【摘要】:電力行業(yè)作為我國(guó)國(guó)民經(jīng)濟(jì)的支柱性產(chǎn)業(yè)之一,擔(dān)負(fù)著我國(guó)全國(guó)國(guó)民經(jīng)濟(jì)發(fā)展和保障人民正常生活用電的艱巨任務(wù)。隨著我國(guó)改革開(kāi)放的不斷深化和經(jīng)濟(jì)體系的不斷完善,工程項(xiàng)目的招標(biāo)、投標(biāo)、風(fēng)險(xiǎn)投資機(jī)制、責(zé)任制的逐步推廣,項(xiàng)目風(fēng)險(xiǎn)管理的實(shí)施顯得尤為重要。 縣級(jí)供電企業(yè)相對(duì)于其他大供電企業(yè)來(lái)說(shuō),自身在規(guī)模、技術(shù)、資金、施工經(jīng)驗(yàn)上略差,整體的綜合實(shí)力低一個(gè)層次。在經(jīng)營(yíng)活動(dòng)的不確定性以及競(jìng)爭(zhēng)的不斷加劇的情況下,對(duì)縣級(jí)供電企業(yè)工程項(xiàng)目的風(fēng)險(xiǎn)管理是十分必要的。 本文基于密云供電公司的實(shí)際情況,運(yùn)用項(xiàng)目風(fēng)險(xiǎn)管理的分析方法,為更好的規(guī)避風(fēng)險(xiǎn),將電力工程項(xiàng)目的特殊性充分的融入其中,結(jié)合電網(wǎng)和特定環(huán)境,對(duì)項(xiàng)目風(fēng)險(xiǎn)進(jìn)行識(shí)別、量化、評(píng)價(jià)、制定應(yīng)對(duì)措施、進(jìn)行風(fēng)險(xiǎn)監(jiān)控,從經(jīng)濟(jì)風(fēng)險(xiǎn)、技術(shù)風(fēng)險(xiǎn)、環(huán)境風(fēng)險(xiǎn)、社會(huì)與市場(chǎng)風(fēng)險(xiǎn)、管理風(fēng)險(xiǎn)角度出發(fā),建立電力工程項(xiàng)目的風(fēng)險(xiǎn)評(píng)價(jià)體系,并在此基礎(chǔ)上根據(jù)風(fēng)險(xiǎn)評(píng)價(jià)指標(biāo)的特點(diǎn),量身打造一套工程項(xiàng)目模糊綜合評(píng)價(jià)模型。并以密云唐莊110千伏變電站升壓工程為實(shí)例,根據(jù)該工程的工程量、施工環(huán)境、技術(shù)要求、設(shè)備要求、工期長(zhǎng)短、所需資金額度等具體情況,運(yùn)用本研究所建立的密云供電公司的風(fēng)險(xiǎn)管理模型,進(jìn)行檢驗(yàn)性分析,并根據(jù)這一結(jié)果制定密云供電公司應(yīng)該采取的風(fēng)險(xiǎn)防范措施,希冀為完善密云供電公司現(xiàn)行制度和體系提供思考。
[Abstract]:As one of the pillar industries of our national economy, the electric power industry shoulders the arduous task of developing the national economy and ensuring the normal life of the people.With the deepening of China's reform and opening up and the continuous improvement of the economic system, it is particularly important to carry out project risk management because of the gradual promotion of project bidding, bidding, venture capital mechanism and responsibility system.Compared with other large power supply enterprises, the county-level power supply enterprises are inferior in scale, technology, capital and construction experience, and the overall comprehensive strength is one level lower.Under the circumstance of the uncertainty of operation activity and the increasing competition, it is necessary to manage the project risk of power supply enterprise at county level.In this paper, based on the actual situation of Miyun Power supply Company, using the analysis method of project risk management, in order to better avoid risk, the particularity of power engineering project is fully integrated into it, combined with the power grid and specific environment.Identifying, quantifying, evaluating, formulating countermeasures and monitoring the risks of the project, starting from the perspectives of economic risk, technical risk, environmental risk, social and market risk, and management risk,The risk evaluation system of electric power engineering project is established, and a set of fuzzy comprehensive evaluation model of engineering project is built according to the characteristics of risk evaluation index.Taking the 110 kV substation boost project of Miyun Tangzhuang as an example, according to the specific conditions of the project, such as quantity, construction environment, technical requirements, equipment requirements, duration of construction, amount of funds required, etc.,By using the risk management model of Miyun Power supply Company established by this research, the paper makes a test analysis, and according to this result, formulates the risk prevention measures that should be taken by Miyun Power supply Company.Hope to perfect Miyun power supply company's current system and system to provide reflection.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:F426.61

