A企業(yè)數(shù)字電氣平臺項目進度管理研究
[Abstract]:With the quickening of the construction process of enterprise informatization, the traditional hydropower survey and design enterprises are also strengthening the construction of informatization and digital projects, in order to realize the optimization of business system and improve the efficiency and competitiveness of design. In the construction process of such software projects, multi-department and multi-professional participation is often required, and the implementation and R & D results are required to be put into production and application in time. Because of the high complexity and uncertainty of the software project, it is necessary to apply the systematic project management method in the management of the software project to solve the informatization of the enterprise, for the survey and design enterprises which take the design as the main business. The progress management problems faced in the process of rapid development and construction of digital projects. Firstly, on the basis of collecting and reading relevant documents, this paper studies the project schedule management at home and abroad, and focuses on the theoretical basis of project management and project schedule management in the process of summarizing the relevant theories. The software project is different from the traditional project, and the characteristics of the software project are compared and analyzed. In this paper, the characteristics of organization structure of enterprise A and the project management mode and management status of digital center in enterprise information department are studied, and the existing problems and root causes of software project management in enterprise A are summarized. Taking the typical digital electric platform project of A enterprise digital center as an example, this paper applies the method of project management to the systematic management of the project, especially focusing on the outstanding problem of the overdue period of the project in the past. Focus on project schedule management research. Based on the theory of job structure decomposition, plan evaluation, critical path method, job responsibility matrix and earned value management, project management is carried out. In the research process, the plan management, change management and dynamic monitoring of the project are studied in detail. The earned value management is used to monitor the progress and cost of the project dynamically. In the research process, the deficiency of earned value analysis is also pointed out. The earned value analysis method based on critical path is applied to distinguish the earned value between critical path and non-critical path, and the source of deviation is more precise, so that the personnel at all levels of the project have a more accurate understanding of the progress of the project. According to the results of earned value analysis, timely measures are taken to make the project delivery on time, the progress of the project is effectively controlled, and the R & D results are converted into production and application in time. In the process of research, the methods of project implementation are summarized and refined, which provides a feasible project management method and experience for the progress management of software projects in A enterprise.
【學位授予單位】:電子科技大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:F270.7
【相似文獻】
相關(guān)期刊論文 前10條
1 劉耕,王學軍;國內(nèi)外項目進度管理的比較及建議[J];重慶交通學院學報;2003年S1期
2 章勇武,尤建新,黃力 ,馬國豐;高速公路項目進度管理信息系統(tǒng)設(shè)計研究[J];上海管理科學;2005年05期
3 馬國豐;陳強;;項目進度管理的研究現(xiàn)狀及其展望[J];上海管理科學;2006年04期
4 周曉麗;;項目進度管理知識研究[J];現(xiàn)代商貿(mào)工業(yè);2009年08期
5 劉曉東;;基于知識管理的工程項目進度管理持續(xù)改進研究[J];建筑經(jīng)濟;2009年05期
6 張俊光;;中小型軟件項目進度管理方法研究[J];管理現(xiàn)代化;2011年05期
7 徐頌;黃文;;里程碑控制在研發(fā)項目進度管理中的應(yīng)用[J];項目管理技術(shù);2011年05期
8 任喜杰;;工程項目進度管理研究[J];工業(yè)設(shè)計;2012年03期
9 高亞;;淺談工程項目進度管理[J];現(xiàn)代商業(yè);2013年12期
10 熊文彬;;工程項目進度管理及控制探討[J];價值工程;2013年33期
相關(guān)會議論文 前3條
1 楊正茂;;維生素C質(zhì)量升級項目進度管理研究[A];第十屆沈陽科學學術(shù)年會論文集(農(nóng)業(yè)科學與醫(yī)藥科學分冊)[C];2013年
2 高華北;張花玲;周湘暉;黃曦;丁霞;王麗;鄢旭輝;嚴國興;;甘特圖在職業(yè)病危害評價項目進度管理中的應(yīng)用[A];湖南省預(yù)防醫(yī)學會勞動衛(wèi)生專業(yè)委員會2008年學術(shù)交流會議論文集[C];2008年
3 孫慧;王麗華;;多層次模糊控制在工程項目進度管理中的應(yīng)用[A];2005年中國機械工程學會年會論文集[C];2005年
相關(guān)重要報紙文章 前7條
1 彭潔;昆明辦審計項目進度管理實現(xiàn)規(guī)范化[N];中國審計報;2013年
2 ;遼寧審計廳出臺審計項目進度管理辦法[N];財會信報;2010年
3 曹忻;云南省審計廳實行項目進度管理[N];中國審計報;2010年
4 項榮;深圳辦加強審計項目進度管理[N];中國審計報;2012年
5 小城;遼寧出臺審計項目進度管理辦法[N];中國稅務(wù)報;2010年
6 記者 李穎;增強藏區(qū)自我造血能力 助推藏區(qū)跨越發(fā)展[N];成都日報;2014年
7 通訊員 劉永良;雙永高速永定段完成投資15億元[N];閩西日報;2010年
相關(guān)博士學位論文 前2條
1 魏從剛;網(wǎng)絡(luò)化協(xié)同制造項目進度管理技術(shù)研究[D];西北工業(yè)大學;2006年
2 張敏;項目進度管理的行為不確定性及其控制策略研究[D];華中科技大學;2011年
相關(guān)碩士學位論文 前10條
1 秦國祥;HP公司軟件項目進度管理研究[D];華東理工大學;2015年
2 樊艷冬;DB總承包模式公路建設(shè)項目進度管理研究[D];長安大學;2015年
3 毛紅峰;法雷奧后霧燈開發(fā)項目進度管理研究[D];蘭州大學;2015年
4 李婷婷;A公司服務(wù)器新產(chǎn)品開發(fā)項目進度管理研究[D];蘇州大學;2015年
5 周鵬超;基于4D-BIM技術(shù)的工程項目進度管理研究[D];江西理工大學;2015年
6 溫洪彬;移動通信工程項目進度管理的優(yōu)化研究[D];北京建筑大學;2014年
7 衛(wèi)紅霞;雙河110kV智能變電站項目進度管理研究[D];華北電力大學;2015年
8 孫卓;110kV陽城變電站改造項目進度管理研究[D];華北電力大學;2015年
9 孫潤潤;基于BIM的城市軌道交通項目進度管理研究[D];中國礦業(yè)大學;2015年
10 張國勝;表面廢水處理工程項目進度管理研究[D];中國科學院大學(工程管理與信息技術(shù)學院);2015年
,本文編號:2435306
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2435306.html