運(yùn)運(yùn)500kV線路工程經(jīng)濟(jì)效益及影響后評(píng)價(jià)研究
本文選題:輸變電工程 切入點(diǎn):經(jīng)濟(jì)效益后評(píng)價(jià) 出處:《華北電力大學(xué)》2013年碩士論文 論文類型:學(xué)位論文
【摘要】:本文通過全面總結(jié)借鑒國(guó)內(nèi)外后評(píng)價(jià)先進(jìn)的理論及方法,結(jié)合我國(guó)電網(wǎng)輸變電工程投資特點(diǎn)、國(guó)家和電力行業(yè)后評(píng)價(jià)的相關(guān)規(guī)定、辦法,應(yīng)用G1法、理想點(diǎn)法、熵權(quán)法和物元可拓等評(píng)價(jià)方法,構(gòu)建定性分析與定量分析相結(jié)合的輸變電工程經(jīng)濟(jì)效益及建設(shè)影響評(píng)價(jià)指標(biāo)體系和評(píng)價(jià)模型,并對(duì)運(yùn)城電廠-運(yùn)城500千伏線路工程進(jìn)行經(jīng)濟(jì)效益以及環(huán)境、社會(huì)、經(jīng)濟(jì)影響進(jìn)行了深入分析和綜合評(píng)價(jià),并提出了相關(guān)建議。 對(duì)于運(yùn)城電廠-運(yùn)城500千伏線路工程經(jīng)濟(jì)效益評(píng)價(jià),本文從兩個(gè)方面展開分析。第一是以運(yùn)城電廠-運(yùn)城500千伏線路工程建設(shè)及運(yùn)營(yíng)以來的相關(guān)數(shù)據(jù)為基礎(chǔ),通過預(yù)測(cè)、分析等手段對(duì)該工程進(jìn)行了財(cái)務(wù)后評(píng)價(jià)及國(guó)民經(jīng)濟(jì)后評(píng)價(jià);第二是結(jié)合G1法及理想點(diǎn)法,構(gòu)建運(yùn)城電廠-運(yùn)城500千伏線路工程經(jīng)濟(jì)效益評(píng)價(jià)指標(biāo)體系,對(duì)該工程進(jìn)行了經(jīng)濟(jì)效益后評(píng)價(jià)。 對(duì)于運(yùn)城電廠-運(yùn)城500千伏線路工程建設(shè)影響后評(píng)價(jià),本文從兩個(gè)方面展開分析。首先,通過本工程的實(shí)際及預(yù)測(cè)數(shù)據(jù),從環(huán)境影響、社會(huì)影響和經(jīng)濟(jì)影響三個(gè)大的方面對(duì)運(yùn)城電廠-運(yùn)城500千伏線路工程進(jìn)行建設(shè)影響定性和定量的分析;其次,本文通過結(jié)合熵權(quán)法和物元可拓模型,構(gòu)建了運(yùn)城電廠-運(yùn)城500千伏線路工程建設(shè)影響評(píng)價(jià)指標(biāo)體系,對(duì)該工程進(jìn)行了建設(shè)影響后評(píng)價(jià)。 通過對(duì)運(yùn)城電廠-運(yùn)城500千伏線路工程經(jīng)濟(jì)效益及建設(shè)影響后評(píng)價(jià)的全面分析,本文提出了相關(guān)的改進(jìn)建議及措施,為提高我國(guó)輸變電工程的管理水平、進(jìn)一步優(yōu)化輸變電工程后評(píng)價(jià)方法體系提供了一定的理論指導(dǎo)和實(shí)踐借鑒。
[Abstract]:This paper summarizes the advanced theories and methods of post-evaluation at home and abroad, combines the investment characteristics of power transmission and transformation projects in China, the relevant regulations and methods of post-evaluation in the country and the electric power industry, applies G1 method and ideal point method. Entropy weight method and matter-element extension evaluation method are used to construct the evaluation index system and evaluation model of economic benefit and construction impact of transmission and transformation engineering combined with qualitative analysis and quantitative analysis. The economic benefits, environmental, social and economic impacts of Yuncheng Power Plant-Yuncheng 500kV line project are analyzed and evaluated comprehensively, and some suggestions are put forward. For the economic benefit evaluation of Yuncheng Power Plant-Yuncheng 500kV Line Project, this paper analyzes it from two aspects. Firstly, based on the relevant data from the construction and operation of Yuncheng Power Plant -Yuncheng 500kV Line Project, this paper forecasts, The financial post evaluation and national economy post evaluation of the project are carried out by means of analysis and other means. Secondly, combining G1 method and ideal point method, the economic benefit evaluation index system of Yuncheng Power Plant-Yuncheng 500 kV Line Project is constructed. The economic benefit of the project is