34基于并行工程的汽車膠管企業(yè)新產(chǎn)品開發(fā)項目管理體系研究
本文關(guān)鍵詞:博澤汽車零部件公司產(chǎn)品研發(fā)過程中的項目管理優(yōu)化研究,由筆耕文化傳播整理發(fā)布。
基于并行工程的汽車膠管企業(yè)新產(chǎn)品開發(fā)項目管理體系;【29]S.M.Sapuan,M.R.Osman;theautomotiveoftheartoft;engineeringand【30】EZ.Kru;onSilva,etc.ConcurrentDF;MaterialsandManufacturin;【3l】WuDeshengDash,KefanX;ofcon
基于并行工程的汽車膠管企業(yè)新產(chǎn)品開發(fā)項目管理體系研究.以V公司為例
【29]S.M.Sapuan,M.R.Osman,Y.Nukman.State
theautomotiveoftheartoftheconcurrentengineeringtechniqueinindustry[jJ】.JournalofEngineeringDesign.2006,17(2):143-157.
engineeringand【30】EZ.Krumenauer,C.T.Matayoshi,I.B.da
onSilva,etc.ConcurrentDFMAapproachesthedevelopmentofautomotivepanelsanddoors[J].JournalofAchievementsin
MaterialsandManufacturingEngineering.2008,31(2):690.
【3l】WuDeshengDash,KefanXie,GangChen,PingGui.ARiskAnalysisModelinConcurrentEngineeringProductDevelopment[J],RiskAnalysis.2010(9):1440—1453.
ofconcurrentengineeringinthesuppliersto【32】J.X.Gao,B.M.Manson,EKyratsis.Implementation
theautomotiveindustry[J].JournalofMaterialsProcessing1'ech.2000.107(1):201-208.
Conceptual
CompositeDesignoftheConcurrentEngineering【33】S.M.Sapuan.APolymeric-BasedDesignSystemforAutomotivePedals[J].AmericanJournalofApplied
Sciences,,2005,2(2):514.
【34】黃擎.項目管理組織及績效激勵在汽車零部件企業(yè)的應(yīng)用【D】.上海交通大學(xué),2007.[35】賀顯軍.博世汽車零部件公司產(chǎn)品開發(fā)項目管理體系研究【D】.湖南大學(xué),2010.
【36】陳國斌.V公司汽車零配件項目成本管理研究【D】.華中師范大學(xué),2011.
【37】劉紅燕.汽車零部件制造的項目管理:跨國企業(yè)與中國同行業(yè)的比較與借鑒【D】.南開大學(xué)2008.
【38】王增輝,劉世華.淺析汽車零部件新產(chǎn)品開發(fā)項目管理思路與模式【J】.研究與開發(fā).2009(09):077-080.
【39】李筱峰顧目管理軟件在汽車零部件企業(yè)的應(yīng)用【D】.同濟大學(xué)2007.
【40】王輝.DPES汽車零部件開發(fā)項目質(zhì)量管理的應(yīng)用研究【D】.上海交通大學(xué),2008.
【41】唐均.項目風(fēng)險管理在汽車零部件行業(yè)新產(chǎn)品導(dǎo)入項目中的應(yīng)用【D】.復(fù)旦大學(xué),2009.
【42】田勇.質(zhì)量工具在汽車零部件新產(chǎn)品開發(fā)項目管理中的應(yīng)用【D】.吉林大學(xué)2006.
[43】施子音顧目組合管理在汽車零部件研發(fā)中的應(yīng)用研究【D】.大連理工大學(xué),2009.
[44】劉永愛,馬歆卉.項目組合管理思想在研發(fā)項目管理中的運用研究【J】.集團經(jīng)濟研究.2007(09):268-269.
[45】黃鎖成.項目管理技術(shù)在汽車產(chǎn)品開發(fā)中的應(yīng)用探討【J】.北京汽車.2012(4):1-5,31.
【46】甘國輝.論項目管理在汽車零部件企業(yè)新產(chǎn)品開發(fā)項目中的策略【J】.項目管理技術(shù).2011(7):99—103.
【47】Patterson,FionaD.Project
manufacturingindustry:executiveriskmanagementanditsapplicationintotheautomotivesummary[D】.UniversityofWarwick,2002.
[48】高宏亮.博澤汽車零部件公司產(chǎn)品研發(fā)過程中的項目管理優(yōu)化研究【D】.華東理工大學(xué)。2012.
