裝配型制造業(yè)企業(yè)新產(chǎn)品引進(jìn)項(xiàng)目中的進(jìn)度研究和應(yīng)用
[Abstract]:With the rapid development of economic globalization, the manufacturing industry is moving on a large scale in the world, and assembly manufacturing enterprises appear in a large number, which is different from the general manufacturing production mode. The traditional management mode of functional organizational structure can not meet the needs of development. It needs to adopt the organizational structure and management mode of project management in order to better adapt to its development and promote its development. However, because of the short application time of project management in assembly manufacturing industry, there are many problems in practical management, such as the adaptability of new products to local products. The unreasonable schedule leads to the introduction of new products often exceeds the expected schedule, which affects the delivery schedule of the products, misses the best time to enter the market, and causes losses to the assembly manufacturing enterprises. In this paper, the author studies the schedule management of A-type new product introduction project in an assembly manufacturing enterprise. In this paper, the author first analyzes the problems existing in the project management of a company based on the introduction project of SW new products, and then applies the project schedule management to the A type new product introduction schedule plan. In the process of project application research, the author adopts some tools and methods of project management, including milestone plan WBS work breakdown structure, plan review technology, single code name network diagram, critical path and so on. Through these tools and methods, the author analyzes the work breakdown and schedule parameters of the A type new product import project, and then analyzes, identifies and controls the key chain of the project. Finally, the A-type new product introduced the project to meet the requirements of the expected duration. On the basis of the research on the effect of schedule management and control in the introduction of A new products, the author puts forward some suggestions for improvement from the aspects of enterprise organization structure, human resource utilization, communication and coordination in project execution, so as to establish a stable and reliable system for a certain company. Scientific project management mechanism and process, and improve the efficiency of project management to provide a reference basis.
【學(xué)位授予單位】:上海交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:F273.2;F416.4
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 鄭家裕;;引進(jìn)項(xiàng)目百余個(gè) 安置移民三千人 秭歸從沿海取來(lái)“真經(jīng)”[J];中國(guó)經(jīng)濟(jì)快訊;2000年26期
2 李忠誠(chéng);;更快更好地發(fā)揮引進(jìn)項(xiàng)目的效益——湖北省二輕局抓好十項(xiàng)配套工作的體會(huì)[J];經(jīng)濟(jì)工作通訊;1986年10期
3 肖良茂;引進(jìn)項(xiàng)目存在的問(wèn)題及對(duì)策[J];中國(guó)城市金融;1987年07期
4 田文;天津市圍繞重點(diǎn)引進(jìn)項(xiàng)目[J];國(guó)際人才交流;2005年05期
5 朱世雄;從引進(jìn)項(xiàng)目看國(guó)內(nèi)可行性研究的必要性與內(nèi)容[J];江西冶金;1981年04期
6 王惠政;試論“引進(jìn)項(xiàng)目”可行性研究的現(xiàn)狀和改進(jìn)[J];上海會(huì)計(jì);1984年12期
7 童新耕;引進(jìn)項(xiàng)目談判前的準(zhǔn)備工作和談判中需要注意的若干問(wèn)題[J];外國(guó)經(jīng)濟(jì)與管理;1984年Z1期
8 陳慧波;談?wù)勔M(jìn)項(xiàng)目確定前后的幾個(gè)問(wèn)題[J];郵電企業(yè)管理;1984年03期
9 張鎮(zhèn)芝;;技術(shù)引進(jìn)項(xiàng)目可行性研究[J];外貿(mào)教學(xué)與研究.上海對(duì)外貿(mào)易學(xué)院學(xué)報(bào);1985年06期
10 鄭偉;引進(jìn)項(xiàng)目投產(chǎn)效益應(yīng)如何統(tǒng)計(jì)[J];統(tǒng)計(jì);1986年05期
相關(guān)會(huì)議論文 前2條
1 周正言;;一種簡(jiǎn)單的項(xiàng)目評(píng)估模式[A];江蘇省系統(tǒng)工程學(xué)會(huì)第十一屆學(xué)術(shù)年會(huì)論文集[C];2009年
2 ;灑一腔熱血 育桃李芬芳——杜元釗事跡介紹[A];中國(guó)禽業(yè)發(fā)展大會(huì)暨中國(guó)畜牧業(yè)協(xié)會(huì)禽業(yè)分會(huì)第二屆會(huì)員代表大會(huì)論文集[C];2007年
相關(guān)重要報(bào)紙文章 前10條
1 侯偉峰;開(kāi)發(fā)區(qū):引進(jìn)項(xiàng)目15個(gè)引進(jìn)資金近8億元[N];駐馬店日?qǐng)?bào);2007年
2 招商宣;引進(jìn)項(xiàng)目進(jìn)展加快[N];柳州日?qǐng)?bào);2010年
3 記者 楊朝東;我市去年引進(jìn)項(xiàng)目259個(gè)引資額上升24%[N];通遼日?qǐng)?bào);2010年
4 記者 黃尉宏 特約通訊員 胡世文;前8月新引進(jìn)項(xiàng)目55宗[N];惠州日?qǐng)?bào);2011年
5 本報(bào)記者 賀敏;今年前11月我市引進(jìn)項(xiàng)目1099個(gè)[N];貴陽(yáng)日?qǐng)?bào);2012年
6 羅云霄;南明區(qū)前11月引進(jìn)項(xiàng)目223個(gè)[N];貴州日?qǐng)?bào);2012年
7 記者 來(lái)蒞;引進(jìn)項(xiàng)目六個(gè) 總投資三百億[N];北海日?qǐng)?bào);2013年
8 記者 羅玉清;我市工商系統(tǒng)上半年引進(jìn)項(xiàng)目48個(gè) 資金84億元[N];白銀日?qǐng)?bào);2013年
9 記者 韓樂(lè);持之以恒策劃引進(jìn)項(xiàng)目 大力培育富民強(qiáng)縣產(chǎn)業(yè)[N];渭南日?qǐng)?bào);2013年
10 記者 王賀;全市半年引進(jìn)項(xiàng)目311個(gè)[N];德州日?qǐng)?bào);2013年
相關(guān)博士學(xué)位論文 前1條
1 李妍;對(duì)外開(kāi)放的醞釀和起步[D];中共中央黨校;2003年
相關(guān)碩士學(xué)位論文 前4條
1 楊小忠;裝配型制造業(yè)企業(yè)新產(chǎn)品引進(jìn)項(xiàng)目中的進(jìn)度研究和應(yīng)用[D];上海交通大學(xué);2015年
2 曲艷偉;技術(shù)引進(jìn)項(xiàng)目綜合評(píng)價(jià)研究[D];遼寧工程技術(shù)大學(xué);2006年
3 楊珍增;可持續(xù)發(fā)展目標(biāo)下的技術(shù)引進(jìn)項(xiàng)目評(píng)估研究[D];天津財(cái)經(jīng)學(xué)院;2005年
4 孫時(shí)曉;技術(shù)引進(jìn)項(xiàng)目風(fēng)險(xiǎn)管理的研究[D];北京交通大學(xué);2006年
,本文編號(hào):2158470
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2158470.html