政府投資工程項(xiàng)目風(fēng)險(xiǎn)評(píng)價(jià)研究
[Abstract]:Since the reform and opening up, China's economy has been greatly developed, with an annual growth rate of more than 7%, the GDP has leapt to the second place in the world, second only to the United States, known as "China's speed". As one of the "troika" to stimulate the domestic economy, government-invested engineering projects play an important role in the process of GDP growth, and with the continuous advancement of China's urbanization process and the continuous construction of large-scale infrastructure projects such as high-speed rail, Government investment projects will play a more and more important role in the composition of China's GDP growth rate and will become a stable and sustained output. At the same time, due to various reasons, there are a large number of risks in the process of implementation of government-invested engineering projects, including the risks of the project itself, corruption and other man-made risks, which have caused great losses to the country and the people. Therefore, in order to perfect the risk management system of government investment projects, it is necessary to establish the evaluation index system of government investment projects. Firstly, this paper summarizes the research on government investment projects at home and abroad. Then, according to the literature, combined with the actual situation, this paper establishes an index system for the risk evaluation of government investment projects. The index system includes decision-making risk, management risk, political policy risk, economic risk. Natural environment risk and project technical risk are evaluated by AHP-TOPSIS method, and an example is analyzed. Finally, some suggestions are put forward to improve the risk management system of government investment projects in China, and the future research is prospected.
【學(xué)位授予單位】:武漢紡織大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:F283
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 王雪青;何貞;;國(guó)際工程項(xiàng)目風(fēng)險(xiǎn)評(píng)價(jià)指標(biāo)體系及模型構(gòu)建研究[J];山東建筑大學(xué)學(xué)報(bào);2013年02期
2 王玲;劉建林;朱記偉;;基于AHP-MF模型的國(guó)際水電EPC項(xiàng)目風(fēng)險(xiǎn)評(píng)價(jià)研究[J];工程管理學(xué)報(bào);2012年04期
3 胡芳;劉志華;李樹(shù)丞;;基于熵權(quán)法和VIKOR法的公共工程項(xiàng)目風(fēng)險(xiǎn)評(píng)價(jià)研究[J];湖南大學(xué)學(xué)報(bào)(自然科學(xué)版);2012年04期
4 邵軍義;董坤濤;郭晗;趙輝;;國(guó)際工程項(xiàng)目風(fēng)險(xiǎn)評(píng)價(jià)研究[J];工程管理學(xué)報(bào);2011年02期
5 黃恒振;譚華中;;基于WSR的項(xiàng)目風(fēng)險(xiǎn)管理研究[J];項(xiàng)目管理技術(shù);2011年04期
6 關(guān)會(huì)芳;田劍;;工程項(xiàng)目投資決策中風(fēng)險(xiǎn)評(píng)價(jià)方法研究[J];價(jià)值工程;2010年08期
7 陳昌富;;企業(yè)多項(xiàng)目風(fēng)險(xiǎn)管理模型與方法研究[J];北京航空航天大學(xué)學(xué)報(bào)(社會(huì)科學(xué)版);2010年01期
8 席一凡;聶興信;王超;;工程項(xiàng)目風(fēng)險(xiǎn)評(píng)價(jià)模型研究[J];災(zāi)害學(xué);2009年03期
9 陳,
本文編號(hào):2217928
本文鏈接:http://sikaile.net/jingjifazhanlunwen/2217928.html