風(fēng)險(xiǎn)控制下工程變更的方案優(yōu)選及綜合單價(jià)確定研究
本文選題:工程變更 + 綜合單價(jià)。 參考:《安徽工業(yè)大學(xué)》2015年碩士論文
【摘要】:建設(shè)工程項(xiàng)目的生產(chǎn)規(guī)模大、資源消耗多、生產(chǎn)和使用周期長(zhǎng)以及管理任務(wù)重等特點(diǎn)決定了工程項(xiàng)目實(shí)施過程中存在著大量導(dǎo)致工程變更的不確定因素,工程變更頻繁發(fā)生;而工程變更也對(duì)項(xiàng)目的投資、進(jìn)度、質(zhì)量三大管理目標(biāo)的實(shí)現(xiàn)形成了巨大阻礙。綜合工程變更發(fā)生的高頻性和變更對(duì)項(xiàng)目管理造成的不可小覷的影響,工程變更管理勢(shì)必成為建設(shè)工程項(xiàng)目管理的一項(xiàng)重要內(nèi)容,研究對(duì)工程變更的管理和控制具有重要意義。本文站在業(yè)主方的角度進(jìn)行研究,首先通過對(duì)工程變更管理相關(guān)背景資料的分析,總結(jié)出研究的意義和目的,然后通過對(duì)大量國(guó)內(nèi)外文獻(xiàn)資料的分析,總結(jié)出對(duì)工程變更管理研究的三個(gè)不足之處。接著對(duì)工程變更的定義、分類、表現(xiàn)形式及其影響等相關(guān)理論作一個(gè)概述,為接下來的研究奠定理論基礎(chǔ)。再接著對(duì)這三個(gè)問題分別提出實(shí)用的分類解決方法:第一,確定了一套變更風(fēng)險(xiǎn)流程管理的方法,分為設(shè)定目標(biāo)、風(fēng)險(xiǎn)識(shí)別、風(fēng)險(xiǎn)評(píng)估、風(fēng)險(xiǎn)分配、風(fēng)險(xiǎn)控制、風(fēng)險(xiǎn)管理后評(píng)估六個(gè)步驟來進(jìn)行工程變更風(fēng)險(xiǎn)的有效控制;第二,在做好變更風(fēng)險(xiǎn)控制的前提下,采用定性與定量相結(jié)合的方法,構(gòu)建群決策REM相對(duì)熵集結(jié)模型來進(jìn)行變更方案優(yōu)選,解決了變更方案選擇隨意性大的問題;第三,詳盡明確了三類變更綜合單價(jià)的確定方法并建立了識(shí)別變更綜合單價(jià)中不平衡報(bào)價(jià)的數(shù)學(xué)模型,解決了變更綜合單價(jià)確定無定則的問題;最后進(jìn)行研究總結(jié),指出本文研究的不足并對(duì)今后變更管理的研究作出展望。本文通過對(duì)工程變更管理中現(xiàn)存的三個(gè)問題提出實(shí)用的解決方法,為變更管理提供重要的思路,對(duì)順利實(shí)現(xiàn)項(xiàng)目管理的三大目標(biāo)具有重大的現(xiàn)實(shí)意義。
[Abstract]:The characteristics of large production scale, large consumption of resources, long production and service cycle and heavy management tasks determine that there are a large number of uncertain factors leading to engineering changes in the process of implementation of construction projects, and engineering changes occur frequently. But the project change also forms the huge obstacle to the project investment, the progress, the quality three management goal realization. The high frequency of the comprehensive engineering change and the influence of the change on the project management can not be underestimated. The engineering change management is bound to become an important content of the construction project management, and the research is of great significance to the management and control of the engineering change. In this paper, from the perspective of the owner, the author summarizes the significance and purpose of the research through the analysis of the background information of engineering change management, and then through the analysis of a large number of domestic and foreign literature. Three deficiencies of the research on project change management are summarized. Then the definition, classification, manifestation and influence of engineering change are summarized, which lays a theoretical foundation for the following research. Then put forward the practical classification solutions to these three problems: first, determine a set of change risk process management methods, including target setting, risk identification, risk assessment, risk allocation, risk control, After risk management, six steps are used to effectively control the risk of engineering change. Secondly, the qualitative and quantitative methods are used to control the risk of engineering change. The REM relative entropy aggregation model is constructed to optimize the selection of change schemes, which solves the problem of randomness in the selection of change schemes. Thirdly, In this paper, the methods of determining three kinds of variable integrated unit price are clarified in detail, and the mathematical model of identifying unbalanced quotation in changing comprehensive unit price is established, which solves the problem of determining the unfixed price of changing comprehensive unit price. This paper points out the deficiency of this paper and looks forward to the study of change management in the future. This paper puts forward practical solutions to the three existing problems in project change management, which provides important ideas for change management, and has great practical significance for the smooth realization of the three goals of project management.