evaluated. For the post-evaluation of the construction impact of Yuncheng Power Plant-Yuncheng 500kV Line Project, this paper analyzes from two aspects. First, through the actual and predicted data of the project, from the environmental impact, The social impact and economic impact are analyzed qualitatively and quantitatively in the construction of Yuncheng Power Plant-Yuncheng 500kV Line Project. Secondly, this paper combines entropy weight method with matter-element extension model. The construction impact evaluation index system of Yuncheng Power Plant-Yuncheng 500 kV Line Project is constructed and the post-construction impact evaluation of the project is carried out. Based on the comprehensive analysis of the economic benefits and construction impact evaluation of Yuncheng Power Plant-Yuncheng 500 kV Line Project, this paper puts forward some relevant suggestions and measures to improve the management level of power transmission and transformation projects in China. Further optimizing the post-evaluation method system of transmission and transformation project provides some theoretical guidance and practical reference.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:F426.61;TM726.1
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 王志軒,孫衛(wèi)民;輸變電建設(shè)項(xiàng)目環(huán)境管理中若干問題的探討[J];電力環(huán)境保護(hù);2000年03期
2 黃保軍,史京楠;電網(wǎng)建設(shè)項(xiàng)目經(jīng)濟(jì)評(píng)價(jià)方法研究[J];電力建設(shè);2003年02期
3 方志林,韓林虎;10kV配網(wǎng)及低壓電網(wǎng)建設(shè)工程效益評(píng)估方法探討[J];電氣傳動(dòng)自動(dòng)化;2002年05期
4 龔建新;蔡金錠;;輸變電建設(shè)項(xiàng)目環(huán)境影響評(píng)價(jià)中部分問題的探討[J];福建電力與電工;2006年03期
5 李明高;李松炳;周超平;;大氣環(huán)境影響評(píng)價(jià)中污染氣象分析[J];環(huán)境科學(xué)與技術(shù);2009年02期
6 張虎成;魏浪;張習(xí)傳;;水利水電建設(shè)項(xiàng)目后評(píng)價(jià)研究現(xiàn)狀與發(fā)展趨勢(shì)[J];貴州水力發(fā)電;2007年05期
7 侯兵;安連鎖;;火電廠600MW機(jī)組可持續(xù)性后評(píng)價(jià)研究[J];華北電力技術(shù);2009年03期
8 李珊;孫薇;;安國(guó)市農(nóng)村電網(wǎng)建設(shè)與改造項(xiàng)目綜合評(píng)價(jià)[J];華東電力;2006年08期
9 董軍;蔣雪;;輸電項(xiàng)目評(píng)價(jià)研究現(xiàn)狀綜述[J];華東電力;2010年03期
10 黃德春,許長(zhǎng)新;投資項(xiàng)目后評(píng)價(jià)的現(xiàn)有理論及評(píng)析[J];河海大學(xué)學(xué)報(bào)(自然科學(xué)版);2003年06期
相關(guān)碩士學(xué)位論文 前10條
1 李向陽;電網(wǎng)建設(shè)項(xiàng)目經(jīng)濟(jì)評(píng)價(jià)方法與應(yīng)用研究[D];吉林大學(xué);2004年
2 楊柳;電網(wǎng)建設(shè)項(xiàng)目社會(huì)經(jīng)濟(jì)影響評(píng)價(jià)研究[D];華北電力大學(xué)(北京);2005年
3 程宏偉;輸變電工程項(xiàng)目后評(píng)價(jià)方法探索[D];鄭州大學(xué);2005年
4 李東偉;電網(wǎng)建設(shè)項(xiàng)目后評(píng)價(jià)理論研究及實(shí)證分析[D];華北電力大學(xué)(北京);2007年
5 董蕓;我國(guó)水電投資項(xiàng)目經(jīng)濟(jì)評(píng)價(jià)方法與實(shí)證研究[D];華中科技大學(xué);2006年
6 吳建國(guó);承德市區(qū)中低壓配電網(wǎng)規(guī)劃項(xiàng)目經(jīng)濟(jì)評(píng)價(jià)[D];華北電力大學(xué)(河北);2008年
7 齊金定;淶源220KV輸變電項(xiàng)目后評(píng)價(jià)研究[D];華北電力大學(xué)(河北);2008年
8 王國(guó)威;電網(wǎng)建設(shè)項(xiàng)目可持續(xù)發(fā)展后評(píng)價(jià)研究[D];華北電力大學(xué)(河北);2008年
9 褚曉杰;電網(wǎng)公司及其市場(chǎng)運(yùn)營(yíng)下技術(shù)經(jīng)濟(jì)的評(píng)價(jià)方法研究[D];長(zhǎng)沙理工大學(xué);2008年
10 張建明;輸變電工程項(xiàng)目經(jīng)濟(jì)效益后評(píng)價(jià)研究[D];華北電力大學(xué)(北京);2008年