敏捷開發(fā)普菲斯冷鏈系統(tǒng)項(xiàng)目風(fēng)險(xiǎn)管理研究
[Abstract]:Since the Agile development method was put forward in the middle of 1990s, after more than 20 years of development and evolution, it has gradually been accepted by development teams of various sizes and types. Unlike the traditional software development model based on the waterfall model, agile development extends the idea of iterative development, emphasizes adaptability and people-oriented, and makes up for the deficiency that the traditional software development model can not respond to the changing business requirements in time. In the Pafis cold chain logistics system project, in order to deal with the complex and immature business processes caused by the large amount of demand uncertainty and urgent system online time requirements, A strategy for project implementation using agile development patterns is developed. On the other hand, the implicit risk management method of agile development method can not meet the needs of management and audit. At the same time, the traditional risk management process and agile development methods can not be easily pieced together because of the difference of management ideas. In order to solve the contradiction between agile development method and risk management process, this paper deeply studies the characteristics of agile development and traditional risk management. At the same time, combining the project practice, aiming at the four major risk sources of agile development, such as technology, requirement, project management and personnel, using What/Why method, risk statement, risk multiple, risk exposure value, risk Kanban and risk burnout chart, etc. This paper puts forward a set of effective risk management methods for agile development projects. This method not only carries out the idea that agile development methods pay more attention to product and document, but also to collaboration and management, and meets the requirements of risk management process to control risks effectively. The main contributions of this paper to agile project management are as follows: 1. It is proposed to manage the risk identification and monitoring process in agile project through What/Why method, daily standing meeting, risk Kanban and risk burnout chart. By using the agile "collaboration" principle, the risk management activities, which were handled by the project manager alone, were extended to the whole project team, which not only reduced the management pressure but also strengthened the project team's sense of belonging. It is proposed that risk management activities be carried out more efficiently through quantitative analysis of risks in agile projects by means of risk multiplier and risk exposure value. By suspending or postponing the content of the project with poor input-output ratio or decomposing the work, the non-productive workload within the project will be reduced and the efficiency of project execution will be improved. Using agile thinking to simplify the risk management process: in the Pafis project, the project team spends only 10% of the time of the traditional method to achieve 85% risk management effect through the practice of the method proposed in this paper.
【學(xué)位授予單位】:東華大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:F272.3;F259.712
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 Mike Sisco;;召開高效的項(xiàng)目啟動(dòng)會(huì)議[J];每周電腦報(bào);2007年02期
2 姚晉川;;“一體五制”夯實(shí)項(xiàng)目精細(xì)管理基礎(chǔ)[J];施工企業(yè)管理;2013年04期
3 ;沒有經(jīng)驗(yàn)者項(xiàng)目如何選[J];大眾商務(wù);2008年20期
4 王玉楓;論項(xiàng)目初始階段工作的重要性[J];醫(yī)藥工程設(shè)計(jì);2000年01期
5 叢培經(jīng);第4講 項(xiàng)目經(jīng)理部[J];施工技術(shù);2002年07期
6 張永高;煤炭企業(yè)非煤項(xiàng)目管理之淺見[J];安徽科技;2002年12期
7 周海婷;推行項(xiàng)目法管理應(yīng)注意的問題[J];城鄉(xiāng)建設(shè);2002年11期
8 郭斌;項(xiàng)目中的協(xié)調(diào)該怎么做?[J];中國計(jì)算機(jī)用戶;2002年32期
9 駱虹;;如何不讓項(xiàng)目賠錢[J];科技智囊;2002年07期
10 余長(zhǎng)國;軟件項(xiàng)目為什么容易失敗——談項(xiàng)目的界定管理(一)[J];經(jīng)濟(jì)師;2002年03期
相關(guān)會(huì)議論文 前10條
1 ;征集項(xiàng)目一覽表[A];2010’第五屆綠色財(cái)富(中國)論壇會(huì)刊[C];2010年
2 趙彬;焦書長(zhǎng);;“三次會(huì)議”制度推進(jìn)項(xiàng)目穩(wěn)步持續(xù)發(fā)展[A];河南省建筑業(yè)行業(yè)優(yōu)秀論文集(2010)[C];2010年
3 劉中平;周甄;李亞玲;馬韜;;項(xiàng)目團(tuán)隊(duì)組織、分工與工作模式[A];2013年中國航空學(xué)會(huì)管理科學(xué)分會(huì)學(xué)術(shù)會(huì)議論文集[C];2013年
4 陳登慧;郭紅梅;;水土保持執(zhí)法項(xiàng)目目標(biāo)競(jìng)爭(zhēng)崗位責(zé)任制的形成與效益分析[A];水土保持監(jiān)督管理論文選編[C];2003年
5 馮亮;;用項(xiàng)目管理模式開展ICT外包服務(wù)項(xiàng)目[A];海南省通信學(xué)會(huì)學(xué)術(shù)年會(huì)論文集(2006)[C];2006年
6 張寶琴;安培芬;;風(fēng)險(xiǎn)管理在手術(shù)室護(hù)理中的應(yīng)用[A];全國第十屆手術(shù)室護(hù)理學(xué)術(shù)交流暨專題講座會(huì)議論文匯編(上)[C];2006年
7 張敏;;風(fēng)險(xiǎn)管理在臨床的應(yīng)用[A];全國第十屆手術(shù)室護(hù)理學(xué)術(shù)交流暨專題講座會(huì)議論文匯編(上)[C];2006年
8 杜柯凝;;風(fēng)險(xiǎn)管理在臨床中應(yīng)用[A];吉林省護(hù)理學(xué)會(huì)2008學(xué)術(shù)年會(huì)暨護(hù)理技能培訓(xùn)班論文匯編[C];2008年
9 趙儉;劉敏;曹志芳;任麗勤;劉珂;;質(zhì)量風(fēng)險(xiǎn)管理應(yīng)用探討[A];2008年中國藥學(xué)會(huì)學(xué)術(shù)年會(huì)暨第八屆中國藥師周論文集[C];2008年
10 盛漢濱;樊軍;王紀(jì)泉;;杭甬高速公路項(xiàng)目目標(biāo)可持續(xù)發(fā)展評(píng)價(jià)[A];第一屆全國公路科技創(chuàng)新高層論壇論文集環(huán)保與可持續(xù)發(fā)展卷[C];2002年
相關(guān)重要報(bào)紙文章 前10條
1 崔晶煒;如何確定項(xiàng)目目標(biāo)?[N];中國計(jì)算機(jī)報(bào);2004年
2 記者 莊啟e,
本文編號(hào):2392756
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2392756.html