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 林衛(wèi)宇;林炳華;林濟(jì)群;;電力工程項(xiàng)目風(fēng)險(xiǎn)管理研究[J];能源與環(huán)境;2009年04期

2 丁迎周;宋春雨;;風(fēng)險(xiǎn)管理及其在航天項(xiàng)目中的應(yīng)用[J];裝備制造技術(shù);2008年09期

3 謝喜麗;;項(xiàng)目風(fēng)險(xiǎn)管理發(fā)展歷程及趨勢(shì)[J];合作經(jīng)濟(jì)與科技;2010年14期

4 朱大萌,馬詩(shī)詠;項(xiàng)目風(fēng)險(xiǎn)管理的持續(xù)改進(jìn)方法[J];建筑管理現(xiàn)代化;2004年04期

5 盧德林;模糊綜合評(píng)判在土建工程投標(biāo)風(fēng)險(xiǎn)決策中的應(yīng)用[J];基建優(yōu)化;1999年06期

6 尹志軍,陳立文,王雙正,蘇春生;我國(guó)工程項(xiàng)目風(fēng)險(xiǎn)管理進(jìn)展研究[J];基建優(yōu)化;2002年04期

7 張建斌,張楠楠;我國(guó)工程風(fēng)險(xiǎn)管理與工程保險(xiǎn)制度研究[J];基建優(yōu)化;2003年02期

8 王紅衛(wèi);;建設(shè)項(xiàng)目風(fēng)險(xiǎn)管理問(wèn)題研究:美國(guó)經(jīng)驗(yàn)及其啟示[J];技術(shù)經(jīng)濟(jì)與管理研究;2008年05期

9 高忠民;;淺談我國(guó)工程項(xiàng)目風(fēng)險(xiǎn)管理的研究及應(yīng)用現(xiàn)狀[J];科技致富向?qū)?2011年33期

10 錢昊,馬維珍;層次分析法在項(xiàng)目風(fēng)險(xiǎn)管理中的應(yīng)用[J];蘭州交通大學(xué)學(xué)報(bào);2005年03期

相關(guān)博士學(xué)位論文 前3條

1 唐小麗;模糊網(wǎng)絡(luò)分析法及其在大型工程項(xiàng)目風(fēng)險(xiǎn)評(píng)價(jià)中的應(yīng)用研究[D];南京理工大學(xué);2007年

2 官慶;大型公用建筑項(xiàng)目設(shè)計(jì)風(fēng)險(xiǎn)管理研究[D];西南交通大學(xué);2007年

3 王農(nóng)躍;企業(yè)全面風(fēng)險(xiǎn)管理體系構(gòu)建研究[D];河北工業(yè)大學(xué);2008年

相關(guān)碩士學(xué)位論文 前4條

1 王震;縣級(jí)供電企業(yè)經(jīng)營(yíng)風(fēng)險(xiǎn)評(píng)估與規(guī)避策略研究[D];華北電力大學(xué)(北京);2011年

2 吳強(qiáng);我國(guó)證券公司風(fēng)險(xiǎn)管理研究[D];山東大學(xué);2007年

3 馬悅;電網(wǎng)規(guī)劃項(xiàng)目風(fēng)險(xiǎn)評(píng)估研究[D];華北電力大學(xué)(河北);2008年

4 趙連江;電力工程總承包風(fēng)險(xiǎn)研究與對(duì)策[D];華北電力大學(xué)(北京);2010年



本文編號(hào):1731403

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/1731403.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶09cf2***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com