【49】孫晨陽.項目管理在J公司汽車發(fā)動機研發(fā)中的應(yīng)用研究p】.蘭州大學(xué),2011.74
青島科技大學(xué)研究生學(xué)位論文
【50】黃思宇.BR公司在華新產(chǎn)品開發(fā)項目管理流程改進策略研究【D】.上海外國語大學(xué),2013.
【5l】王志兵.A汽車儀表企業(yè)產(chǎn)品及過程研發(fā)項目管理研究【D】.西北農(nóng)林科技大學(xué),2012.
【52】張興賢.大陸汽車電子(長春)有限公司項目管理問題研究【D】.長春理工大學(xué),2012.
【53】徐亮輝.汽車零部件企業(yè)的項目管理成熟度模型研究【D】上海交通大學(xué),2012.
【54】張洪起.汽車膠管行業(yè)競爭狀況、影響因素和技術(shù)水平淺析四.中國橡膠,2012(13):8.14.
【55】郝偉,梁西正,王楠等.汽車膠管的生產(chǎn)技術(shù)與市場【J】.世界橡膠工業(yè),20l1(12):36-44.
【56】ISO/TSl6949第三版2009.06.15:質(zhì)量管理體系.汽車生產(chǎn)件及相關(guān)服務(wù)件組織應(yīng)用IS09001:2008的特殊要求.
【57】V公司內(nèi)部績效考核文件.
【58】Ohmac
InformationYoshitsugu,HasegawaSusumu,OkudaMinom.Multi—projectscheduling【J】.JournalofProcessing,1992,(2).
Carlo.Hierarchicalmodelsfor【59】SperanzaM.Grazia,VerceUismulti-projectplanningand
scheduling[J].EuropeanJoumalofOperationalResearch,1993(2).
supportsystembased011【60】TsukadaKoji,OkadaKen-ichi,MatsushitaYutaka.Multi-project
Multiplicityoftask[J】.Proceedings-IEEEComputerSociety’SIntemationalComputerSoftware&ApplicationsConferenceNov一11,1994.
【61】RautiainerKricltian,NissinenMaarit,LasseiusCasper.Improvingmulti-projectmanagementin
ontwoproductdevelopment
Systemorganizations[J].Proceeding7,2000.ofheHawaiiInternationalConferenceSciences,Jan4-Jan
【62】MeredithJ.R.,MantelS.J.項目管理:管理新視角(第四版)【M】.北京:電子工業(yè)出版社,2002,8.
【63】曹旭光.青島一汽新產(chǎn)品開發(fā)流程研究[D】.中國海洋大學(xué),2010.
【64】胡盛文.基于并行工程的產(chǎn)品開發(fā)過程建模及應(yīng)用研究【D】.南昌大e#,2009.
【65】V.Krishnan.Managing
Development[J].IEEEthesimultaneousExecutionofCoupledPhasesinConcurrentProductonTransactions
DEngineeringManagement,1996(2).FrameworktoOverlap【66】V.Krishnan,StevenEppinger,DanielE.Whitney.AModel.Based
ProductDevelopmentActivities[J].ManagementScience,1997(4).
【67】ChristophH.Loeb,Michael
AdoptingT.Pich.SelectingR&DProjectsatBMW:AonCaseStudyofMathematicalProgrammingModels[J].IEEETransactionsEngineeringManagement,2001(1).
【68】TaehoAhn,S.SeluckErengue.Theresourceconstrainedprojectschedul啦problem
withwithmultiplecrashablemocles:Aheuristicprocedure[J].EruopeanjournalShopofoperational,1995(3).Schedulingrcsource【69】S.Dauzere—peres,W.Roux,J.B.Lasserre.Multi—resouce
Flesibility[J].EuropeanJournalofOperationalResearch,1998(107).75
基于并行工程的汽車膠管企業(yè)新產(chǎn)品開發(fā)項目管理體系研究.以V公司為例
[70】MeiLiu。KnowledgebasedIntegratedProcessManagementinLifecycleofProductDevelopment[J].ConcurrentEngineering-TheWorldwideEngineeringGrid,TsinghuaUniversityPressandSpringer,2004:193-198.
【7l】KudaZhi.MethodofProductDevelopmentProcessAnalysisandReengineeringforConcurrentEngineering[J].JournalofMaterialsScienceForum,2004:471-472,770.
