建雞高速公路機(jī)場(chǎng)段項(xiàng)目施工組織設(shè)計(jì)研究
本文選題:項(xiàng)目管理 + 施工組織設(shè)計(jì); 參考:《長(zhǎng)安大學(xué)》2015年碩士論文
【摘要】:工程項(xiàng)目施工組織設(shè)計(jì)可以指導(dǎo)工程施工管理活動(dòng)中的各種施工技術(shù)、工作計(jì)劃和組織協(xié)調(diào)的統(tǒng)籌性文件,是工程施工項(xiàng)目管理與工程施工實(shí)踐的完美結(jié)合,是對(duì)工程項(xiàng)目整個(gè)過(guò)程的構(gòu)思和具體安排。它能使工程開(kāi)工后的施工能夠高效、快速、科學(xué)、合理地進(jìn)行,是指導(dǎo)工程項(xiàng)目進(jìn)行施工準(zhǔn)備和施工生產(chǎn)的基本前提和保障,是工程施工管理工作的重要組成部分。施工組織設(shè)計(jì)總的原則就是按照工程建設(shè)項(xiàng)目的基本要求和規(guī)定,確定科學(xué)、經(jīng)濟(jì)、合理的施工方案和施工方法,組織和協(xié)調(diào)施工中所需要的各種資源,在保證工程質(zhì)量、工程安全、工程進(jìn)度的前提下,科學(xué)合理地優(yōu)化各種資源配置,從而使工程建設(shè)項(xiàng)目能夠按照規(guī)定和標(biāo)準(zhǔn)保質(zhì)保量地按時(shí)完成。本文以建雞高速公路機(jī)場(chǎng)路項(xiàng)目的施工組織設(shè)計(jì)為研究對(duì)象,運(yùn)用理論與具體實(shí)際相結(jié)合的研究方法,用理論來(lái)指導(dǎo)施工建設(shè),而又不拘泥于理論,因?yàn)槊總(gè)工程都有各自的特點(diǎn)和要求,每個(gè)工程又有不同的施工環(huán)境和不可預(yù)見(jiàn)的狀況,所以必須針對(duì)各自的特點(diǎn),分別對(duì)待。同時(shí)還運(yùn)用了工程項(xiàng)目網(wǎng)絡(luò)計(jì)劃技術(shù)、統(tǒng)籌學(xué)原理、施工流水作業(yè)組織原理和數(shù)理學(xué)分析等理論,參考了國(guó)內(nèi)外大型工程施工組織設(shè)計(jì)的先進(jìn)理論和方法,結(jié)合建雞高速機(jī)場(chǎng)路工程項(xiàng)目施工組織的具體情況,提出了科學(xué)、高效、經(jīng)濟(jì)、合理的施工組織設(shè)計(jì)方案和相應(yīng)的保障措施。根據(jù)對(duì)建雞高速機(jī)場(chǎng)路項(xiàng)目工程施工組織設(shè)計(jì)的研究,以及嚴(yán)格、規(guī)范、高效的管理,經(jīng)濟(jì)、合理、科學(xué)的施工組織設(shè)計(jì),奠定了該工程項(xiàng)目保質(zhì)保量、順利完工的堅(jiān)實(shí)的基礎(chǔ)。本文的研究結(jié)果充分說(shuō)明了施工組織規(guī)劃作為公路建設(shè)的指導(dǎo)性文件的重要性,也為下一步工程的實(shí)施建設(shè)提供了強(qiáng)有力的科學(xué)依據(jù)。
[Abstract]:The construction organization design of engineering project can guide all kinds of construction technology, work plan and organization coordination in the construction management activities. It is a perfect combination of engineering construction project management and engineering construction practice. It is the conception and concrete arrangement of the whole process of the project. It can make the construction after the project start to be efficient, fast, scientific and reasonable. It is the basic premise and guarantee to guide the construction preparation and construction production of the project, and is an important part of the engineering construction management. The general principle of construction organization design is to determine scientific, economic and reasonable construction plans and construction methods in accordance with the basic requirements and regulations of engineering construction projects, to organize and coordinate all kinds of resources needed in construction, and to ensure the engineering quality. Under the premise of project safety and project schedule, all kinds of resources can be optimized scientifically and reasonably, so that the project can be completed according to the regulations and standards, quality and quantity on time. This paper takes the construction organization design of the airport road project of Jian-ji expressway as the research object, applies the research method of combining theory with concrete practice, uses the theory to guide the construction, but does not stick to the theory. Because each project has its own characteristics and requirements, and each project has its own construction environment and unpredictable situation, it must be treated separately according to its own characteristics. At the same time, with the application of engineering project network planning technology, overall planning principle, construction flow operation organization principle and mathematical analysis theory, the advanced theories and methods of large-scale engineering construction organization design at home and abroad are referred to. Combined with the concrete situation of the construction organization of the construction project of the construction of high speed mechanical yard, the scientific, efficient, economical and reasonable construction organization design scheme and the corresponding safeguard measures are put forward. According to the research on the construction organization design of the construction project of the Jiaoji high speed machine yard project, and the strict, standardized, efficient management, economic, reasonable and scientific construction organization design, the quality and quantity of the project has been established. A solid foundation for successful completion. The research results of this paper fully show the importance of the construction organization planning as the guiding document of highway construction, and also provide a strong scientific basis for the implementation of the next project.
【學(xué)位授予單位】:長(zhǎng)安大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類(lèi)號(hào)】:U415.2
【參考文獻(xiàn)】
相關(guān)期刊論文 前8條
1 張永會(huì);馬力;;多項(xiàng)目資源管理技術(shù)研究[J];計(jì)算機(jī)工程與設(shè)計(jì);2010年17期
2 張健;;施工組織設(shè)計(jì)編制偏差與改進(jìn)[J];人民黃河;2009年10期
3 張福全;;公路施工組織設(shè)計(jì)編制方法的改進(jìn)[J];交通世界(建養(yǎng).機(jī)械);2009年10期
4 唐可;;漢口—宜昌鐵路施工組織方案優(yōu)化探討[J];鐵道建筑;2009年06期
5 張紹陽(yáng);王選倉(cāng);;基于Petri網(wǎng)的公路施工資源總體優(yōu)化方法[J];長(zhǎng)安大學(xué)學(xué)報(bào)(自然科學(xué)版);2007年04期
6 方曉紅;施工項(xiàng)目成本控制的理論與實(shí)踐初探[J];巖土工程界;2003年01期
7 王龍,袁牧,余新明,蓋暹東;投標(biāo)前后施工組織設(shè)計(jì)的比較[J];建筑技術(shù);2001年04期
8 魏保安;施工組織設(shè)計(jì)與合理工期把握[J];技術(shù)經(jīng)濟(jì)與管理研究;1999年03期
相關(guān)碩士學(xué)位論文 前3條
1 王國(guó)榮;冶石公路工程項(xiàng)目施工組織設(shè)計(jì)研究[D];哈爾濱工程大學(xué);2010年
2 趙璞;赤大白鐵路防沙治沙工程的技術(shù)方案選擇與施工組織設(shè)計(jì)研究[D];吉林大學(xué);2009年
3 馮勇;施工網(wǎng)絡(luò)計(jì)劃優(yōu)化和控制研究[D];新疆農(nóng)業(yè)大學(xué);2003年
,本文編號(hào):1870388
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/1870388.html