軍用XX基礎(chǔ)研發(fā)條件建設(shè)項(xiàng)目進(jìn)度管理研究
[Abstract]:The fixed assets investment projects of national defense science, technology and industry have the characteristics of large scale of project investment, long construction period, complicated construction contents and great investment significance. It is objectively required that the project construction should proceed from the goal of construction. In order to ensure the progress and quality of the project, we should plan the project construction plan scientifically and reasonably, strengthen the implementation management of the construction safety project in the process of construction, manage the equipment purchase, strictly manage the project schedule, and ensure the progress and quality of the project construction. The military XX basic R & D condition construction project is the national defense science and technology industry fixed assets investment project, in the project implementation process, the progress management system is not perfect, the schedule management importance understanding is insufficient, the schedule management scientific nature needs to be improved, Lack of full-time progress control personnel, the project implementation schedule delay, the project on time to complete a greater impact, therefore, it is necessary to XX project progress management research, and has very important significance. Based on the research on the theory of project management and project schedule management, this paper has carried on the WBS decomposition to XX project and carried on the thorough research to the activity logic relation, has used the network plan technology, the key path method and so on method. The project schedule is compiled and optimized. Secondly, how to monitor the project schedule dynamically and how to adjust the project schedule during the implementation of the project schedule are analyzed in detail. This paper puts forward the measures to control the project schedule, and also puts forward the relevant safeguard measures to ensure the implementation of the project schedule plan. Through the research of this paper, combining the theory and method of project management with the actual situation of military XX basic R & D condition construction project schedule management, it has important theoretical and practical significance for the formulation and control of XX project schedule. Through this research, we can also provide reference and reference for the schedule management of other fixed assets projects of defense science, technology and industry.
【學(xué)位授予單位】:南京理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:E25;F426.48
【相似文獻(xiàn)】
相關(guān)期刊論文 前1條
1 沈金;IT項(xiàng)目進(jìn)度管理[J];臺聲.新視角;2005年05期
相關(guān)會議論文 前3條
1 楊正茂;;維生素C質(zhì)量升級項(xiàng)目進(jìn)度管理研究[A];第十屆沈陽科學(xué)學(xué)術(shù)年會論文集(農(nóng)業(yè)科學(xué)與醫(yī)藥科學(xué)分冊)[C];2013年
2 高華北;張花玲;周湘暉;黃曦;丁霞;王麗;鄢旭輝;嚴(yán)國興;;甘特圖在職業(yè)病危害評價(jià)項(xiàng)目進(jìn)度管理中的應(yīng)用[A];湖南省預(yù)防醫(yī)學(xué)會勞動衛(wèi)生專業(yè)委員會2008年學(xué)術(shù)交流會議論文集[C];2008年
3 孫慧;王麗華;;多層次模糊控制在工程項(xiàng)目進(jìn)度管理中的應(yīng)用[A];2005年中國機(jī)械工程學(xué)會年會論文集[C];2005年
相關(guān)重要報(bào)紙文章 前7條
1 彭潔;昆明辦審計(jì)項(xiàng)目進(jìn)度管理實(shí)現(xiàn)規(guī)范化[N];中國審計(jì)報(bào);2013年
2 ;遼寧審計(jì)廳出臺審計(jì)項(xiàng)目進(jìn)度管理辦法[N];財(cái)會信報(bào);2010年
3 曹忻;云南省審計(jì)廳實(shí)行項(xiàng)目進(jìn)度管理[N];中國審計(jì)報(bào);2010年
4 項(xiàng)榮;深圳辦加強(qiáng)審計(jì)項(xiàng)目進(jìn)度管理[N];中國審計(jì)報(bào);2012年
5 小城;遼寧出臺審計(jì)項(xiàng)目進(jìn)度管理辦法[N];中國稅務(wù)報(bào);2010年
6 記者 李穎;增強(qiáng)藏區(qū)自我造血能力 助推藏區(qū)跨越發(fā)展[N];成都日報(bào);2014年
7 通訊員 劉永良;雙永高速永定段完成投資15億元[N];閩西日報(bào);2010年
相關(guān)博士學(xué)位論文 前3條
1 薛維銳;面向協(xié)同施工的工程項(xiàng)目進(jìn)度管理研究[D];哈爾濱工業(yè)大學(xué);2015年
2 魏從剛;網(wǎng)絡(luò)化協(xié)同制造項(xiàng)目進(jìn)度管理技術(shù)研究[D];西北工業(yè)大學(xué);2006年
3 張敏;項(xiàng)目進(jìn)度管理的行為不確定性及其控制策略研究[D];華中科技大學(xué);2011年
相關(guān)碩士學(xué)位論文 前10條
1 秦國祥;HP公司軟件項(xiàng)目進(jìn)度管理研究[D];華東理工大學(xué);2015年
2 廖奇;嘎納時(shí)代廣場工程項(xiàng)目進(jìn)度管理研究[D];電子科技大學(xué);2015年
3 公為偉;煙臺豐源礦產(chǎn)公司礦粉生產(chǎn)廠區(qū)建設(shè)項(xiàng)目進(jìn)度管理研究[D];中國海洋大學(xué);2015年
4 包楊川;關(guān)鍵鏈管理在W工程項(xiàng)目進(jìn)度管理中的運(yùn)用研究[D];電子科技大學(xué);2015年
5 趙清華;濰坊市高新花園住宅小區(qū)建設(shè)項(xiàng)目進(jìn)度管理研究[D];中國海洋大學(xué);2014年
6 王續(xù)鵬;QDPJ集團(tuán)視頻信息交互系統(tǒng)項(xiàng)目進(jìn)度管理研究[D];中國海洋大學(xué);2014年
7 黃忠祥;MS移動4G深度覆蓋工程項(xiàng)目進(jìn)度管理研究[D];電子科技大學(xué);2015年
8 李謐;A企業(yè)數(shù)字電氣平臺項(xiàng)目進(jìn)度管理研究[D];電子科技大學(xué);2015年
9 楊雯婷;集成開發(fā)管理中項(xiàng)目進(jìn)度管理的模型研究[D];大連海事大學(xué);2015年
10 高冉;A公司新產(chǎn)品開發(fā)多項(xiàng)目進(jìn)度管理優(yōu)化研究[D];浙江工業(yè)大學(xué);2015年
,本文編號:2157169
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2157169.html