【72】JanezKusar,JozeDuhovnik,JanezGrum,MarkoStarbek.HowtoreducenewProductdevelopmenttime[J].RoboticsandComputer-/ntegratedManufacturing,2004,(20).
[73】MassimoDeFalco,RobertoMachiaroli.Timingofcontrolactivityinprojectmanagement
【J】.InternationalJournalofprojectmanagement,1998(1).
【74】SGM-d'QP培訓(xùn)資料:全球供應(yīng)商質(zhì)量改進程序.供應(yīng)商質(zhì)量改進16步.
【75】劉元順.汽車自動變速箱油冷卻膠管(TOCHose)的研制【1)】.青島科技大學(xué).2008年.
【76】彭岳華.并行工程-面向產(chǎn)品的全生命周期的設(shè)計[J】.中國汽車制造,2007(2):27.29.
【77】ProjectManagementInstitute,AGuidetotheProjectManagementBodyofKnowledge(PMBOK愿X3uide)(ThirdEdition)【MI.ProjectManagementInstitute,Inc,2004.
【78】DavidJamesBryde.ProjectManagementconcepm,methodsandapplication[J].IntemationalJournalofOperations&ProductionManagement.2003(7):775-793.
【79】HaroldKerzner.ProjectManagement:ASystemsApproachtoPlanning,andContlrolling(EighthEdition)[M].JohnWiley&Sons,Inc.:2003.
【80】J.DavidsonFrame.ManagingProjectsinOrganizations:HowtoMaketheBestUseofTime,Techniques,andPeople(ThirdEdition)【M】.JohnWiley&Sons,Inc.:2003.
【8l】魯耀斌,趙玲譯.項目管理(原書第二版)【M】.北京:機械工業(yè)出版社,2010年6月.
[82】(美)羅伯特B斯圖爾特,(中)邱菀華.價值工程方法基礎(chǔ)【M】.北京:機械工業(yè)出版社,2007.76
青島科技大學(xué)研究生學(xué)位論文
致謝
這是我第三次在青島科技大學(xué)進行學(xué)習(xí)了,第一次是1989年考入當時的青島化工學(xué)院化工系開始本科學(xué)習(xí),第二次是2004年考入青島科技大學(xué),成為青島科技大學(xué)第一批材料工程碩士,2012年又懷著要提高自己管理能力的念頭,第三次考入了青島科技大學(xué)經(jīng)濟與管理學(xué)院成為一名MBA學(xué)員;叵肫鹪谇鄭u科技大學(xué)兩年的MBA學(xué)習(xí)生活,感慨頗多,心中充滿了感激。這里我要對所有幫助和鼓勵過我的人們致謝!
論文的完成首先要感謝我的導(dǎo)師一董華老師。董老師對本論文的主題構(gòu)思、提綱擬定到最后的修改都傾注了大量的心血。兩年來,董老師的言傳身教給我留下了非常深的印象,在此謹向董老師致以最衷心的感謝!
感謝青島科技大學(xué)的各位老師,是你們教導(dǎo)拓展了我的知識領(lǐng)域,你們的敬業(yè)精神也值得我一生學(xué)習(xí)!感謝師弟師妹們在我論文的寫作、校訂和打印過程中提供的幫助!
感謝固恩治公司的同事們在我對論文數(shù)據(jù)收集和整理過程中提供的無私幫助。
感謝我的家人在兩年之間對我的付出!最后,我要感謝參與本論文審閱和評議的各位專家、教授!
下載地址:34基于并行工程的汽車膠管企業(yè)新產(chǎn)品開發(fā)項目管理體系研究——以V公司為例 .Doc
【】最新搜索
基于并行工程的汽車膠管企業(yè)新產(chǎn)品開發(fā)項目管理體系研究——以V公司為例
武松主要傳達出的是
信用卡催收錄音
對十八大以來我國反腐形勢的思考論文
fmea表
立磨機的風(fēng)量調(diào)節(jié)決定了成品的產(chǎn)量和細度
電子產(chǎn)品行業(yè)采購買家
大型風(fēng)電場建模及接入甘肅嘉酒電網(wǎng)仿真分析
孝感地區(qū)土特產(chǎn)調(diào)查問卷
新聞大求真觀后感王藝凡Microsoft Word 文檔
本文關(guān)鍵詞:博澤汽車零部件公司產(chǎn)品研發(fā)過程中的項目管理優(yōu)化研究,由筆耕文化傳播整理發(fā)布。
本文編號:46227
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/46227.html