated in the contract signed between the two parties can also be used as the reference point, which will also cause the contractor to feel fair. When the contract price matches the risk borne by the contractor and the rights of one's own party are treated fairly in the adjustment of the contract price, the agreed contract can be considered to be fair. It can be seen that the contract clause in the contract concluded between the contractor and the contractor is the reference point for them to judge the gain and loss of their own interests, and it is the source of trigger and induce the contractor's fair perception. In view of this, in order to determine the contract reference point which can induce the contractor's fair feeling, this paper intends to choose the experimental research method of eye movement to explore the robust relationship between the contractor's fair feeling and the contract terms with the characteristics of fair perception. The article mainly includes the following two parts: 1. The design and research of eye movement experimental materials is based on the review and analysis of related research. In order to better control the experimental process, the situation is brought into the situation of engineering change and price fluctuation. It represents two kinds of cases: big influence and small influence. The experimental materials are contract terms related to engineering changes and price fluctuations. First of all, the terms of the contract text are refined and set up to make it readable. Secondly, in order to ensure the rationality of the contract clause setting, 30 contractors who did not participate in the formal experiment or experts engaged in the relevant research of contract management were selected to evaluate the rationality of the contract clause setting. Finally, the experimental materials are improved and modified through the pre-experiment, and the experimental materials for the final formal experiment are determined. 2, Research on the determination of reference Point set in Construction Project contract firstly, the eye movement indexes such as gaze points, gaze time and hot spot diagram of the contractor reading the experimental materials are collected through the eye movement experiment, and the contractor's attention to the terms of the contract is analyzed. Thus, the contract terms which can attract the attention of the contractor in the construction project contract are obtained. Secondly, after the eye movement experiment, each subject was asked to fill out the relevant questionnaire and conduct a semi-structured interview, so as to understand the contractor's fair feelings about different experimental materials. Finally, it is compared with the existing research to verify the relationship between the reference point of the construction contract and the psychological feeling of the contractor, and to determine the set of reference points of the contract of the project and its structure.
【學(xué)位授予單位】:天津理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:F284
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 嚴(yán)玲;丁乾星;張笑文;;不利物質(zhì)條件下建設(shè)項(xiàng)目合同補(bǔ)償研究[J];建筑經(jīng)濟(jì);2015年11期
2 秦友才;黃亞江;;國(guó)際工程項(xiàng)目變更優(yōu)化案例分析[J];國(guó)際經(jīng)濟(jì)合作;2015年03期
3 任桂琴;赫亮清;周永壘;;洗發(fā)水平面廣告認(rèn)知加工的眼動(dòng)研究[J];人類工效學(xué);2015年01期
4 姜哲;張強(qiáng);鄧作兵;喬翠翠;王愛平;;不同電子文本的對(duì)比度極性和顏色組合對(duì)閱讀疲勞的影響——來自眼動(dòng)追蹤實(shí)驗(yàn)的證據(jù)[J];心理學(xué)探新;2015年01期
5 杜亞靈;胡雯拯;尹貽林;;風(fēng)險(xiǎn)分擔(dān)對(duì)工程項(xiàng)目管理績(jī)效影響的實(shí)證研究[J];管理評(píng)論;2014年10期
6 曹啟龍;盛昭瀚;周晶;劉慧敏;李遷;;基于公平偏好的我國(guó)政府投資項(xiàng)目代建制激勵(lì)——監(jiān)督模型[J];中國(guó)軟科學(xué);2014年10期
7 杜亞靈;李會(huì)玲;柯洪;;工程項(xiàng)目中業(yè)主初始信任對(duì)合作的影響研究:承包商公平感知的中介作用[J];管理學(xué)報(bào);2014年10期
8 周浩;龍立榮;;分配制度公平對(duì)員工分配公平感的影響:中國(guó)組織情境下的實(shí)證研究[J];心理與行為研究;2014年05期
9 郭心毅;雙海軍;謝家智;;組織公平影響企業(yè)員工行為和態(tài)度的實(shí)證研究[J];現(xiàn)代管理科學(xué);2014年09期
10 晏艷陽(yáng);金鵬;;公平偏好下的多任務(wù)目標(biāo)與國(guó)企高管薪酬激勵(lì)[J];中國(guó)管理科學(xué);2014年07期
相關(guān)碩士學(xué)位論文 前1條
1 曾旭;建設(shè)項(xiàng)目動(dòng)態(tài)聯(lián)盟有效溝通機(jī)制研究[D];吉林大學(xué);2011年
,本文編號(hào):2491806