G112TJ高速公路工程項(xiàng)目進(jìn)度管理研究
[Abstract]:With the continuous development of our economy and the rapid improvement of transportation capacity, expressway becomes an important foundation and link of economic development, so the requirement of expressway construction is becoming more and more strict. As the main content of expressway project management, project schedule control management has practical application significance for expressway project management. By exploring and analyzing the whole flow of schedule control in G112TJ expressway project, this paper analyzes some defects in the detailed contents of construction management, improves the related deficiencies, and sums up the experience further. For the project management in the future application, lay a good foundation. First of all, this paper analyzes the background and significance of expressway project schedule and control, summarizes the current research situation at home and abroad, and determines the technical route and research methods. Combing the highway project schedule control related concepts, compare the relevant methods, for follow-up research services. Secondly, by describing the general situation of the G112TJ highway section project, analyzing the basic resources of the project, making use of the critical path method and the network planning method to draw up the project schedule plan, on the basis of this, the reasonable establishment of the project organization structure, The implementation dynamic monitoring is carried out in the stage of project implementation, including: project progress control report, deviation analysis of project schedule control and adoption of appropriate corrective measures. Finally, the evaluation model of schedule planning and control is established by AHP- fuzzy comprehensive evaluation method, and the indexes of each layer are systematically analyzed. According to the three layer index system of project schedule control process management, the project schedule control process management model is constructed. The weight of each index is determined by AHP, and the project schedule control process management model is constructed by using fuzzy comprehensive evaluation method. The evaluation and analysis of each project level and index layer are carried out. Finally, the whole implementation process is scored, and some suggestions for improvement are put forward.
【學(xué)位授予單位】:燕山大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:U415.1
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 楊勁;對“關(guān)于《建設(shè)項(xiàng)目進(jìn)度控制》一書的修改意見”一文的反饋[J];建設(shè)監(jiān)理;1995年02期
2 李世蓉;對“關(guān)于《建設(shè)項(xiàng)目進(jìn)度控制》一書的修改意見”一文的幾點(diǎn)看法[J];建設(shè)監(jiān)理;1995年02期
3 趙曉明,夏景仁;利用軟件多層次實(shí)現(xiàn)項(xiàng)目進(jìn)度控制[J];施工技術(shù);2005年02期
4 傅鴻源;李軍;;從人出發(fā)分析工程項(xiàng)目進(jìn)度控制[J];山西建筑;2008年06期
5 金立紅;;住宅項(xiàng)目進(jìn)度控制理論的探討[J];今日科苑;2008年10期
6 庫爾曼巴依;;建設(shè)工程項(xiàng)目進(jìn)度控制[J];科技信息;2008年27期
7 劉昕冉;;工程類項(xiàng)目進(jìn)度控制探討[J];硅谷;2011年01期
8 楊雪飛;張春海;;淺談工程項(xiàng)目進(jìn)度控制[J];河南建材;2011年06期
9 任明;論項(xiàng)目進(jìn)度控制優(yōu)化[J];基建優(yōu)化;1992年04期
10 楊義兵,曹小琳;工程項(xiàng)目進(jìn)度控制目標(biāo)的經(jīng)濟(jì)性分析[J];重慶建筑大學(xué)學(xué)報(bào);2003年02期
相關(guān)會議論文 前4條
1 邵曉龍;李松濤;;工業(yè)建筑項(xiàng)目進(jìn)度控制措施[A];河南省土木建筑學(xué)會2010年學(xué)術(shù)大會論文集[C];2010年
2 李松濤;邵曉龍;;工業(yè)建筑項(xiàng)目進(jìn)度控制措施[A];土木建筑學(xué)術(shù)文庫(第13卷)[C];2010年
3 劉志輝;趙秋玲;;淺談房地產(chǎn)企業(yè)的項(xiàng)目進(jìn)度控制[A];土木建筑學(xué)術(shù)文庫(第15卷)[C];2011年
4 崔東紅;孟娜;;基于TOC的項(xiàng)目進(jìn)度控制[A];2006中國控制與決策學(xué)術(shù)年會論文集[C];2006年
相關(guān)重要報(bào)紙文章 前2條
1 王善龍;做好項(xiàng)目進(jìn)度控制這道題[N];中國建設(shè)報(bào);2014年
2 王志高;譚金生;陜西出臺審計(jì)項(xiàng)目進(jìn)度控制辦法[N];中國審計(jì)報(bào);2004年
相關(guān)碩士學(xué)位論文 前10條
1 董長華;ZP房地產(chǎn)項(xiàng)目進(jìn)度控制研究[D];西南交通大學(xué);2015年
2 王楠;J熱電公司供熱項(xiàng)目進(jìn)度控制研究[D];山東大學(xué);2015年
3 王冉;大興區(qū)舊忠路3#標(biāo)段項(xiàng)目進(jìn)度控制研究[D];北京化工大學(xué);2015年
4 李智勇;雅礱江流域開發(fā)卡楊公路項(xiàng)目進(jìn)度控制研究[D];電子科技大學(xué);2015年
5 張亮;基于網(wǎng)絡(luò)計(jì)劃技術(shù)的工程設(shè)計(jì)項(xiàng)目進(jìn)度控制研究[D];河北工業(yè)大學(xué);2015年
6 石方;CD移動TD-LTE項(xiàng)目實(shí)施中的進(jìn)度與質(zhì)量管理研究[D];電子科技大學(xué);2014年
7 王淡奎;基于關(guān)鍵鏈的海關(guān)XX艇維修工程項(xiàng)目進(jìn)度控制研究[D];華南理工大學(xué);2015年
8 康亞慶;南京機(jī)場線車輛項(xiàng)目進(jìn)度控制管理分析[D];南京財(cái)經(jīng)大學(xué);2014年
9 陳天龍;沈陽榮盛商業(yè)項(xiàng)目進(jìn)度控制研究[D];吉林大學(xué);2015年
10 王勇;TC公司總部異地搬遷項(xiàng)目進(jìn)度控制研究[D];山東大學(xué);2015年
,本文編號:2121176
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2121176.html