基于逐層模糊法的東陽變電站工程風(fēng)險(xiǎn)綜合評(píng)價(jià)研究
[Abstract]:As a social and public basic industry, electricity supply is closely related to the social and economic development and people's life. The project construction of the substation project not only has significant economic benefits, but also has great social benefits. However, there are many factors involved in the substation project (planning, design, investment, time, technology, construction, supervision, environmental protection and so on. " The whole process of construction construction of substation is restricted by many complex factors, whether its economic benefit or its social benefit is full of uncertainty, and all these are influenced and restricted by the objective conditions such as social, political, economic, natural environment and so on. It has great randomness. There is a great risk in the construction of substation project. Based on this, it is of great theoretical significance and necessary practical significance to study and evaluate the risk and risk of substation engineering. On the one hand, through the analysis of the risk of substation engineering, it is helpful for us to deepen the risk of the substation engineering. Understanding, fully understanding the impact of risk on Substation Engineering, and making a good foundation for the solution or dispersion of risk; on the other hand, the scientific evaluation of the risk of substation engineering through actual data helps us to quantify the risk and help us to understand the degree of the risk of the substation engineering from the quantity angle to the future. Long term preventive measures and avoiding risk loss are based on scientific evidence.
The construction of the substation project is full of uncertainty from the construction of the plan to the completion and delivery of the project, and there are various risks in the different construction stages of the project construction. In addition, the construction objectives of different substation projects are different. The cost and cost are minimized, and so on. Therefore, how to evaluate the risk of the substation engineering from the whole point of view and grasp the overall risk level of the substation engineering will become a complicated problem in front of our reality.
Based on this, this paper, based on the practice of the work unit, takes the Dongyang substation project as the sample, analyzes the risk factors of the substation engineering, uses the multi-layer fuzzy comprehensive evaluation method to establish the risk evaluation index system, and makes a scientific evaluation on the overall level of the substation engineering risk, and puts forward the corresponding risk coping measures aiming at the evaluation results. In order to provide theoretical guidance for the risk management and control of substation engineering, and provide reference for the overall grasp and response of similar substation engineering risks.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:F426.61
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 安在國;;AHP_模糊綜合評(píng)價(jià)法在橋梁工程風(fēng)險(xiǎn)評(píng)價(jià)中的應(yīng)用探析[J];城市道橋與防洪;2010年02期
2 胡勁松,達(dá)慶利,金毅;模糊網(wǎng)絡(luò)關(guān)鍵路線分析[J];管理工程學(xué)報(bào);1999年01期
3 常云濤,李嘉;模糊網(wǎng)絡(luò)的工期與關(guān)鍵線路分析[J];湖南大學(xué)學(xué)報(bào)(自然科學(xué)版);1999年06期
4 石曉軍,李健,李暉;項(xiàng)目投資風(fēng)險(xiǎn)評(píng)估、分析的幾種主要方法的比較研究[J];技術(shù)經(jīng)濟(jì)與管理研究;1998年06期
5 王家遠(yuǎn);鄒小偉;張國敏;;建設(shè)項(xiàng)目生命周期的風(fēng)險(xiǎn)識(shí)別[J];科技進(jìn)步與對(duì)策;2010年19期
6 胡海波,劉志杰;模糊型網(wǎng)絡(luò)計(jì)劃完工概率的計(jì)算和仿真[J];昆明理工大學(xué)學(xué)報(bào)(理工版);2005年03期
7 張輝;高德利;;基于模糊數(shù)學(xué)和灰色理論的多層次綜合評(píng)價(jià)方法及其應(yīng)用[J];數(shù)學(xué)的實(shí)踐與認(rèn)識(shí);2008年03期
8 郭宇,劉爾烈;應(yīng)用蒙特卡羅方法改進(jìn)項(xiàng)目成本風(fēng)險(xiǎn)分析[J];天津大學(xué)學(xué)報(bào);2002年02期
9 石曉軍,任志安;項(xiàng)目投資風(fēng)險(xiǎn)分析方法研究:一種基于影響圖的解析方法[J];系統(tǒng)工程理論與實(shí)踐;2000年03期
10 許登超,沙基昌,張朋柱,萬百五;基于Delphi法的轉(zhuǎn)產(chǎn)項(xiàng)目建設(shè)風(fēng)險(xiǎn)[J];系統(tǒng)工程理論與實(shí)踐;2000年12期
相關(guān)博士學(xué)位論文 前1條
1 余宏亮;基于工程圖紙的地鐵車站施工安全風(fēng)險(xiǎn)自動(dòng)識(shí)別研究[D];華中科技大學(xué);2011年
相關(guān)碩士學(xué)位論文 前5條
1 孫麗麗;基于灰色理論的三貴口110KV輸變電工程風(fēng)險(xiǎn)評(píng)價(jià)研究[D];華北電力大學(xué);2011年
2 劉迎春;建筑企業(yè)進(jìn)行工程項(xiàng)目風(fēng)險(xiǎn)管理的研究[D];對(duì)外經(jīng)濟(jì)貿(mào)易大學(xué);2002年
3 呂立寨;500kV羅百二回輸變電工程線路工程風(fēng)險(xiǎn)評(píng)價(jià)[D];華北電力大學(xué)(河北);2009年
4 李春鵬;高密市110kV姚哥莊農(nóng)網(wǎng)改造工程風(fēng)險(xiǎn)評(píng)價(jià)研究[D];華北電力大學(xué);2012年
5 徐輝;500kV仁和輸變電工程項(xiàng)目風(fēng)險(xiǎn)分析與管理研究[D];浙江工業(yè)大學(xué);2012年