配電網(wǎng)建設(shè)項(xiàng)目風(fēng)險(xiǎn)管理研究
[Abstract]:With the rapid development of power industry, the importance of distribution network construction is becoming more and more prominent. At present, the state has invested funds into the construction of distribution network, and the form of power grid in our country has also begun to shift from loss to profit. The development of distribution network is the development of society and the advance of national progress. The construction effect of distribution network project is directly related to the accelerated progress of national economy. In the process of distribution network construction, the project needs to ensure high reliability and safety, which leads to the high risk in the construction of the project. The construction period of distribution network construction project is long, the sample data exists error, and the uncertainty is strong, so there are many uncertain factors in the planning process. Distribution network construction project is a highly comprehensive and technical work, but also a decision-making process with more input and output, high risk. Therefore, it is necessary to evaluate the risk factors of distribution network construction project and implement timely prevention and control to reduce the risk of distribution network construction project. Based on the research of the key problems in the risk management of distribution network construction project, this paper puts forward a relatively perfect theoretical framework and method system of the distribution network construction project risk management. At the same time, distribution network construction risk management is a dynamic process, in different periods of the project, the importance of risk decision-making will be different, making the specific management process is also different. In this paper, the comprehensive evaluation theory framework and its index system are established, and the comprehensive risk evaluation model based on fuzzy grey evaluation method is established according to the risk situation of distribution network construction projects, considering the relevant factors such as policy, technology, economy and management. The scientific problem of index and weight in the evaluation of distribution network construction project has been solved well. Taking a distribution network construction project as an example, the project risk is evaluated by combining qualitative and quantitative indexes. It can be seen from the evaluation results that there are certain risks in distribution network management enterprises, which need to be prevented and controlled. According to the risk factors in the construction of distribution network, according to the risk management theory and previous practice experience, this paper puts forward the corresponding risk prevention strategy to eliminate the risk or reduce the risk factors.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:F426.61
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張鐵峰,苑津莎,郭偉;基于數(shù)據(jù)包絡(luò)分析的配電網(wǎng)投資項(xiàng)目經(jīng)濟(jì)評價(jià)[J];電力建設(shè);2005年07期
2 羅鳳章,肖峻,王成山,張永伍,郭鐵軍;計(jì)及電價(jià)波動(dòng)的電網(wǎng)建設(shè)項(xiàng)目經(jīng)濟(jì)評估區(qū)間法[J];電網(wǎng)技術(shù);2005年08期
3 王晶;何永秀;戴愛英;王躍錦;何海英;;基于風(fēng)險(xiǎn)與實(shí)物期權(quán)理論的城市電網(wǎng)規(guī)劃經(jīng)濟(jì)評價(jià)研究[J];華東電力;2010年02期
4 商迎秋;;企業(yè)戰(zhàn)略風(fēng)險(xiǎn)識(shí)別模型構(gòu)建[J];技術(shù)經(jīng)濟(jì)與管理研究;2011年01期
5 張格亮;李昕;;風(fēng)險(xiǎn)投資項(xiàng)目評估中幾種數(shù)學(xué)方法評析[J];牡丹江師范學(xué)院學(xué)報(bào)(自然科學(xué)版);2012年01期
6 劉寧;申曉留;;配電網(wǎng)改造風(fēng)險(xiǎn)分析決策支持系統(tǒng)的研究和實(shí)現(xiàn)[J];現(xiàn)代計(jì)算機(jī)(專業(yè)版);2008年05期
7 馮斌;李大全;廖國威;;改進(jìn)的油氣管道風(fēng)險(xiǎn)專家評分方法[J];油氣儲(chǔ)運(yùn);2008年11期
8 許滿庫;王海鯤;張東;;電網(wǎng)建設(shè)項(xiàng)目風(fēng)險(xiǎn)評價(jià)研究[J];中國電力教育;2007年S2期
9 肖峻;何麗薇;羅鳳章;劉鳴;劉志巍;;基于區(qū)間的電力建設(shè)項(xiàng)目經(jīng)濟(jì)評估方法研究[J];中國電力;2006年12期
10 柴洪;馬竹書;;基于蒙特卡羅模擬法的工程項(xiàng)目財(cái)務(wù)風(fēng)險(xiǎn)評估[J];項(xiàng)目管理技術(shù);2012年11期
相關(guān)碩士學(xué)位論文 前4條
1 陳明峗;配電GIS系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[D];華中科技大學(xué);2006年
2 王佳賢;城市配電網(wǎng)經(jīng)濟(jì)性評估研究[D];上海交通大學(xué);2008年
3 郅擎宇;城市配電網(wǎng)建設(shè)項(xiàng)目風(fēng)險(xiǎn)管理研究[D];華北電力大學(xué)(河北);2008年
4 湯明陽;配電網(wǎng)建設(shè)改造的投資風(fēng)險(xiǎn)識(shí)別與評價(jià)[D];華北電力大學(xué)(河北);2009年
,本文編號(hào):2321232
本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/2321232.html