山東半島藍色經(jīng)濟工程研究院建設(shè)項目風(fēng)險管理研究
[Abstract]:Construction projects have the characteristics of long period, large investment, complex construction technology, more participants, more environmental interference, and so on. The engineering projects inevitably face many uncertain risks, such as not to prevent them. It is very likely to affect the smooth construction and operation of the project, and even cause incalculable losses. Identify the existing risks in advance, through careful analysis, seek a scientific management method, pay the minimum to reduce the project risk to the lowest limit, through the project risk management research, the project risk loss can be effectively avoided and reduced. It is of great significance to ensure the smooth completion of the project plan to achieve the expected economic, social and environmental benefits of the project. Risk management, as a systematic management process and management activity, is an essential and important link in engineering project management. The significance of strengthening risk management lies in making clear to the maximum extent the risk and the degree of risk existing in the project through risk identification, risk analysis, risk evaluation, and the potential uncertainty risk in the construction and operation of the project. The aim is to minimize risk by seeking effective control measures. This study takes the construction project of the Blue Economic Engineering Research Institute of Shandong Peninsula as the research object, and applies the theory and method of risk management to identify, analyze and evaluate the risks existing in the project. The countermeasures to avoid and control the risk are worked out so that the potential risk of the project can be effectively circumvented and the risk loss will be reduced to the minimum. Firstly, the theory and method of risk management in the field of engineering project are systematically expounded on the basis of reading relevant documents. Combined with the actual situation of the construction project of Blue Economic Engineering Research Institute of Shandong Peninsula, according to the research goal of risk management of the entity engineering project, the research framework is drawn up, and the possible risks in the preparation and construction of the project are identified and analyzed. And using the comprehensive evaluation index system, using analytic hierarchy process, flow chart, decomposition analysis, verification table method, accident tree analysis and other research methods, The paper evaluates the investment decision stage, the early stage of the project, the project construction stage and the project management stage of the Blue Economic Engineering Research Institute of Shandong Peninsula, with emphasis on the financing risk. The single risk evaluation and overall risk evaluation of engineering project are carried out in three aspects of management risk and quality risk. The related data of the construction project risk of Blue Economic Engineering Research Institute of Shandong Peninsula were investigated in advance, and then the risk of the project was evaluated quantitatively to determine the risk level of the project and lay the foundation for the risk control of the project. The results show that the risk values of the project in financing, management, quality and the whole project are 51.3 / 52.9 / 42.9 and 48.7, respectively. It is concluded that the construction project of the Blue Economic Engineering Research Institute of Shandong Peninsula has moderate risk and is within the scope of avoidance and control. In view of different stages, we should strengthen the analysis of relevant policies, adopt a variety of ways to combine to resolve the risk of land demolition and relocation, develop multiple financing, resolve financing risks, strengthen project management, control cost risks, strengthen project supervision and control quality risks. Through a series of measures, the risks in all aspects of the project should be reduced to a lower and lower degree, and special attention should be paid to project management and financing risks in order to prevent their impact on the whole project construction.
【學(xué)位授予單位】:中國海洋大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:TU71
【參考文獻】
相關(guān)期刊論文 前10條
1 冀巨海;梁微;;基于ISM模型的煤矸石電廠項目風(fēng)險因素分析[J];科技和產(chǎn)業(yè);2011年12期
2 郝風(fēng)田;趙平;;基于可靠度理論的地鐵施工項目風(fēng)險控制研究[J];地下空間與工程學(xué)報;2011年02期
3 文海鷗;;淺析國際工程項目風(fēng)險管理[J];中小企業(yè)管理與科技(下旬刊);2011年03期
4 金鑫;郭建男;王慧斌;李振宇;;工程監(jiān)理項目中的風(fēng)險管理[J];中國高新技術(shù)企業(yè);2010年16期
5 王蔚初;;現(xiàn)代工程項目風(fēng)險分析和管理[J];江西建材;2010年01期
6 文向陽;劉懿帆;;工程項目風(fēng)險的管理過程及防范措施[J];現(xiàn)代經(jīng)濟信息;2009年23期
7 王煜洲;;基于物元分析的公路客運站建設(shè)風(fēng)險評估[J];鐵道運輸與經(jīng)濟;2009年08期
8 彭偉功;周繼軍;向曉東;李春光;;可靠性理論在公共安全領(lǐng)域的應(yīng)用研究[J];中國安全科學(xué)學(xué)報;2009年04期
9 劉振奎;;工程建設(shè)項目業(yè)主風(fēng)險評估[J];價值工程;2008年02期
10 劉明菲;羅顯敏;;物流園區(qū)市場運營風(fēng)險管理[J];武漢理工大學(xué)學(xué)報(社會科學(xué)版);2006年03期
相關(guān)碩士學(xué)位論文 前8條
1 胡雄;武漢CBD綜合管溝項目風(fēng)險管理研究[D];華中科技大學(xué);2007年
2 吳俊;建設(shè)項目前期管理中的風(fēng)險管理研究[D];重慶大學(xué);2007年
3 何九會;建設(shè)工程項目風(fēng)險管理的研究[D];西安建筑科技大學(xué);2007年
4 沈姍姍;物流園區(qū)的選址風(fēng)險分析[D];武漢理工大學(xué);2006年
5 洪柱;項目融資風(fēng)險問題分析[D];武漢科技大學(xué);2006年
6 楊亞岐;BOT項目融資的風(fēng)險管理研究[D];燕山大學(xué);2006年
7 冉啟英;房地產(chǎn)投資風(fēng)險管理研究[D];新疆農(nóng)業(yè)大學(xué);2004年
8 張墨林;房地產(chǎn)項目前期風(fēng)險管理[D];西安建筑科技大學(xué);2004年
,本文編號:2237667
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2237667.html