國(guó)家重點(diǎn)實(shí)驗(yàn)室關(guān)于大型儀器設(shè)備采購(gòu)控制過程探討(英文)
發(fā)布時(shí)間:2023-02-20 18:33
近幾年,科研單位大型科研儀器設(shè)備的使用、管理與使用效益一直是科研單位管理研究的熱點(diǎn)問題。在設(shè)備經(jīng)費(fèi)預(yù)算范圍內(nèi),如何提高設(shè)備采購(gòu)性價(jià)比,如何最大化滿足科研需要的各項(xiàng)性能指標(biāo),需要每臺(tái)設(shè)備的購(gòu)置團(tuán)隊(duì)跟供應(yīng)商進(jìn)行一輪一輪的溝通、協(xié)調(diào)、談判。本文通過介紹國(guó)家重點(diǎn)實(shí)驗(yàn)室在進(jìn)口設(shè)備采購(gòu)及大型儀器管理方面的實(shí)踐經(jīng)驗(yàn),探索了科研單位大型科研進(jìn)口免稅設(shè)備的流程化管理,從政策、資金、技術(shù)等方面研究了保障和提高科研單位大型儀器的使用效益的制度與方法。
【文章頁(yè)數(shù)】:6 頁(yè)
【文章目錄】:
1. Introduction
2. Practice of process management of large-scale scientific research imported equipment
2.1. Preparation in advance
2.2. Critical work
2.2.1. Organization of manufacturers for comparison
2.2.2. Comparison of selected manufacturers
2.2.3. Investigation on the use of the equipment
2.2.4. Parallel comparison test
2.2.5. Determination of alternative manufacturers
2.2.6. Provision of tender parameters
2.2.7. Bid opening and evaluation cooperated with the school
2.3. Problems to be avoided in equipment procurement
2.3.1.Technical documents for equipment procurement projects are not prepared in place and are not standardized
2.3.2. Emphasis on the requirements for key technical parameters,and negligence on the requirements for acceptance,quality guarantee,etc.
3. Summary
本文編號(hào):3747100
【文章頁(yè)數(shù)】:6 頁(yè)
【文章目錄】:
1. Introduction
2. Practice of process management of large-scale scientific research imported equipment
2.1. Preparation in advance
2.2. Critical work
2.2.1. Organization of manufacturers for comparison
2.2.2. Comparison of selected manufacturers
2.2.3. Investigation on the use of the equipment
2.2.4. Parallel comparison test
2.2.5. Determination of alternative manufacturers
2.2.6. Provision of tender parameters
2.2.7. Bid opening and evaluation cooperated with the school
2.3. Problems to be avoided in equipment procurement
2.3.1.Technical documents for equipment procurement projects are not prepared in place and are not standardized
2.3.2. Emphasis on the requirements for key technical parameters,and negligence on the requirements for acceptance,quality guarantee,etc.
3. Summary
本文編號(hào):3747100
本文鏈接:http://sikaile.net/guanlilunwen/keyanlw/3747100.html
最近更新
教材專著