郴州煙葉復(fù)烤廠異地搬遷改造項(xiàng)目風(fēng)險(xiǎn)分析與監(jiān)管研究
[Abstract]:After entering the 21st century, with China's entry into WTO and the further deepening of economic globalization, domestic tobacco enterprises are facing more and more fierce international competition. In order to improve the anti-risk ability and cultivate the first-class international tobacco enterprises, the tobacco monopoly bureau of China has put forward a series of reorganization and merger policies, which have achieved obvious results. In order to adapt to the new competitive environment, the integrated cigarette enterprises have carried out large-scale technological transformation and upgrading in order to improve their market competitiveness. Under this background, Hunan Tobacco redrying Co., Ltd., in order to further expand and strengthen, moved its subsidiary Chenzhou rebaking plant from Chenzhou City to Beihu District for technical upgrading. The relocation and transformation of an enterprise is a relatively concentrated investment project with a long time span and a wide range of factors that need to be controlled and coordinated, so it is faced with a variety of risks. Taking the relocation and renovation project of Chenzhou re-baking plant as the research object, combined with the basic principles of modern risk management, this paper summarizes the past experience and existing achievements, and analyzes the current situation of the reroasting plant. A hierarchical model is used to decompose the work structure of the project. Based on the analysis of the main risk factors of the project, the risk assessment of Chenzhou re-baking plant project was carried out by means of expert scoring and risk matrix diagram, and the main risks and their harm in the project were clarified. It provides the scientific basis for the project management to deal with and control the risk. At the same time, combined with the risk management objectives and the principles of risk management strategy formulation, this paper studies and puts forward the countermeasures and risk monitoring measures for the risk of relocation and renovation projects. Furthermore, the expected effect of the project risk management strategy is evaluated, and the corresponding safeguard measures are put forward. The relocation and transformation project is complicated and difficult to grasp. Through the risk identification, analysis and evaluation of the relocation and transformation project of Chenzhou re-baking Plant, this paper puts forward the methods of risk control, identification and management for the relocation and transformation project of tobacco industry. It provides a reference and reference for the actual decision-makers, and has a good reference value for the smooth implementation of the enterprise's relocation and transformation project.
【學(xué)位授予單位】:湖南大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:F272.3;F426.8
【參考文獻(xiàn)】
相關(guān)期刊論文 前7條
1 鄭超;;基于項(xiàng)目管理的商業(yè)銀行并購(gòu)貸款風(fēng)險(xiǎn)管理[J];現(xiàn)代管理科學(xué);2012年01期
2 李永忠;馮俊文;高朋;王華亭;;基于群組決策系統(tǒng)的QFD項(xiàng)目風(fēng)險(xiǎn)管理框架評(píng)估研究[J];技術(shù)經(jīng)濟(jì);2010年05期
3 李艷飛;戚安邦;;我國(guó)工程項(xiàng)目風(fēng)險(xiǎn)管理制度問題與對(duì)策分析[J];項(xiàng)目管理技術(shù);2010年02期
4 尹志軍;陳立文;;項(xiàng)目投資風(fēng)險(xiǎn)管理體系模型研究[J];河北工業(yè)大學(xué)學(xué)報(bào);2009年01期
5 余建星;許華力;李彥蒼;譚振東;;施工項(xiàng)目風(fēng)險(xiǎn)定量研究[J];水利水電技術(shù);2007年10期
6 許暉;余娟;;企業(yè)國(guó)際化經(jīng)營(yíng)中關(guān)鍵風(fēng)險(xiǎn)的識(shí)別研究[J];南開管理評(píng)論;2007年04期
7 盧有杰;項(xiàng)目風(fēng)險(xiǎn)管理[J];中國(guó)投資與建設(shè);1997年02期
相關(guān)碩士學(xué)位論文 前2條
1 邱介茗;全面風(fēng)險(xiǎn)管理框架下我國(guó)商業(yè)銀行信用風(fēng)險(xiǎn)管理策略研究[D];云南大學(xué);2014年
2 許琳;卷煙企業(yè)易地搬遷項(xiàng)目進(jìn)度管理模式研究[D];中國(guó)海洋大學(xué);2009年
,本文編號(hào):2434798
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2434798.html