ADP開發(fā)項目風(fēng)險管理研究
發(fā)布時間:2018-05-11 02:17
本文選題:軟件項目 + 風(fēng)險管理。 參考:《南京理工大學(xué)》2015年碩士論文
【摘要】:軟件產(chǎn)業(yè)成為21世紀擁有最大產(chǎn)業(yè)規(guī)模和最具廣闊前景的新興產(chǎn)業(yè)之一,但軟件項目風(fēng)險高、軟件質(zhì)量差一直是困擾企業(yè)的一個大問題。風(fēng)險管理是項目管理中很重要的管理活動,通過風(fēng)險管理可以使項目進程更加平穩(wěn),可以獲得很高的跟蹤和控制項目的能力,有效的實施軟件風(fēng)險管理是軟件項目開發(fā)工作順利完成的保證。針對軟件項目的獨特性,充分學(xué)習(xí)軟件風(fēng)險管理的理論知識,同時在項目實踐活動中累積經(jīng)驗,有效的進行主動風(fēng)險防范和控制,降低風(fēng)險的破壞程度和實現(xiàn)利益最大化追求的目的。本文以當(dāng)前經(jīng)濟環(huán)境為背景,從國內(nèi)外軟件項目風(fēng)險管理研究現(xiàn)狀為出發(fā)點,用ADP項目,即一個提供手機無線多屏配件和供手機使用的軟件客戶端的開發(fā)過程為研究對象,詳細的從軟件項目生命周期的各個階段的角度去識別風(fēng)險,利用風(fēng)險知識庫,對辨識的風(fēng)險,采用風(fēng)險評估指數(shù)法(RAC)并且結(jié)合德爾菲法進行風(fēng)險評估,通過制定一系列的風(fēng)險行動計劃和風(fēng)險跟蹤應(yīng)對措施,有效防范或降低了項目風(fēng)險。ADP開發(fā)項目風(fēng)險管理的實踐經(jīng)驗對國內(nèi)企業(yè)軟件項目風(fēng)險管理提供借鑒意義。
[Abstract]:The software industry has become one of the emerging industries with the largest industrial scale and the most broad prospect in the 21st century, but the risk of software projects is high and the software quality is poor. Risk management is a very important management activity in project management. Through risk management, the process of the project can be more stable and the ability to track and control the project can be obtained. Effective implementation of software risk management is the guarantee of successful completion of software project development. In view of the uniqueness of the software project, we should fully learn the theoretical knowledge of software risk management, at the same time accumulate experience in the practical activities of the project, and effectively carry out active risk prevention and control. Reduce the damage degree of risk and achieve the goal of maximizing profit. This paper takes the current economic environment as the background, from the domestic and foreign software project risk management research present situation as the starting point, uses the ADP project, namely provides the handset wireless multi-screen accessory and the software client for the handset to use as the research object. From the point of view of each stage of the software project life cycle, the paper uses the risk knowledge base, adopts the risk assessment index method to evaluate the risk, and combines Delphi method to carry out the risk assessment. By making a series of risk action plans and risk tracking measures, the practical experience of developing project risk management by effectively preventing or reducing project risk. ADP provides reference for domestic enterprise software project risk management.
【學(xué)位授予單位】:南京理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:TP311.5
,
本文編號:1871967
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/1871967.html
最近更新
教材專著