Mineral resources are the material foundation of human civilization,and mines throughout the production process produce large amounts of waste water,waste water discharged from the place of stope,dressing to the tailings and living areas,without processing or processing standards will result in soil surface water and underground water pollution,causing serious damage to the mine environment,the growth of animals and plants and human health adverse impact.But the shortage of water resources has become one of the key reasons which restrict the sustainable development of social economy,so the sewage treatment and reuse of wastewater has attracted much attention.At present,the world is paying more attention to the construction of sewage treatment plant,is through a variety of technical means,to further improve the quality,efficiency and automation of sewage treatment sewage treatment process.In the process of construction of wastewater treatment plant,wastewater treatment facilities layout design as an important work of plant construction,its quality directly affects the entire wastewater treatment of logistics,information flow,production capacity and technological process,flexibility,efficiency,cost and safety aspects of facility layout good,should be all factors influencing the facility layout are taken into account,so that the material handling cost is reduced to a minimum,so that the efficiency of process improvement,reasonably full and effective use of regional space,and as far as possible due to bring various factors change layout changes into consideration,to extend and adjust to facilitate future.Therefore,how to do well the facility layout design of wastewater treatment plant is very important.This paper around the Xincheng Gold mine wastewater treatment.plant facility layout were studied,taking Xincheng Gold mine wastewater treatment renovation project and tailings backwater system system as a case study,combined with the existing conditions,status of sewage treatment plant in Xincheng Gold Mine and put forward the question,to solve the problem,the main use of SLP system analysis,based on the sewage treatment method of data analysis,each operating unit logistics mutual relationship analysis and comprehensive relationship analysis,through the analysis of drawing activity position relationship graph,with each operating unit area draw the relevant map area,and then consider the actual layout of influence factors of sewage treatment plant,sewage treatment plant facility layout drawing up the design scheme,then has carried on the analysis and comparison 'of quantitative and'qualitative to layout and by using the weighted factor comparison method to carry on comprehensive evaluation to the scheme,put forward relevant Xincheng Gold mine wastewater treatment system facilities layout planning and design of optimal solution.This paper aims to taking Xincheng Gold Mine sewage treatment system upgrade project as a case study,the facility layout with layout design system theory,according to the system layout design in the application of plant facility layout design of wastewater treatment,will explore the various management methods applied in the project practice,break through the SLP is commonly used in industrial manufacturing workshop practice,expand the SLP theory methods in the application range of industrial facilities layout,the traditional method at the same time in the facility layout of the sewage treatment plant to break through on the qualitative analysis and the combination of personal experience,method of generation with quantitative analysis and system layout design,combined with the sewage treatment plant facility layout requirements for the application of perfecting the theory in the practice,the reasonable processing related data and provide the beneficial exploration and the reference for the facility planning layout of sewage treatment plants or similar items.
【學位單位】:東北大學
【學位級別】:碩士
【學位年份】:2014
【中圖分類】:X753
【部分圖文】:
??規(guī)劃與設計是指從工程項目建設流程上講,設施規(guī)劃與設計貫竣工始終。狹義的設施規(guī)劃與設計是為生產(chǎn)或服務系統(tǒng)合理配或擴建的生產(chǎn)或服務系統(tǒng),綜合考慮相關因素,進行分析、規(guī)理配置資源,使系統(tǒng)能夠有效運行,達到預期目標的一門學科與設計一般是指,以企業(yè)生產(chǎn)系統(tǒng)的結構布局為研究對象,從探討企業(yè)平面布置設計目標及原則,著重研究設計方法與設計、物流、信息流得到最科學、合理、經(jīng)濟、有效的配置和安排,現(xiàn)以最少的投入獲得最大收益的目標。??劃與設計的研究范圍??從工業(yè)工程角度上分為場址選擇和設施設計兩部分。設施設計設計、建筑設計、公用工程設計及信息通信設計五部分組成,組成圖所示。??——場(廠)址選擇??

圖2.5成組技術布置圖??Fig.2.5?Layout?of?Group?Technology??

??加:C#?元3??圖2.5成組技術布置圖??Fig.2.5?Layout?of?Group?Technology??表2.4成組技術布置的優(yōu)缺點???Table2.4?The?Advantages?and?Disa
【參考文獻】
相關期刊論文 前10條
1 陳雷雷;沈妙妙;王玥瑩;;基于SLP的食品物流設施平面布局方法研究[J];安徽農(nóng)業(yè)科學;2011年03期
2 楊嘉偉;黃浪;;系統(tǒng)化布置設計在物流公司倉儲布局優(yōu)化中的應用[J];產(chǎn)業(yè)與科技論壇;2010年07期
3 林清戀;劉朧;李萍;;SLP在醫(yī)院手術室布置設計中的應用[J];工業(yè)工程;2009年05期
4 周三元;;物流設施布置程序模式淺析[J];物流技術;2009年03期
5 于宏朋;;基于SLP的短流程煉鋼車間工藝布置設計研究[J];現(xiàn)代冶金;2009年01期
6 劉光富;陳曉莉;;系統(tǒng)布置設計在生產(chǎn)系統(tǒng)優(yōu)化中的應用[J];工業(yè)工程與管理;2008年03期
7 歐洋逗;;制造型企業(yè)物流分析與優(yōu)化[J];柴油機設計與制造;2008年01期
8 琚科昌;王轉;;基于SLP的流程型制造企業(yè)物流設施布局分析方法及應用[J];物流技術;2006年10期
9 馬光鋒,奚文;設施規(guī)劃在我國的應用與發(fā)展[J];機械設計與制造;2005年10期
10 劉正剛,姚冠新;設施布置設計的回顧、現(xiàn)狀與展望[J];江蘇理工大學學報(社會科學版);2001年01期
相關碩士學位論文 前6條
1 戴巖;MD公司蕪湖工廠內(nèi)部設施布局的研究[D];華南理工大學;2011年
2 王哲;基于精益生產(chǎn)的OTIS公司工廠布局改善研究[D];天津大學;2009年
3 盛茜;基于精益生產(chǎn)思想的廠房設施規(guī)劃與布局研究[D];上海交通大學;2009年
4 吳琨;LX集團RDC布局規(guī)劃研究[D];北京交通大學;2008年
5 關健;基于多目標規(guī)劃的物流中心設施布置設計的研究[D];西南交通大學;2008年
6 唐小明;物流節(jié)點設施布置設計方法研究[D];長安大學;2006年
本文編號:
2893386
本文鏈接:http://sikaile.net/guanlilunwen/wuliuguanlilunwen/2893386.html