DDH泵站安標改造項目進度計劃與控制研究
[Abstract]:As a subsidiary enterprise of drainage company specializing in drainage operation, Zhuer Transportation Branch has always aimed to improve the safety level of production site of drainage pump station, enhance the safety culture atmosphere, and enhance the flood prevention and security ability of the enterprise. Increasing the pumping station site equipment and working environment safety investment. The reform of safety standardization emphasizes that people, machines, environment and management are in a safe state in the process of production and conform to the safety standards stipulated in the safety standardization norms. And through the mandatory review of the National Security Administration and obtained the corresponding level of qualifications. For the newly built DDH pumping station, Zhuer Transportation Branch will carry out safety standardization transformation. The main research contents of this paper are as follows: (1) the background of DDH pump station safety standard reconstruction project is studied and combed, and the reconstruction contents and related work of safety facilities, pump station environment and so on are discussed in order to realize the project goal. The organizational division of labor and related technical schemes are clarified. (2) the project tasks are structured and sorted, the task time is estimated, and the overall progress plan is made by using Gantt chart, network diagram, milestone plan, etc. On this basis, the progress plan of the project is optimized from the aspects of sound organization and management, rational allocation of resources and improvement of the implementation plan. (3) the problems that may affect the implementation of the progress plan in the reconstruction project of DDH pumping station safety standard are discussed. Including the project schedule deviation and work content change and so on carries on the analysis. Through the research of this paper, the control procedures and measures to ensure the effective implementation of the progress plan are summarized, and the problems that can be further studied are put forward. It plays a good demonstration significance for the implementation schedule and control of large-scale comprehensive pumping station safety standardization reconstruction project by using the project management theory scientifically and reasonably.
【學位授予單位】:東北大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:TV511
【相似文獻】
相關期刊論文 前10條
1 趙道致,廖華;遺傳算法在項目進度計劃中的應用[J];工業(yè)工程與管理;2004年06期
2 熊煥淮,楊振華;監(jiān)理如何審查和調(diào)整多標段工程項目進度計劃[J];江西水利科技;2002年S1期
3 柯暢;;蒙特卡羅仿真在制定項目進度計劃中的應用[J];機電技術(shù);2011年01期
4 張春生;嚴廣樂;;基于設計結(jié)構(gòu)矩陣的項目進度計劃模型研究[J];科技與管理;2012年03期
5 李立一;;工程項目進度計劃的實施與調(diào)整[J];大眾科技;2013年05期
6 郭云濤;白思俊;萬小兵;;基于DSM的項目成組管理模式的研究[J];工業(yè)工程;2007年04期
7 邱威;;項目進度計劃動態(tài)管理模式在南京保障房項目施工中的應用[J];經(jīng)營管理者;2013年11期
8 蔣根謀;一種新的線性工程項目進度計劃的編制方法[J];鐵道建筑;2005年11期
9 林軍;劉朝輝;沈志剛;;一種資源約束下的工程項目進度計劃優(yōu)化方法[J];工程建設與設計;2006年11期
10 喬志佳;;淺談工程項目進度計劃制定與優(yōu)化──以YJL住宅小區(qū)工程項目為例[J];行政事業(yè)資產(chǎn)與財務;2013年20期
相關會議論文 前3條
1 李宏信;董秀偉;張玉;;淺談項目進度計劃制定及管理[A];第九屆河南省汽車工程技術(shù)研討會論文集[C];2012年
2 余欽墅;;淺談測繪項目進度計劃管理[A];浙江測繪(2012第2期總第111期)[C];2012年
3 李健民;夏松林;;基于MONTE-CARLO模擬的項目進度計劃風險評估[A];中國海洋石油總公司第三屆海洋工程技術(shù)年會論文集[C];2012年
相關重要報紙文章 前3條
1 本報評論員;咬定目標不松勁[N];益陽日報;2009年
2 記者 工力;我市加快重點工程建設步伐[N];臨汾日報;2011年
3 記者 劉艷 通訊員 李春妮;翔安隧道今年將開挖2000米[N];廈門日報;2006年
相關博士學位論文 前1條
1 章勇武;高速公路建設工程進度的柔性化管理研究[D];同濟大學;2005年
相關碩士學位論文 前10條
1 劉婷;某油田25-1生活樓項目進度計劃研究[D];吉林大學;2014年
2 孫盛楠;環(huán)保學院新校區(qū)綜合樓項目進度計劃編制與控制研究[D];燕山大學;2015年
3 王進會;施耐德數(shù)據(jù)中心產(chǎn)品研發(fā)項目進度計劃與控制[D];上海交通大學;2015年
4 付恩莉;戚機公司泰車研制項目進度計劃與控制研究[D];大連理工大學;2015年
5 郭志衛(wèi);M公司轉(zhuǎn)向節(jié)生產(chǎn)建設項目進度計劃與控制[D];大連理工大學;2015年
6 陳磊;人力資源約束下某建筑工程項目進度計劃研究[D];電子科技大學;2015年
7 張偉;轎車底盤耦合桿國產(chǎn)化項目進度計劃管理[D];上海交通大學;2014年
8 蘇奔;高層建筑滅火系統(tǒng)研發(fā)項目進度計劃制定研究[D];北京工業(yè)大學;2015年
9 張亞妮;XX公司研發(fā)項目進度計劃與控制改進研究[D];電子科技大學;2014年
10 邱柏榕;LA項目進度計劃的研究[D];華南理工大學;2015年
,本文編號:2394484
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2394484.html