PPP體系下的BOT項(xiàng)目績(jī)效指標(biāo)體系設(shè)計(jì)研究
[Abstract]:In the traditional administration of our country, public projects are usually provided by the government, which makes the financial burden and financing risk of the government increased, and it is difficult to obtain good construction and operational efficiency. In order to overcome the above disadvantages, PPP (Public-Private-Partnership) mode is introduced in our country. However, under the PPP system, the research on the performance evaluation of the BOT project in our country is lack of systematicness, which is mainly limited in the stage of project establishment, bidding and construction, and the research on the operation and handover of the later stage of the project is relatively few. In this paper, the whole process of the project is divided into five stages from the time line. On the basis of the existing research results and the characteristics of each stage, this paper carries out a comprehensive and systematic identification index, through which the index system is selected and formed. In this paper, the background, significance and connotation of the BOT project under the PPP system are first expounded, and then the strategic objectives of all parties are obtained through the establishment of the performance evaluation index system of the BOT project under the PPP system based on the analysis of the key elements of success. Secondly, select and determine the evaluation elements and finally identify the key indicators, according to the quantifiable characteristics of the indicators to distinguish the quantitative and qualitative indicators, and then use the fuzzy comprehensive evaluation method to further quantify the influencing factors. The results show that the effectiveness and feasibility of the method are obviously different from the post-evaluation of BOT project, and there is a fundamental gap between the method and the social evaluation of BOT project. Based on the key success factors of PPP project and the analysis of the core process of the project, this paper constructs an index system with 27 primary evaluation indicators and 52 second-level indicators. The index system can be used in the whole process of BOT project performance evaluation. Secondly, the case analysis of Nanchang City wheat garden kitchen processing BOT project, through the analysis of the indicators, it is concluded that the project performance evaluation is general. In this BOT project, the performance of environmental and social benefits is general, so it is necessary to improve the technical level to get better results.
【學(xué)位授予單位】:江西財(cái)經(jīng)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:F283
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 丁榮貴;王金安;;首席專家勝任特征與研發(fā)項(xiàng)目績(jī)效——組織管理環(huán)境的調(diào)節(jié)作用[J];科學(xué)學(xué)研究;2016年05期
2 劉華海;;科研項(xiàng)目績(jī)效評(píng)價(jià)模型和指標(biāo)體系的構(gòu)建[J];科研管理;2016年S1期
3 柯洪;李凌洋;劉秀娜;;政府投資基本建設(shè)項(xiàng)目績(jī)效評(píng)價(jià)標(biāo)準(zhǔn)系數(shù)研究[J];建筑經(jīng)濟(jì);2016年04期
4 紀(jì)鑫華;;優(yōu)化項(xiàng)目風(fēng)險(xiǎn)分配 實(shí)現(xiàn)PPP“物有所值”[J];中國財(cái)政;2015年16期
5 劉曉凱;張明;;全球視角下的PPP:內(nèi)涵、模式、實(shí)踐與問題[J];國際經(jīng)濟(jì)評(píng)論;2015年04期
6 伍迪;王守清;余勇軍;;政府發(fā)起B(yǎng)T模式建設(shè)工程項(xiàng)目的關(guān)鍵成功因素及管理對(duì)策[J];建筑經(jīng)濟(jì);2015年06期
7 孫宜迪;;BOT項(xiàng)目的績(jī)效評(píng)價(jià)方法探索[J];中國財(cái)政;2014年24期
8 吳宗法;馬振鵬;孟秀煥;;基于模糊神經(jīng)網(wǎng)絡(luò)的公共項(xiàng)目績(jī)效評(píng)價(jià)模型研究——以發(fā)展結(jié)果為導(dǎo)向的理論框架構(gòu)建[J];南京審計(jì)學(xué)院學(xué)報(bào);2015年01期
9 王俊豪;付金存;;公私合作制的本質(zhì)特征與中國城市公用事業(yè)的政策選擇[J];中國工業(yè)經(jīng)濟(jì);2014年07期
10 余勇軍;伍迪;王守清;;中國BT項(xiàng)目關(guān)鍵成功因素研究[J];工程管理學(xué)報(bào);2014年03期
相關(guān)重要報(bào)紙文章 前2條
1 于麗;;PPP績(jī)效評(píng)價(jià)第三方機(jī)構(gòu)遴選三要點(diǎn)[N];中國財(cái)經(jīng)報(bào);2016年
2 游亞宏;;天津開發(fā)建設(shè)項(xiàng)目招投標(biāo)審計(jì)軟件[N];中國審計(jì)報(bào);2006年
,本文編號(hào):2190173
本文鏈接:http://sikaile.net/jingjifazhanlunwen/2190173.html