火電與風(fēng)電投資效益比較研究
[Abstract]:Since the reform and opening up to the outside world, China's economy has changed from planned economy to market economy. Project investment is also characterized by large scale, high technology content, diversified investment subjects and financing channels. But in the actual operation process, the power plant construction project investment scale is large, the operation cycle is relatively long. Billions of dollars of investment if there is a mistake in decision-making, the losses will be incalculable. All of these make the investment benefit evaluation of electric power projects more stringent. After more than ten years' development, China's electric power market has expanded its scale, deepened its innovation, improved the disclosure of market information, and quickened the pace of market integration with the international market. Since the beginning of the 21st century, with the intensification of the contradiction between coal and electricity prices, the loss of thermal power plants in China has intensified, and the investment in thermal power has been greatly reduced. At the same time, wind energy, as an efficient and clean energy, has been paid more and more attention by more and more countries, and the investment of wind power farm has been paid more and more attention by the people. As more and more enterprises begin to invest in wind power, people pay more and more attention to wind power investment. In today's environment, whether the enterprises should continue to invest in thermal power plants or should change their thinking to develop wind power industry, the author thinks it is necessary to study, analyze and discuss the benefits of the two kinds of investment. The purpose of this paper is to establish a multi-level fuzzy comprehensive evaluation model to evaluate the investment benefits of power plant construction projects, and then to compare and analyze the advantages and disadvantages of the two kinds of investment: thermal power and wind power. Firstly, this paper introduces the investment status and the basic theory of investment benefit of thermal power and wind power at home and abroad, and then designs the index system of investment benefit evaluation through the basic theory content of investment benefit evaluation of power plant construction project. The weight of each index is determined by analytic hierarchy process (AHP) to reflect the importance of each index objectively. After the weight has been determined, a thermal power construction project and a wind power construction project are selected to obtain relatively scientific and reliable actual data through actual investigation and research. Finally, the investment benefit of power plant construction project is evaluated by fuzzy comprehensive evaluation model. Through demonstration and research, it is concluded that the economic benefit of thermal power project investment is better, and the social benefit of wind power construction project investment is more advantageous.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:F275;F426.61
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 佘艷;;基于費用-效果分析的社會公益性投資項目評價[J];安徽農(nóng)業(yè)科學(xué);2005年11期
2 高虎,王仲穎;我國風(fēng)電發(fā)展的促進(jìn)政策(英文)[J];Electricity;2004年04期
3 許洪華,郭金東 ,鄂春良;世界風(fēng)電技術(shù)發(fā)展趨勢和我國未來風(fēng)電發(fā)展探討[J];電力設(shè)備;2005年10期
4 花擁軍,陳迅,張健;公共工程社會評價指標(biāo)體系分析[J];重慶大學(xué)學(xué)報(自然科學(xué)版);2005年07期
5 黃生權(quán);項目評價指標(biāo)──凈現(xiàn)值的擴(kuò)展[J];技術(shù)經(jīng)濟(jì)與管理研究;2001年06期
6 劉寶蘭,文華里;世界風(fēng)力發(fā)電現(xiàn)狀與前景[J];能源工程;2000年04期
7 袁光才;;國內(nèi)建設(shè)項目經(jīng)濟(jì)評價體系分析[J];四川水力發(fā)電;2006年02期
8 郭大蕾;王飛躍;易建強(qiáng);高海軍;張向文;;風(fēng)電資源開發(fā)利用進(jìn)展[J];太陽能;2005年05期
9 胡寶清,張軒,盧兆明;可拓評價方法的改進(jìn)及其應(yīng)用研究[J];武漢大學(xué)學(xué)報(工學(xué)版);2003年05期
10 郎益夫;王宏彬;;績效評價原則與指標(biāo)新探索——以國內(nèi)外高等教育為實證[J];學(xué)習(xí)與探索;2008年06期
相關(guān)碩士學(xué)位論文 前7條
1 李和平;火電建設(shè)項目財務(wù)評價方法與指標(biāo)體系研究[D];華北電力大學(xué)(北京);2011年
2 曹陽;電網(wǎng)投資效益評價的研究[D];浙江大學(xué);2005年
3 陳平;基于電價預(yù)測的水電工程投資控制與效益最大化實現(xiàn)研究[D];四川大學(xué);2005年
4 馮暉;我國風(fēng)電產(chǎn)業(yè)投資戰(zhàn)略研究[D];華北電力大學(xué)(北京);2006年
5 郭海星;高速公路項目投資效益研究[D];長安大學(xué);2006年
6 唐冰;火電廠節(jié)能改造項目投資效益后評價及案例研究[D];華北電力大學(xué)(河北);2008年
7 張守平;電廠建設(shè)項目投資效益評價研究[D];華北電力大學(xué)(河北);2009年
,本文編號:2449016
本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/2449016.html