搖窗電機(jī)異地協(xié)同開發(fā)項(xiàng)目風(fēng)險(xiǎn)管理研究
[Abstract]:With the continuous development of the global economic integration and the increasingly fierce market competition, the automobile window motor manufacturing industry has entered the era of micro profit, facing the severe cost and the challenge of the development cycle of the new platform. Many enterprises have chosen to control and continue to cooperate with the world to reduce the cost of development and shorten the development week. In order to improve the competitiveness of its own products, however, in the actual implementation process, because of regional cultural differences, the differences of experience accumulation and comparative advantage differences, there are many control risks to the cooperative development of the windowsmotor in different places. Therefore, a reasonable risk assessment and coping mode for the cooperative development of windowwinder is constructed. It is of great significance for transnational enterprises. The risk management of the cooperative development project of motor vehicle rolling window motor is very important in the management of automobile parts and components development project. He has many links to consider, including cost, quality, development cycle and so on, and on the important content of risk management, he also includes risk planning, risk identification, risk. Evaluation, risk response, risk monitoring and other steps, and is a closed loop system. On the basis of understanding the international same types of companies, and combining the characteristics of their cooperative development in different places, based on the situation of their own company, the general flow of risk management of automobile rolling window motor is specially formulated. After developing the risk characteristics of the project, the window motor is based on the characteristics of the Delphi method. This paper uses it to identify the risk of the project. In the BW12 project, which is developed by our company, because it is a customer background based on different regions, the quality requirements of different customers are required, and the same platform must be shared in the world. It can avoid many risks. Based on the experience and knowledge of many experts, we use the Delphi method to form the risk questionnaire of this kind of project, and then use the analytic hierarchy process (AHP) and fuzzy comprehensive analysis to evaluate the project so as to determine the risk level so as to follow up the corresponding countermeasures and evade methods. According to the requirements of the time and cost, the quality requirements, the ranking of the risk list and the grade of the risk assessment, the risk response measures and the evasion methods are discussed, and the relevant research results are evaluated and the validity of the research is determined in combination with the development of the company BW12 project.
【學(xué)位授予單位】:上海交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:F407.471;U468.4
【共引文獻(xiàn)】
相關(guān)博士學(xué)位論文 前10條
1 李芬花;水利水電工程系統(tǒng)的風(fēng)險(xiǎn)評(píng)估方法研究[D];華北電力大學(xué)(北京);2011年
2 占濟(jì)舟;失信因子對(duì)軟件可信性的影響及其控制[D];南京大學(xué);2011年
3 周賓;水資源系統(tǒng)“易”理論構(gòu)建與SD仿真實(shí)證研究[D];蘭州大學(xué);2011年
4 戴時(shí)清;高速公路項(xiàng)目投融資研究[D];中南大學(xué);2011年
5 趙峰;公路隧道運(yùn)營(yíng)風(fēng)險(xiǎn)評(píng)估及火災(zāi)逃生研究[D];長(zhǎng)安大學(xué);2010年
6 劉堂卿;空中交通管制安全風(fēng)險(xiǎn)耦合機(jī)理研究[D];武漢理工大學(xué);2011年
7 樓海軍;國(guó)際EPC水泥工程風(fēng)險(xiǎn)管理研究[D];武漢理工大學(xué);2011年
8 姜寧;基于風(fēng)險(xiǎn)耦合的交通安全應(yīng)急管理系統(tǒng)研究[D];武漢理工大學(xué);2011年
9 王悅現(xiàn);中國(guó)城市軌道交通投資管理研究[D];武漢理工大學(xué);2011年
10 王之君;企業(yè)集團(tuán)產(chǎn)融結(jié)合及風(fēng)險(xiǎn)防范研究[D];天津大學(xué);2010年
,本文編號(hào):2170453
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2170453.html