基于六西格瑪?shù)墓╇娖髽I(yè)庫存優(yōu)化研究
本文選題:庫存管理 切入點(diǎn):供電企業(yè) 出處:《天津大學(xué)》2013年碩士論文
【摘要】:物資是企業(yè)正常運(yùn)營的物質(zhì)基礎(chǔ),供電企業(yè)物資需求量大,實(shí)效性強(qiáng),直接影響企業(yè)的運(yùn)行成本。對(duì)于企業(yè)整個(gè)物流過程中的每一個(gè)環(huán)節(jié)而言,無論是物資采購,還是物資的裝卸、運(yùn)輸、配送等都離不開庫存。簡(jiǎn)而言之,庫存已經(jīng)滲透到整個(gè)物流系統(tǒng)的每一個(gè)環(huán)節(jié)中。目前,大型企業(yè)的經(jīng)營管理過程中,都非常重視庫存優(yōu)化工作。庫存管理是一項(xiàng)巨大昂貴的投資,,需要支付巨額的成本。通過庫存優(yōu)化努力減少庫存并降低庫存成本,甚至追求零庫存是庫存管理乃至物流管理的中心與終極目標(biāo)。本文主要針對(duì)供電企業(yè)庫存積壓狀況而展開的,主要目標(biāo)是采用合理的方法降低庫存積壓,使庫存物資優(yōu)化到合理水平上,降低庫存資金占用,提高供電企業(yè)運(yùn)行效率及競(jìng)爭(zhēng)力。 根據(jù)精益管理理論,結(jié)合供電企業(yè)倉儲(chǔ)管理工作實(shí)際情況,采用六西格瑪數(shù)據(jù)分析方法,對(duì)倉儲(chǔ)物資管理中出現(xiàn)的問題進(jìn)行了精細(xì)化的定義、測(cè)量、分析及改進(jìn)。本文的主要研究?jī)?nèi)容如下: ⑴三大類物資:備品備件、待分配物資和在建項(xiàng)目物資是倉儲(chǔ)物資的主要構(gòu)成,是降低庫存積壓的分析重點(diǎn),對(duì)于倉儲(chǔ)物資現(xiàn)狀分析有重要意義。 ⑵對(duì)備品備件庫存特性進(jìn)行分析,進(jìn)而確定備品備件合理庫存計(jì)算模型。 ⑶確定異常退料界定與控制方法,采用雷達(dá)圖分析確定異常退料控制指標(biāo)及其措施。 ⑷對(duì)在建物資庫存結(jié)構(gòu)分析,確定合理利用及處理積壓物資措施,通過提高庫存周轉(zhuǎn)率實(shí)現(xiàn)在建物資庫存量最優(yōu)。
[Abstract]:The material is the material foundation of the normal operation of the enterprise, the material demand of the power supply enterprise is large, the actual effect is strong, it directly affects the running cost of the enterprise. For every link in the whole logistics process of the enterprise, no matter it is the material purchase, Or material handling, transportation, distribution and so on can not be separated from inventory. In short, inventory has penetrated into every link of the whole logistics system. At present, in the process of operation and management of large enterprises, Inventory management is a huge and expensive investment that requires huge costs. Through inventory optimization efforts to reduce inventory and reduce inventory costs, Even pursuing zero inventory is the center and ultimate goal of inventory management and logistics management. To optimize the inventory to a reasonable level, reduce the stock capital occupation, improve the operation efficiency and competitiveness of power supply enterprises. According to lean management theory, combined with the actual situation of storage management in power supply enterprises, this paper uses six Sigma data analysis method to define and measure the problems in warehouse material management. The main contents of this paper are as follows:. 1 three categories of materials: spare parts, materials to be distributed and items under construction are the main components of storage materials, which is the focus of analysis to reduce the inventory backlog, which is of great significance to the analysis of the current situation of storage materials. 2 analyzing the inventory characteristics of spare parts, and then determining the reasonable inventory calculation model of spare parts. (3) the method of defining and controlling abnormal material return is determined, and the control index and measure of abnormal material return are determined by radar chart analysis. (4) analyzing the stock structure of the materials under construction, determining the measures of reasonable utilization and disposal of the backlog, and realizing the optimal inventory of the goods under construction by increasing the turnover rate of the inventory.
【學(xué)位授予單位】:天津大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:F426.61;F274
【參考文獻(xiàn)】
相關(guān)期刊論文 前7條
1 孫一葦;;基于六西格瑪流程改進(jìn)的庫存管理優(yōu)化[J];物流科技;2007年07期
2 楊麗華;;基于六西格瑪管理的材料庫存優(yōu)化[J];物流科技;2010年07期
3 安健期;張紹文;;供應(yīng)鏈庫存管理中最優(yōu)化模型研究綜述[J];物流工程與管理;2010年09期
4 單丹;;高級(jí)數(shù)據(jù)挖掘技術(shù)在六西格瑪過程改進(jìn)中的運(yùn)用[J];統(tǒng)計(jì)與咨詢;2007年03期
5 吳治平;;六西格瑪在制造企業(yè)質(zhì)量控制中的應(yīng)用實(shí)證研究[J];現(xiàn)代商業(yè);2009年33期
6 田英;賈亞朝;卜文輝;;數(shù)據(jù)挖掘技術(shù)在六西格瑪管理中的應(yīng)用[J];新技術(shù)新工藝;2007年03期
7 蔣隆英;;鋼鐵企業(yè)成本管理模式研究[J];武漢冶金管理干部學(xué)院學(xué)報(bào);2012年02期
相關(guān)碩士學(xué)位論文 前8條
1 李彤彤;六西格瑪方法在丁草胺生產(chǎn)過程中質(zhì)量控制的應(yīng)用研究[D];天津大學(xué);2011年
2 張輝;六西格瑪方法在供應(yīng)物流過程中的應(yīng)用研究[D];上海交通大學(xué);2012年
3 陳經(jīng)偉;六西格瑪管理提升移動(dòng)通信行業(yè)數(shù)據(jù)業(yè)務(wù)水平方法研究[D];首都經(jīng)濟(jì)貿(mào)易大學(xué);2008年
4 秦緒霞;供應(yīng)鏈環(huán)境下造船企業(yè)的供應(yīng)商管理庫存研究[D];哈爾濱工業(yè)大學(xué);2007年
5 張正雷;特靈空調(diào)物料庫存控制策略研究[D];復(fù)旦大學(xué);2008年
6 陳進(jìn)春;索尼凱美高公司柔性動(dòng)態(tài)庫存管理研究[D];蘇州大學(xué);2008年
7 沈堅(jiān)斌;關(guān)于六西格瑪管理在YSL公司的應(yīng)用研究[D];復(fù)旦大學(xué);2008年
8 陳曉珊;基于庫存策略的供應(yīng)鏈管理[D];復(fù)旦大學(xué);2008年
本文編號(hào):1661724
本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/1661724.html