印度Uttam135m~2燒結(jié)工程項(xiàng)目設(shè)計(jì)進(jìn)度控制研究
[Abstract]:With the rapid development of iron and steel metallurgical industry, many design units began to transform to undertake the general contracting mode of engineering design projects, which put forward higher requirements for engineering design project management. Among them, design schedule management is a very important aspect. Schedule management is one of the three goals of project management and plays a decisive role in project success. How to improve the level of engineering design schedule management is a problem that needs to be solved continuously. In this paper, the design schedule management of Uttam 135m~2 sintering project in China Metallurgical Company is studied. On the basis of introducing the general situation of the project and analyzing the factors affecting the progress, the work of the project is decomposed and coded by WBS work structure decomposition, and the key path method is used. 03:00 estimation method, network planning technology to estimate and optimize the duration of the project, to formulate the final schedule. In the process of implementation and control of schedule plan, effective scientific management means and measures such as horizontal path diagram method, earned value method, three-level schedule plan and PDCA cycle are used to ensure the smooth implementation of the schedule plan so as to achieve the expected results. In the research process of project design schedule management, the key points of schedule management can be found: first, there should be a clear and simplified work breakdown structure; secondly, a variety of methods should be used to estimate the construction period scientifically and reasonably. Again, the progress plan should decompose layer by layer, implement to the person, execute strictly. Based on the research on the design schedule management of Uttam 135m~2 sintering project in China Metallurgical Corporation, this paper draws experience from it, which is helpful to improve the design schedule management level of sintering project and to solve the common problems in shortening the construction period of sintering project. It also plays an active role in carrying out the management of the same type of engineering design project in the future.
【學(xué)位授予單位】:西安建筑科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TF046.4
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張欣萌;李陽(yáng);;項(xiàng)目管理中的進(jìn)度、質(zhì)量和成本管理[J];科技視界;2014年04期
2 陳曉惠;;論大型項(xiàng)目的進(jìn)度控制[J];化學(xué)工程與裝備;2014年01期
3 劉挺;;EPC項(xiàng)目分專業(yè)聯(lián)動(dòng)進(jìn)度管理模型研究[J];項(xiàng)目管理技術(shù);2013年10期
4 張士超;;淺析施工進(jìn)度下的設(shè)計(jì)進(jìn)度控制[J];河南科技;2013年17期
5 曹偉;戴維;;工程項(xiàng)目管理集成化模式及發(fā)展趨勢(shì)[J];交通標(biāo)準(zhǔn)化;2012年18期
6 張子平;;工程項(xiàng)目設(shè)計(jì)階段進(jìn)度控制分析[J];現(xiàn)代冶金;2012年01期
7 李麗;;我國(guó)工程項(xiàng)目進(jìn)度管理研究綜述[J];科學(xué)之友;2011年02期
8 楊紅霞;;項(xiàng)目進(jìn)度管理方法研究[J];山西建筑;2010年29期
9 薛曉煜;;項(xiàng)目管理進(jìn)度控制分析及對(duì)策[J];商業(yè)文化(學(xué)術(shù)版);2009年07期
10 羅述康;;淺析國(guó)外鋼鐵EP項(xiàng)目管理的難點(diǎn)及對(duì)策[J];鋼鐵技術(shù);2009年03期
相關(guān)碩士學(xué)位論文 前1條
1 許金建;汽車零部件項(xiàng)目開發(fā)進(jìn)度管理研究[D];蘇州大學(xué);2013年
,本文編號(hào):2368738
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2368738.html