熱電廠除塵系統升級改造項目質量管理研究
[Abstract]:With the rapid development of economy in China, the problem of environmental pollution has become increasingly prominent. Bad weather such as haze has threatened the life and property of the people, and reducing the emission of particulate matter has become the focus of the government and various units at the present stage. As a coal-fired enterprise, the flue gas produced in the power generation process contains pollutants such as soot, sulfur oxide, (SOx), nitrogen oxide (NOx) and CO2, etc., under the increasingly strict environmental protection requirements of the country and Beijing. The project of upgrading and retrofitting the dust removal system of thermal power plants has become the key work of each power plant. How to complete the upgrading and upgrading of the dust removal system in limited time and capital environment has become the key point of the project management of power plants at this stage. On the basis of extensive reference to domestic and foreign literature, this paper makes a deep research on the relevant contents and theories of engineering management, and combs the project management knowledge involved in the project of upgrading and reforming the dust removal system in thermal power plants. On this basis, this paper summarizes the methods of engineering quality management, and constructs the theoretical system of this study. Then, the development of comprehensive evaluation method is summarized, and the evaluation method of quality management index is introduced. Then based on the owner's angle, starting from the basic elements of quality management, the paper constructs five primary quality management indicators, namely, personnel factor, equipment factor, material factor, method factor and environmental factor, aiming at each quality management index. Twenty secondary indexes, including management level, design quality, material quality and so on, are constructed, and a comprehensive quality management index system is obtained, which lays a foundation for the analysis and calculation of the following articles. After constructing the quality management index system, this paper combines the upgrading project of the dust removal system in a power plant, first of all, using the analytic hierarchy process (AHP), combined with the evaluation of the owner's quality management work by the project participants. This paper calculates the relative importance of quality management index, then marks the quality management effect of the project, and analyzes objectively the management effect of owner in the process of quality management by using fuzzy comprehensive evaluation method. Finally, based on the quality management specification of the project, this paper puts forward the quality control measures of the dust removal system upgrading project in the thermal power plant, in order to guide the power plant staff to complete the quality control of similar projects. Make this research more practical significance.
【學位授予單位】:華北電力大學(北京)
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:TU712.3
【參考文獻】
相關期刊論文 前10條
1 楊曉梅;;PDCA循環(huán)在工程質量管理中的應用解析[J];住宅與房地產;2016年18期
2 閆兵;;建筑施工工程質量管理與控制措施剖析[J];江西建材;2016年02期
3 許國平;錢偉;;淺談電廠機組檢修項目管理[J];湖州師范學院學報;2015年10期
4 詹崢萍;;電廠工程施工過程中的質量管理分析[J];機電信息;2015年27期
5 鐘智;;垃圾焚燒電廠電能質量控制要素分析[J];電氣時代;2015年05期
6 安海峰;;云寧電廠除塵改造工程質量管理淺析[J];有色金屬文摘;2015年01期
7 丁勝軍;;工程項目質量控制研究[J];財經問題研究;2014年S2期
8 袁旭梅;張旭;張志軍;;信息共享意愿、技術能力與共享水平:環(huán)境不確定性的影響[J];企業(yè)經濟;2014年08期
9 舒歡;李露凡;;基于SEM的大型工程項目質量管理因素指標體系研究[J];土木工程與管理學報;2013年04期
10 任敏;歐立雄;;制造型企業(yè)項目管理能力評價指標體系研究[J];機械制造;2012年06期
相關碩士學位論文 前6條
1 朱金龍;宜興范蠡大橋工程質量管理改進研究[D];東華大學;2016年
2 嚴格;布連電廠工程項目質量管理評價研究[D];華北電力大學;2016年
3 武利利;火電施工項目質量控制研究[D];河南工業(yè)大學;2015年
4 王德龍;華能營口電廠二期機組工程供熱改造項目風險分析[D];吉林大學;2013年
5 李昌美;印度JSG火電站EPC項目質量評價與控制研究[D];中國海洋大學;2012年
6 鄧德學;建筑工程施工項目質量管理與應用研究[D];西南交通大學;2008年
,本文編號:2148718
本文鏈接:http://sikaile.net/jianzhugongchenglunwen/2148718.html