寧波市江北區(qū)工業(yè)類基本建設(shè)項目行政審批流程改革研究
發(fā)布時間:2018-05-13 10:18
本文選題:工業(yè)類基本建設(shè)項目 + 行政審批; 參考:《寧波大學(xué)》2017年碩士論文
【摘要】:工業(yè)投資作為整個社會固定資產(chǎn)投資的重要構(gòu)成,不但對目前的投資有影響,長期而言對今后促進工業(yè)化的進程方面也將起到非常重要的作用。推動工業(yè)投資增長,就要充分發(fā)揮政府引導(dǎo)效應(yīng),積極響應(yīng)習(xí)總書記提出的“國家治理體系和能力現(xiàn)代化”,提供高效的投資審批服務(wù)。這對縮短工業(yè)類基建項目報建審批周期,加速項目落地啟動,營造投資良好環(huán)境,推動固定資產(chǎn)快速增長、帶動社會經(jīng)濟快速發(fā)展而言意義重大。所以如何簡化優(yōu)化審批流程,構(gòu)建高效行政審批模式,進一步深化工業(yè)類基本建設(shè)項目行政審批流程改革,亟待我們?nèi)パ芯拷鉀Q。本文以寧波市江北區(qū)工業(yè)類基本建設(shè)項目報建審批流程改革的具體實踐為主要研究對象,將全文分成五大塊展開。第一部分總起,概括提出本文的研究背景、重難點和參考文獻等。第二部分對相關(guān)概念和理論進行介紹,從理論依據(jù)和現(xiàn)實必要性兩方面入手,為進行工業(yè)類基本建設(shè)項目行政審批流程改革提出依據(jù)。第三部分具體闡述分析寧波市江北區(qū)工業(yè)類基建項目行政審批流程改革的現(xiàn)狀和問題。第四部分分析國內(nèi)其他地區(qū)工業(yè)類基建項目行政審批流程改革案例,參考得出啟示借鑒和下步改革路徑。第五部分通過相關(guān)理念再造,對現(xiàn)行工業(yè)類基本建設(shè)項目的審批流程提出具體改革對策,為其他地區(qū)的基本建設(shè)項目開發(fā)建設(shè)領(lǐng)域的審批改革提供借鑒。
[Abstract]:As an important component of the investment in fixed assets of the whole society, industrial investment not only has an impact on the present investment, but also plays a very important role in promoting the process of industrialization in the long run. To promote the growth of industrial investment, we must give full play to the effect of government guidance, respond positively to General Secretary Xi's "modernization of national governance system and capacity," and provide efficient investment examination and approval services. This is of great significance to shorten the approval period of industrial infrastructure projects, accelerate the start of projects, create a good environment for investment, promote the rapid growth of fixed assets, and promote the rapid development of social economy. Therefore, how to simplify and optimize the approval process, construct an efficient administrative approval model, and further deepen the reform of the administrative approval process for industrial capital construction projects are urgently needed for us to study and solve. This paper focuses on the concrete practice of the reform of the approval process for industrial capital construction projects in Jiangbei District of Ningbo City, and divides the full text into five parts. In the first part, the research background, difficulties and references of this paper are summarized. The second part introduces the related concepts and theories, starting with the theoretical basis and the practical necessity, and puts forward the basis for the reform of the administrative examination and approval process of industrial capital construction projects. The third part analyzes the current situation and problems of administrative approval process reform of industrial infrastructure projects in Jiangbei District of Ningbo City. The fourth part analyzes the cases of administrative approval process reform of industrial infrastructure projects in other regions of China, and draws inspiration and the next reform path. The fifth part puts forward the concrete reform countermeasures to the approval process of the current industrial capital construction project through the related concept reengineering, and provides the reference for the examination and approval reform in the field of the development and construction of the capital construction project in other regions.
【學(xué)位授予單位】:寧波大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:D630
【相似文獻】
相關(guān)期刊論文 前10條
1 黃德明;;改進行政審批流程構(gòu)造方法的建議[J];中國信息界;2006年16期
2 王勉;向志強;;“曝曬”行政審批流程[J];w,
本文編號:1882739
本文鏈接:http://sikaile.net/guanlilunwen/zhengwuguanli/1882739.html
最近更新
教材專著