珊溪水庫工程施工管理
發(fā)布時(shí)間:2019-04-25 19:37
【摘要】::珊溪水庫工程是目前國內(nèi)在建的第二高壩。樞紐施工的特點(diǎn)是 :工期緊、強(qiáng)度大、干擾多、要求高、施工工藝復(fù)雜。由于施工中實(shí)施了項(xiàng)目管理中的計(jì)劃管理、經(jīng)濟(jì)管理、設(shè)備管理、質(zhì)量管理、安全管理和人員管理 ,組織合理、運(yùn)作科學(xué) ,用 32個(gè)月時(shí)間實(shí)現(xiàn)了 2 0 0 0年 5月按期下閘蓄水、6月 2 8日首臺(tái)機(jī)組提前發(fā)電的目標(biāo) ,為高面板堆石壩施工積累了經(jīng)驗(yàn)。
[Abstract]:Shanxi Reservoir Project is the second tallest dam under construction in China. The characteristics of hub construction are: time limit is tight, strength is big, interference is many, requirement is high, construction technology is complex. As a result of the implementation of project management in the planning management, economic management, equipment management, quality management, safety management and personnel management, reasonable organization, scientific operation, The water storage target of the lower gate in May, 2000 and the first unit on June 28, 2000 were achieved in 32 months. The experience has been accumulated for the construction of high face rockfill dam.
【作者單位】: 中國水利水電第十二工程局第二分局!浙江文成325304
【分類號(hào)】:TV5
本文編號(hào):2465400
[Abstract]:Shanxi Reservoir Project is the second tallest dam under construction in China. The characteristics of hub construction are: time limit is tight, strength is big, interference is many, requirement is high, construction technology is complex. As a result of the implementation of project management in the planning management, economic management, equipment management, quality management, safety management and personnel management, reasonable organization, scientific operation, The water storage target of the lower gate in May, 2000 and the first unit on June 28, 2000 were achieved in 32 months. The experience has been accumulated for the construction of high face rockfill dam.
【作者單位】: 中國水利水電第十二工程局第二分局!浙江文成325304
【分類號(hào)】:TV5
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 陳新樂;珊溪水庫泄洪洞鋼襯制作[J];水電站機(jī)電技術(shù);1999年02期
2 林澤強(qiáng);珊溪水庫工程建設(shè)概要[J];水力發(fā)電;2000年10期
3 吳垂?jié)?優(yōu)質(zhì)高效建設(shè)珊溪水庫工程[J];水力發(fā)電;2000年10期
4 陳澤鑫;珊溪水庫工程施工管理[J];水力發(fā)電;2000年10期
5 陳振文;珊溪水庫工程樞紐總布置[J];水力發(fā)電;2000年10期
6 徐躍明;珊溪水庫泄洪洞設(shè)計(jì)[J];水力發(fā)電;2000年10期
7 應(yīng)寧堅(jiān);珊溪水庫面板堆石壩施工及其特點(diǎn)[J];水力發(fā)電;2000年10期
8 李中方;珊溪水庫工程開挖爆破施工[J];水力發(fā)電;2000年10期
9 陳文明,周清水;珊溪混凝土面板堆石壩墊層料生產(chǎn)與填筑[J];水力發(fā)電;2000年10期
10 應(yīng)寧堅(jiān),朱麗萍;珊溪水庫面板堆石壩施工渡汛保護(hù)方案淺析[J];水力發(fā)電;2000年10期
,本文編號(hào):2465400
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2465400.html
最近更新
教材專著