EPC模式下M鋼鐵公司煉鋼項(xiàng)目風(fēng)險(xiǎn)管理研究

發(fā)布時(shí)間:2018-06-22 06:03

  本文選題:EPC管理模式 + 冶金建設(shè)項(xiàng)目; 參考:《西安建筑科技大學(xué)》2017年碩士論文


【摘要】:冶金建設(shè)項(xiàng)目具有投資規(guī)模較大、建設(shè)周期偏長(zhǎng),設(shè)備供貨和施工材料總投資占比高,設(shè)計(jì)和設(shè)備供貨周期較長(zhǎng),施工周期、安裝調(diào)試周期較長(zhǎng)的顯著特點(diǎn),因此項(xiàng)目執(zhí)行過程中在質(zhì)量、安全、進(jìn)度、成本等方面存在不確定性管理風(fēng)險(xiǎn)。EPC項(xiàng)目管理模式所具有的優(yōu)勢(shì),使得EPC管理模式在冶金建設(shè)項(xiàng)目中得到普遍的應(yīng)用。但如何識(shí)別這些風(fēng)險(xiǎn)并根據(jù)風(fēng)險(xiǎn)的種類和發(fā)生的概率制定相應(yīng)的對(duì)策,成為冶金建設(shè)項(xiàng)目總承包項(xiàng)目管理中不容回避的一個(gè)重要問題。本文在冶金建設(shè)項(xiàng)目特點(diǎn)進(jìn)行研究的基礎(chǔ)上,結(jié)合EPC總承包項(xiàng)目的實(shí)施過程,提出了冶金建設(shè)總承包項(xiàng)目風(fēng)險(xiǎn)評(píng)價(jià)的方法,建立了風(fēng)險(xiǎn)評(píng)價(jià)指標(biāo)體系和評(píng)價(jià)模型。以M鋼鐵公司煉鋼總承包項(xiàng)目為例,建立了包含8個(gè)一級(jí)指標(biāo)23個(gè)二級(jí)指標(biāo)的風(fēng)險(xiǎn)評(píng)價(jià)指標(biāo)體系。通過專家調(diào)研的方法確定了M鋼鐵公司煉鋼總承包項(xiàng)目二級(jí)指標(biāo)的風(fēng)險(xiǎn)概率分布,采用CIM并聯(lián)響應(yīng)模型計(jì)算了一級(jí)指標(biāo)的風(fēng)險(xiǎn)概率分布。利用層次分析法(AHP)計(jì)算各指標(biāo)權(quán)重的基礎(chǔ)上,評(píng)價(jià)了該項(xiàng)目的風(fēng)險(xiǎn),明確了對(duì)項(xiàng)目具有重要影響的風(fēng)險(xiǎn)要素和風(fēng)險(xiǎn)概率較高的指標(biāo),提出了風(fēng)險(xiǎn)防范的措施。經(jīng)過分析計(jì)算,M鋼鐵公司煉鋼廠建設(shè)項(xiàng)目采用EPC總承包模式,能夠滿足項(xiàng)目建設(shè)的基本要求,但其風(fēng)險(xiǎn)分析的結(jié)果為“較高”,需要采取有效的風(fēng)險(xiǎn)控制措施加以防范。在各風(fēng)險(xiǎn)要素中,進(jìn)度風(fēng)險(xiǎn)、成本風(fēng)險(xiǎn)概率相對(duì)較高,是風(fēng)險(xiǎn)控制和防范的關(guān)鍵因素。
[Abstract]:Metallurgical construction projects are characterized by large scale of investment, long construction period, high proportion of total investment in equipment supply and construction materials, long cycle of design and equipment supply, long period of construction, and long period of installation and commissioning. Therefore, the quality, safety, schedule, cost and so on in the process of project implementation have the advantages of uncertainty management risk. EPC project management model has been widely used in metallurgical construction projects. However, how to identify these risks and make corresponding countermeasures according to the types of risks and the probability of occurrence has become an important problem in the general contracting project management of metallurgical construction projects. Based on the study of the characteristics of metallurgical construction project and the implementation process of EPC general contract project, this paper puts forward the risk evaluation method of metallurgical construction general contract project, and establishes the risk evaluation index system and evaluation model. Taking the general contracting project of steel making in M Iron and Steel Company as an example, a risk evaluation index system consisting of 8 first-grade indexes and 23 second-class indexes was established. The risk probability distribution of the secondary index of the total steelmaking project in M Iron and Steel Company is determined by the method of expert investigation, and the risk probability distribution of the first grade index is calculated by using the CIM parallel response model. Based on the analytic hierarchy process (AHP) to calculate the weight of each index, this paper evaluates the risk of the project, clarifies the risk factors which have important influence on the project and the index with high risk probability, and puts forward the measures of risk prevention. Through analysis and calculation, the EPC general contracting mode is adopted in the construction project of the steelmaking plant of Hom Iron and Steel Company, which can meet the basic requirements of the project construction, but the result of the risk analysis is "high", and effective risk control measures should be taken to prevent it. Among the risk factors, the probability of schedule risk and cost risk is relatively high, which is the key factor of risk control and prevention.
【學(xué)位授予單位】:西安建筑科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TF089

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 楊慧蘭;何峰;;RACI模型在冶煉總承包項(xiàng)目管理中的應(yīng)用[J];有色冶金設(shè)計(jì)與研究;2016年05期

2 曹偉;趙瑞海;劉成平;王志平;;邯鋼4高爐大修EPC總承包項(xiàng)目風(fēng)險(xiǎn)管理[J];鋼鐵技術(shù);2016年03期

3 閆文周;劉振超;;基于本體的EPC總承包項(xiàng)目風(fēng)險(xiǎn)控制研究[J];施工技術(shù);2016年06期

4 湯聶;;燒結(jié)余熱發(fā)電總承包項(xiàng)目的風(fēng)險(xiǎn)管理[J];工程建設(shè);2015年02期

5 張運(yùn)波;王飛;;轉(zhuǎn)底爐EPC總承包項(xiàng)目管理實(shí)踐[J];現(xiàn)代冶金;2014年06期

6 付濤;;冶金工程總承包項(xiàng)目設(shè)備管理[J];一重技術(shù);2014年05期

7 劉著;閻建武;;冶金工程EPC總承包項(xiàng)目管理的價(jià)值鏈分析[J];科技創(chuàng)新與應(yīng)用;2014年28期

8 賀立強(qiáng);何學(xué)仁;;論設(shè)計(jì)院轉(zhuǎn)型EPC總承包模式的項(xiàng)目管理[J];中國(guó)管理信息化;2014年18期

9 武永琦;;有色金屬冶煉EPC總承包項(xiàng)目的界面管理[J];金屬材料與冶金工程;2014年03期

10 夏國(guó)斌;;淺析我國(guó)鋼鐵冶金工業(yè)的發(fā)展[J];全國(guó)商情(理論研究);2014年01期

相關(guān)博士學(xué)位論文 前1條

1 劉金璐;項(xiàng)目融資風(fēng)險(xiǎn)分擔(dān)、控制模型及其實(shí)證分析[D];天津大學(xué);2007年

相關(guān)碩士學(xué)位論文 前1條

1 楊誠(chéng);建設(shè)—轉(zhuǎn)讓(BT)模式工程項(xiàng)目融資風(fēng)險(xiǎn)管理[D];天津大學(xué);2008年

,

本文編號(hào):2051877

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2051877.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶5bc9a***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com