H銀行MarginFX新增LP項(xiàng)目計(jì)劃與控制研究
[Abstract]:H bank foreign exchange [V exhibition trading service is an investment product involving leverage and high risk degree. H bank foreign exchange trading platform has good system stability, which makes the trading of investors safer, simpler and faster. Based on the theory of IT project management, this paper analyzes the process of H bank foreign exchange [V exhibition platform] new liquidity provider project from start to end, focusing on the core and weak parts of the project, that is, the planning and control management of the project. Carry on the optimization design and the concrete research. Through the progress, cost and quality of the three aspects of planning and control to ensure the smooth launch of the system project. In the aspect of project plan formulation, this paper comprehensively introduces the major milestones of the project, the working relationship of WBS, the organizational structure and human resource plan, and estimates the project activity time through the combination of expert judgment method and plan evaluation technology. The activities are described in detail and the Gantt chart and network chart are drawn up, the main figures of each activity are identified, and the project cost plan and quality plan are worked out. In the aspect of project control, the progress of the project is controlled by the time limit optimization method, the cost progress of the project is evaluated by earned value analysis method, and the quality of the project is controlled by evaluation and test. This paper combines the advantages of modern IT project management and traditional project management, improves the overall level and development efficiency of H bank foreign exchange system development project, is beneficial to the smooth development of similar projects, and provides effective organization and arrangement. This study enriches the research in the field of IT project management and increases the experience of foreign exchange trading platform project using IT project management.
【學(xué)位授予單位】:華南理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類(lèi)號(hào)】:F831.2
【共引文獻(xiàn)】
相關(guān)期刊論文 前6條
1 張靜文;李若楠;;關(guān)鍵鏈項(xiàng)目調(diào)度方法研究評(píng)述綜述與評(píng)論[J];控制與決策;2013年09期
2 張廣帥;張煜東;吉根林;;蟻群算法求解TSP綜述[J];南京師范大學(xué)學(xué)報(bào)(工程技術(shù)版);2014年04期
3 宮麗娜;;基于蟻群-關(guān)鍵鏈的資源受限項(xiàng)目調(diào)度[J];嘉興學(xué)院學(xué)報(bào);2014年03期
4 董軍;馮天天;南曉紅;;基于SD的資源約束型工程項(xiàng)目群進(jìn)度管理研究[J];陜西電力;2014年09期
5 懷麗波;崔榮一;趙亞慧;;基于改進(jìn)的蟻群算法的教室管理優(yōu)化問(wèn)題[J];延邊大學(xué)學(xué)報(bào)(自然科學(xué)版);2014年04期
6 徐小峰;李想;劉家國(guó);;項(xiàng)目關(guān)鍵鏈資源計(jì)劃進(jìn)度偏差預(yù)警控制模型[J];系統(tǒng)工程學(xué)報(bào);2014年06期
相關(guān)博士學(xué)位論文 前3條
1 金敏力;基于關(guān)鍵鏈的項(xiàng)目?jī)?yōu)化調(diào)度問(wèn)題研究[D];哈爾濱工業(yè)大學(xué);2013年
2 付磊;基于關(guān)鍵鏈的復(fù)雜產(chǎn)品研發(fā)多項(xiàng)目調(diào)度問(wèn)題研究[D];合肥工業(yè)大學(xué);2013年
3 聶慧;建設(shè)工程施工項(xiàng)目人力資源調(diào)度的模型與方法研究[D];中國(guó)礦業(yè)大學(xué)(北京);2014年
相關(guān)碩士學(xué)位論文 前10條
1 袁乾龍;考慮不確定性的項(xiàng)目進(jìn)度控制研究[D];華東理工大學(xué);2013年
2 張斌;山西永濟(jì)市35kV變電站增容改造項(xiàng)目進(jìn)度管理的研究[D];華北電力大學(xué);2013年
3 王達(dá)宇;陡河發(fā)電廠機(jī)組檢修項(xiàng)目管理優(yōu)化研究[D];華北電力大學(xué);2013年
4 鐘運(yùn)彬;CF公司外貿(mào)制造項(xiàng)目進(jìn)度管理研究[D];電子科技大學(xué);2013年
5 肖寒;變電改造工程項(xiàng)目進(jìn)度管理評(píng)價(jià)研究[D];華北電力大學(xué);2013年
6 周棠;J電信公司外勤管家軟件開(kāi)發(fā)項(xiàng)目進(jìn)度管理優(yōu)化研究[D];南昌大學(xué);2013年
7 汪若洋;項(xiàng)目進(jìn)度管理方法及其應(yīng)用研究[D];解放軍信息工程大學(xué);2013年
8 劉德金;基于關(guān)鍵鏈的鋼結(jié)構(gòu)制造企業(yè)多項(xiàng)目計(jì)劃管理研究[D];重慶大學(xué);2013年
9 莊蔚杰;基于關(guān)鍵鏈的多項(xiàng)目變更管理研究[D];上海交通大學(xué);2013年
10 劉旭;基于關(guān)鍵鏈技術(shù)的大型糧食物流園區(qū)進(jìn)度風(fēng)險(xiǎn)控制研究[D];河南工業(yè)大學(xué);2013年
,本文編號(hào):2485782
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2485782.html