天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

淺談三代核電建設(shè)中設(shè)備竣工文件的管理

發(fā)布時(shí)間:2018-06-16 18:02

  本文選題:淺談 + 三代。 參考:《蘭臺(tái)世界》2013年S2期


【摘要】:正三代核電站建造是有別于二代核站的,它的特點(diǎn)采用的模塊式的建造方式,AP1000核電機(jī)組共有119個(gè)結(jié)構(gòu)模塊和65個(gè)設(shè)備模塊。在現(xiàn)場(chǎng)建造前,可以同時(shí)制造多個(gè)模塊,模塊制造完成后,在現(xiàn)場(chǎng)就可以像設(shè)備一樣拼裝起來(lái),從而節(jié)約施工時(shí)間。在三代核電站建設(shè)中不僅有大量設(shè)備模塊,還要有很多A1類設(shè)備和非A1類設(shè)備,與之對(duì)應(yīng)的設(shè)備文件的量之大是可想而知,每天文檔中心將要接收大量設(shè)備文件,如何
[Abstract]:The construction of the third generation nuclear power station is different from that of the second generation nuclear power station. The modular construction mode used in the construction of the nuclear power plant AP1000 has 119 structural modules and 65 equipment modules. Several modules can be manufactured at the same time before the site is built. After the module is manufactured, the equipment can be assembled in the field, thus saving the construction time. In the construction of the third generation nuclear power plant, there are not only a large number of equipment modules, but also a lot of A1 and non-A1 equipment. It can be imagined that the amount of equipment files corresponding to them is large, and the document center will receive a large number of equipment files every day.
【作者單位】: 國(guó)核工程有限公司;
【分類號(hào)】:G275.3
,

本文編號(hào):2027620

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/2027620.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶f6649***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com