【學(xué)位授予單位】:安徽工業(yè)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TU723
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 楊春;吳學(xué)偉;;綜合單價(jià)的確定方法[J];重慶建筑;2008年07期
2 劉余強(qiáng);;淺談綜合單價(jià)中風(fēng)險(xiǎn)分析與規(guī)避[J];山西建筑;2009年25期
3 張英;;綜合單價(jià)風(fēng)險(xiǎn)評(píng)估的研究及應(yīng)用[J];天津城市建設(shè)學(xué)院學(xué)報(bào);2010年03期
4 華愛華,周正明,陳林章;綜合單價(jià)管理是提高企業(yè)經(jīng)濟(jì)效益的有效途徑[J];江蘇煤炭;1997年02期
5 陶學(xué)明;李穎;;基于工程量清單計(jì)價(jià)模式的綜合單價(jià)風(fēng)險(xiǎn)控制[J];西華大學(xué)學(xué)報(bào)(自然科學(xué)版);2010年02期
6 李燕玲;;建設(shè)工程投標(biāo)報(bào)價(jià)中綜合單價(jià)的風(fēng)險(xiǎn)控制[J];廣東建材;2009年08期
7 尹貽林;唐海榮;翟露;;成本加利潤(rùn)原則下工程變更綜合單價(jià)的確定研究[J];建筑經(jīng)濟(jì);2012年10期
8 石貽謀;以新編制辦法為基礎(chǔ)的綜合單價(jià)速算法[J];鐵路工程造價(jià)管理;1999年06期
9 霍如路;;談綜合單價(jià)的編制及應(yīng)用[J];山西建筑;2014年12期
10 謝達(dá);綜合單價(jià)計(jì)算表在合同管理中的應(yīng)用[J];基建優(yōu)化;2004年04期
相關(guān)重要報(bào)紙文章 前4條
1 馬占林;清單計(jì)價(jià)中如何確定綜合單價(jià)[N];西海農(nóng)民報(bào);2011年
2 雷士國(guó);合同中至少體現(xiàn)10個(gè)明確[N];建筑時(shí)報(bào);2012年
3 通訊員 劉國(guó)清;念好“勞務(wù)經(jīng)” 攜手奔“錢”程[N];中國(guó)鐵道建筑報(bào);2014年
4 本報(bào)記者 張高青;工程項(xiàng)目中的談判高手[N];建筑時(shí)報(bào);2007年
相關(guān)碩士學(xué)位論文 前5條
1 許琴;工程項(xiàng)目變更的審計(jì)研究[D];西南交通大學(xué);2016年
2 劉云云;基于云計(jì)算Hadoop平臺(tái)的綜合單價(jià)預(yù)測(cè)研究[D];西安建筑科技大學(xué);2016年
3 譚紫;風(fēng)險(xiǎn)控制下工程變更的方案優(yōu)選及綜合單價(jià)確定研究[D];安徽工業(yè)大學(xué);2015年
4 李領(lǐng)玉;基于AHP法的“四新”項(xiàng)目單價(jià)確定方法的選擇研究[D];長(zhǎng)沙理工大學(xué);2013年
5 劉欲意;基于MCS確定公路清單項(xiàng)目綜合單價(jià)合理范圍的研究[D];長(zhǎng)沙理工大學(xué);2011年
,本文編號(hào):1835286
本文鏈接:http://sikaile.net/guanlilunwen/xiangmuguanli/1835286.html