Z公司二期生產(chǎn)車間設(shè)施布局設(shè)計(jì)
[Abstract]:Rational layout of production workshop facilities is one of the important factors to reduce production cost, improve production efficiency and enhance product competitiveness. At present, there are many researches on the layout of large manufacturing facilities at home and abroad, and many scholars apply some heuristic algorithms to this field. In this paper, combining the system layout technology (SLP) and genetic algorithm (GA), taking Z Company as the main research object, this paper provides the design scheme for the layout of the second phase production workshop facility of Z Company. The main contents of this paper are as follows: firstly, through the theoretical analysis of the present situation of workshop facility layout at home and abroad, the research direction of this paper is clear. The basic theoretical knowledge of workshop facility layout is studied first, then the advantages and disadvantages of (SLP) are analyzed in detail, and the application of mathematical model and genetic algorithm of workshop facility layout in workshop facility layout is analyzed. Make clear the research method of the paper. Secondly, the production organization of Z Company is analyzed, including process flow, man-hour quota, equipment requirement and so on, and the original elements of (SLP) workshop layout are obtained. According to the original elements, the logistics relationship of the job unit is analyzed, and the mathematical model is established under the condition of actual constraints. The optimal layout scheme is calculated by taking the total cost of the material flow among the operation units as the objective function. Thirdly, the proposed scheme is adjusted by the comprehensive relationship between the operation units calculated by the SLP method, and the optimal layout scheme of workshop facilities is selected by the point evaluation method in accordance with the actual situation of Z Company. Finally, aiming at the second phase production workshop of Z Company, the design scheme of material handling and the layout scheme of operation unit are put forward, and the 6S field management system is established.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TB491
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 賈曉軍;制定工時(shí)定額的幾種方法[J];工廠管理;1997年11期
2 劉啟芳;周剛;;設(shè)施布置理論的應(yīng)用[J];工程機(jī)械;2006年02期
3 李志華;曾海紅;陳立平;趙文禮;;多單元制造系統(tǒng)布局設(shè)計(jì)[J];工程設(shè)計(jì)學(xué)報(bào);2007年03期
4 張畢西,周艷,劉鑫;離散生產(chǎn)系統(tǒng)車間設(shè)施布置優(yōu)化[J];工業(yè)工程;2004年02期
5 張亞南;闞樹林;王越;;用蟻群算法解決動(dòng)態(tài)設(shè)施布置問題[J];工業(yè)工程;2007年02期
6 李志華,鐘毅芳,劉繼紅;制造系統(tǒng)中的單向環(huán)型設(shè)備布局設(shè)計(jì)[J];計(jì)算機(jī)輔助設(shè)計(jì)與圖形學(xué)學(xué)報(bào);2003年07期
7 張泳;趙建民;朱信忠;徐慧英;;基于SLP方法的遺傳算法在多目標(biāo)布置設(shè)計(jì)中的應(yīng)用[J];計(jì)算機(jī)時(shí)代;2010年05期
8 姚冠新,劉正剛;設(shè)施布置問題的非線性目標(biāo)規(guī)劃模型及其遺傳算法[J];江蘇理工大學(xué)學(xué)報(bào)(社會(huì)科學(xué)版);2001年02期
9 王曰輝;高媛;畢啟亮;游思;;物料單元化管理在重型機(jī)械制造車間的應(yīng)用[J];機(jī)械工程師;2009年11期
10 羅宜美,林強(qiáng),周剛,龐國勝;基于當(dāng)量物流量的設(shè)備系統(tǒng)平面布置設(shè)計(jì)研究[J];機(jī)械設(shè)計(jì);2000年11期
,本文編號:2410793
本文鏈接:http://sikaile.net/guanlilunwen/gongchengguanli/2410793.html