青藏交直流聯(lián)網(wǎng)工程項目全過程管理體系研究
[Abstract]:The Qinghai-Tibet AC / DC network project is a key project in the "12th Five-Year Plan" of the country. It is the highest elevation in the world so far, the largest construction scale in alpine areas, the longest crossing of permafrost and the most difficult power transmission and transformation projects. Known as the Qinghai-Tibet Plateau on the "power sky road." In order to build the Qinghai-Tibet AC / DC network project and improve the management level of the power grid project, this paper makes a study. Taking the Qinghai-Tibet AC / DC network project as the research carrier and how to use the project management means in the construction and development of power grid engineering as the core content, this paper studies the project management situation at home and abroad, and analyzes the theory of project management and the whole process management of the project. The concept and scientific methods of modern project management are brought into practice, the requirements of the project are fully identified, the project objectives are clearly defined, and the whole project life cycle is divided into start-up stage, planning stage, implementation stage and closing stage. The whole process management system of the Qinghai-Tibet AC / DC interconnection project is established. In the whole process of project management, according to the principles of adaptability, feasibility, science and innovation, define the scope of the project, comprehensively coordinate the project progress, quality, investment, environmental protection and other objectives, quality management model guide, continuous improvement, Schedule management grasps the key path, develops the construction battle, strictly controls the design change, strictly controls the project scope, ensures the largest degree to meet the investor's demand, finally realizes the engineering project the whole process science, the standard management. The results of this paper have important theoretical and practical significance for improving the management level of transmission and transformation projects.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:TM73
【相似文獻】
相關(guān)期刊論文 前10條
1 ;青藏750千伏交直流聯(lián)網(wǎng)工程將創(chuàng)多項世界之最[J];青海電力;2010年03期
2 祁正吉;黨亞利;馮義華;;“電力天路”——青!鞑750千伏/±400千伏交直流聯(lián)網(wǎng)工程[J];農(nóng)電管理;2011年02期
3 ;青藏交直流聯(lián)網(wǎng)工程建設(shè)取得重要階段性勝利[J];東北電力技術(shù);2011年01期
4 魯先龍;童瑞銘;;青藏交直流聯(lián)網(wǎng)工程裝配式基礎(chǔ)抗壓性能試驗[J];電力建設(shè);2011年05期
5 索朗多吉;;愛心送給西藏公司駐村工作點小學(xué)生[J];農(nóng)村電工;2012年08期
6 宋濤;李斌;樊紀(jì)超;余世峰;;青藏交直流聯(lián)網(wǎng)工程項目管理案例[J];項目管理技術(shù);2012年05期
7 許鵬;張滿定;;致敬! 向青藏高原上的英雄[J];國家電網(wǎng);2011年02期
8 ;國家電網(wǎng)公司大力推進青藏交直流聯(lián)網(wǎng)工程建設(shè)[J];陜西電力;2011年02期
9 ;青藏交直流聯(lián)網(wǎng)工程西藏段首基鐵塔組立[J];陜西電力;2011年03期
10 ;簡訊[J];中國電力企業(yè)管理;2011年23期
相關(guān)重要報紙文章 前10條
1 馬旭升;青藏交直流聯(lián)網(wǎng)工程第一個基礎(chǔ)澆筑工程完工[N];青海日報;2010年
2 記者 李莎莎;青海-西藏750千伏/±400千伏交直流聯(lián)網(wǎng)工程開工[N];格爾木日報;2010年
3 記者 田麗;三級醫(yī)療保障確保青藏交直流聯(lián)網(wǎng)建設(shè)大軍戰(zhàn)斗力[N];西藏日報;2010年
4 記者 星子;青藏交直流聯(lián)網(wǎng)工程積極穩(wěn)步推進[N];青海日報;2010年
5 記者 田麗;專家組檢查青藏交直流聯(lián)網(wǎng)工程西藏段環(huán)保情況[N];西藏日報;2010年
6 記者 王建芳 通訊員 張滿定;青藏交直流聯(lián)網(wǎng)工程打響世界凍土樁基攻堅戰(zhàn)[N];格爾木日報;2010年
7 記者 星子;青藏交直流聯(lián)網(wǎng)工程直流線路(青海段)基礎(chǔ)施工暨熱棒安裝全面完工[N];青海日報;2010年
8 記者 陸暢 李海成;確保青藏交直流聯(lián)網(wǎng)工程年內(nèi)投運[N];國家電網(wǎng)報;2011年
9 記者 賈明;青藏交直流聯(lián)網(wǎng)工程進行建設(shè)總動員[N];青海日報;2011年
10 記者 毛翠香;青藏交直流聯(lián)網(wǎng)工程順利轉(zhuǎn)入架線階段[N];青海日報;2011年
相關(guān)碩士學(xué)位論文 前1條
1 李斌;青藏交直流聯(lián)網(wǎng)工程項目全過程管理體系研究[D];華北電力大學(xué);2015年
,本文編號:2255675