天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 管理論文 > 供應(yīng)鏈論文 >

面向供應(yīng)節(jié)點失效的供應(yīng)鏈應(yīng)急策略研究

發(fā)布時間:2019-01-07 19:43
【摘要】:針對突發(fā)事件導(dǎo)致的某供應(yīng)節(jié)點失效的三級供應(yīng)鏈應(yīng)急問題,提出了啟用備選供應(yīng)商、修復(fù)失效供應(yīng)商和重新優(yōu)化供應(yīng)計劃的綜合應(yīng)急策略;建立了基于客戶需求情景的多時段供應(yīng)中斷應(yīng)急計劃隨機模型,該模型考慮了缺貨懲罰成本、備選供應(yīng)商啟用成本與失效供應(yīng)商修復(fù)成本之間的平衡,通過突發(fā)事件后在不同時段的應(yīng)急策略方案選擇和供應(yīng)計劃再優(yōu)化實現(xiàn)供應(yīng)鏈期望運作成本最小。最后案例分析驗證了供應(yīng)中斷應(yīng)急計劃模型的有效性。
[Abstract]:Aiming at the emergency problem of three-level supply chain caused by the failure of a supply node caused by an emergency, a comprehensive emergency strategy is put forward to enable alternative suppliers, repair the failure suppliers and re-optimize the supply plan. A stochastic model of multi-time supply interruption contingency planning based on customer demand scenario is established. The model considers the penalty cost of shortage, the balance between the cost of commissioning and the repair cost of the failure supplier. The expected operation cost of supply chain is minimized through the selection of emergency strategy and the optimization of supply plan after emergency. Finally, the case study verifies the effectiveness of the supply interruption contingency planning model.
【作者單位】: 東北大學(xué)工商管理學(xué)院;
【基金】:國家自然科學(xué)基金資助項目(70702038,70801011,91024013) 中國博士后科學(xué)基金特別資助項目(200902544) 中央高;究蒲袠I(yè)務(wù)費資助項目(N100406013)
【分類號】:F274;F224

【相似文獻】

相關(guān)期刊論文 前10條

1 張根林;謝潔;;供應(yīng)中斷情況下的庫存控制模型研究[J];系統(tǒng)工程理論與實踐;2006年12期

2 安智宇;周晶;;供應(yīng)中斷風(fēng)險管理的機制設(shè)計[J];物流技術(shù);2009年05期

3 ;2007年1月土地市場分析[J];北京房地產(chǎn);2007年03期

4 習(xí)文靜;;石油儲備模型研究[J];工業(yè)技術(shù)經(jīng)濟;2008年12期

5 楊亞t,

本文編號:2404070


資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/guanlilunwen/gongyinglianguanli/2404070.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶1c78e***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com