三峽庫區(qū)界樁測設(shè)特點
發(fā)布時間:2018-07-07 09:01
本文選題:界樁測量 + 界樁埋設(shè) ; 參考:《人民長江》2000年01期
【摘要】:三峽庫區(qū)庫岸界樁測量與埋設(shè),具有5大特點:①界樁測設(shè)涉及淹沒實物指標(biāo)補償?shù)拿舾袉栴},按《長江三峽工程初步設(shè)計水庫淹沒實物指標(biāo)調(diào)查大綱》的要求進(jìn)行界樁測設(shè),保持其一致性至關(guān)重要;②庫周兩岸長近6000km,涉及湖北省、重慶市的25個縣(市、區(qū)),干、支流線路長,界樁測設(shè)工作繁重,且承擔(dān)測量和埋設(shè)單位多,項目管理難度大,需要規(guī)范施工程序管理;③庫區(qū)干、支流交錯,合理布設(shè)界樁并保持其成果的統(tǒng)一,以達(dá)到既保證測設(shè)質(zhì)量,又使成本開支最小,既考慮各區(qū)域的特點,又保證全庫區(qū)的統(tǒng)一;④三峽庫區(qū)地形地貌復(fù)雜,交通運輸十分困難,施工環(huán)境差,界樁測量精度要求高,測量設(shè)備的先進(jìn)性和測設(shè)人員經(jīng)驗、素質(zhì)十分重要;⑤庫區(qū)埋設(shè)界樁4萬余座,且移民周期長,故界樁屬永久的基礎(chǔ)設(shè)施,界樁的管理任務(wù)艱巨
[Abstract]:The surveying and laying of boundary piles on the bank of the three Gorges Reservoir area has five major characteristics: 1. The boundary pile survey and installation involves the sensitive problem of compensation of the inundation material index. The boundary pile survey is carried out according to the requirements of the outline of the Survey of the inundation material Indexes of the preliminary Design Reservoir of the three Gorges Project of the Yangtze River. It is very important to maintain the consistency of the two reservoirs with a cross-bank length of nearly 6000km, involving 25 counties (cities, districts) in Hubei Province and Chongqing Municipality, long trunk and tributary lines, heavy surveying and setting up of boundary piles, and a large number of survey and laying units, which makes project management very difficult. It is necessary to standardize the construction procedure to manage the trunk and tributaries of the reservoir area, to arrange the boundary piles reasonably and to maintain the unity of the results, so as to ensure the quality of survey and installation and the minimum cost and expenditure, both to consider the characteristics of each region and to ensure the unity of the whole reservoir area. (4) the three Gorges Reservoir area is characterized by complex landform, difficult transportation, poor construction environment, high precision of boundary pile survey, advanced quality of surveying equipment and experience of surveyors, and the quality of which is very important to install more than 40,000 boundary piles in the reservoir area. And the migration period is long, so boundary piles are permanent infrastructure, the management task of boundary piles is arduous.
【作者單位】: 長江水利委員會工程管理局!湖北武漢430010 長江水利委員會工程管理局!湖北武漢430010 長江水利委員會工程管理局!湖北武漢430010
【分類號】:TV221
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 杜正喬;;金沙江溪洛渡水電站庫區(qū)水位淹沒線界樁埋設(shè)測量的監(jiān)理[J];科技致富向?qū)?2010年33期
2 長江;三峽工程庫區(qū)界樁移交工作全面展開[J];人民長江;2001年11期
3 王一寧;淺談尼爾基水庫淹沒界樁測量的特點[J];東北水利水電;2002年12期
4 朱化平;周園;;全站儀在水庫界樁測量中的應(yīng)用[J];農(nóng)業(yè)與技術(shù);2010年03期
5 姚楚光;三峽工程水庫標(biāo)界測量特點及主要技術(shù)指標(biāo)[J];人民長江;1997年03期
6 楊世林;長江三峽工程庫區(qū)移民標(biāo)界測量[J];重慶交通學(xué)院學(xué)報;1998年04期
7 ;[J];;年期
8 ;[J];;年期
9 ;[J];;年期
10 ;[J];;年期
,本文編號:2104463
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2104463.html
最近更新
教材專著