泥石流次聲監(jiān)測(cè)預(yù)警系統(tǒng)設(shè)計(jì)
本文選題:泥石流 切入點(diǎn):次聲監(jiān)測(cè) 出處:《中國(guó)地質(zhì)大學(xué)(北京)》2017年碩士論文 論文類型:學(xué)位論文
【摘要】:泥石流是一種山區(qū)突發(fā)性的自然侵蝕過程,具有流速快、流量大、物質(zhì)容量大、破壞力強(qiáng)等特點(diǎn)。近年來,泥石流災(zāi)害在世界各地頻發(fā),造成了重大的人員傷亡與經(jīng)濟(jì)損失。我國(guó)也是泥石流頻發(fā)國(guó)家之一,較為嚴(yán)重的區(qū)域分布在西南多個(gè)省份,地殼活動(dòng)劇烈,地勢(shì)走向陡峻,地質(zhì)結(jié)構(gòu)復(fù)雜,土體支離破碎,再加上西南地區(qū)的降水量和降水強(qiáng)度較大,泥石流發(fā)育強(qiáng)烈,直接威脅到該地區(qū)人民群眾的生命財(cái)產(chǎn)安全,因此,如何對(duì)泥石流進(jìn)行有效的監(jiān)測(cè)成為預(yù)防泥石流災(zāi)害、降低災(zāi)害損失的研究重點(diǎn)。目前世界多國(guó)的專家學(xué)者都在關(guān)注研究泥石流災(zāi)害預(yù)警技術(shù),并取得了不少的成果,但也普遍存在一些問題導(dǎo)致推廣性較差,如系統(tǒng)造價(jià)昂貴、維護(hù)成本高、誤報(bào)率高等。本文提出了一種成本較低、采用優(yōu)良信號(hào)處理算法的泥石流次聲監(jiān)控系統(tǒng)來實(shí)現(xiàn)對(duì)泥石流災(zāi)害的監(jiān)測(cè)預(yù)報(bào)。本文詳細(xì)的介紹了一種基于泥石流次聲信號(hào)進(jìn)行泥石流災(zāi)害預(yù)警的設(shè)計(jì)方案,該系統(tǒng)設(shè)計(jì)包括嵌入式軟硬件系統(tǒng)設(shè)計(jì)、算法設(shè)計(jì)、上位機(jī)設(shè)計(jì)。其中嵌入式軟硬件系統(tǒng)使用專業(yè)的次聲傳感器完成信號(hào)的捕捉并轉(zhuǎn)換為對(duì)應(yīng)的模擬電信號(hào),該電信號(hào)經(jīng)過模擬電路部分轉(zhuǎn)換、放大、濾波之后通過AD采集得到對(duì)應(yīng)的數(shù)字信號(hào)數(shù)組。得到的數(shù)據(jù)經(jīng)過希爾伯特黃變換之后得到原始信號(hào)的邊際譜,通過對(duì)邊際譜進(jìn)行分析可以判斷有無泥石流次聲信號(hào)產(chǎn)生,以此實(shí)現(xiàn)對(duì)泥石流災(zāi)害的災(zāi)前預(yù)警�?梢詫⑦呺H譜數(shù)據(jù)通過串行通信方式傳輸給上位機(jī),實(shí)現(xiàn)在上位機(jī)軟件中實(shí)時(shí)顯示采集信號(hào)的邊際譜。本系統(tǒng)中采用了性能較強(qiáng)的基于Cortex-M7內(nèi)核的芯片STM32F746作為主控芯片,且移植了實(shí)時(shí)性較強(qiáng)的UCOS-III操作系統(tǒng),實(shí)現(xiàn)了數(shù)據(jù)采集、存儲(chǔ)、運(yùn)算、上傳等多任務(wù)協(xié)作。經(jīng)過模擬仿真與實(shí)驗(yàn)驗(yàn)證,本泥石流監(jiān)測(cè)系統(tǒng)各方面達(dá)到了設(shè)計(jì)要求,具有一定的實(shí)用價(jià)值和推廣性。
[Abstract]:Debris flow is a sudden natural erosion process in mountainous areas, with the characteristics of fast velocity, large discharge, large material capacity and strong destructive power. In recent years, debris flow disasters occur frequently all over the world. China is also one of the countries where debris flows occur frequently. The more serious areas are distributed in many provinces in southwest China. The crustal activities are intense, the topography is steep, the geological structure is complex, and the soil mass is fragmented. In addition, the precipitation and precipitation intensity in the southwest area is large, and the debris flow develops strongly, which directly threatens the life and property safety of the people in this area. Therefore, how to effectively monitor the debris flow becomes the prevention of the debris flow disaster. At present, experts and scholars from many countries all over the world are paying close attention to the early warning technology of debris flow disasters, and have achieved a lot of results. However, there are also some common problems that lead to poor popularization, such as the high cost of the system. The maintenance cost is high, the false alarm rate is high. This paper introduces a design scheme of debris flow infrasound warning based on infrasound signal of debris flow, which is based on fine signal processing algorithm to realize the monitoring and forecasting of debris flow infrasound. The system design includes embedded hardware and software system design, algorithm design, host computer design, in which the embedded hardware and software system uses professional infrasound sensor to capture the signal and convert it into the corresponding analog signal. The signal is partially converted by analog circuit, amplified, filtered, and then collected by AD to get the corresponding digital signal array. After Hilbert-Huang transform, the obtained data can obtain the marginal spectrum of the original signal. By analyzing the marginal spectrum, we can judge whether the infrasound signal of debris flow is produced, so as to realize the pre-disaster early warning of debris flow disaster. The marginal spectrum data can be transmitted to the upper computer by serial communication. In this system, the high performance chip STM32F746 based on Cortex-M7 kernel is used as the main control chip, and the real time UCOS-III operating system is transplanted to realize the data acquisition and storage. Through simulation and experimental verification, the debris flow monitoring system has met the design requirements and has certain practical value and popularization.
【學(xué)位授予單位】:中國(guó)地質(zhì)大學(xué)(北京)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:P642.23
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 ;泥石流[J];中國(guó)地理科學(xué)文摘;2001年02期
2 劉希林;國(guó)外泥石流機(jī)理模型綜述[J];災(zāi)害學(xué);2002年04期
3 王麗;劉岳東;;應(yīng)用粒子圖像流速測(cè)定法解析泥石流運(yùn)動(dòng)形態(tài)[J];水土保持應(yīng)用技術(shù);2006年02期
4 余斌;;無水滑的水下泥石流運(yùn)動(dòng)速度的實(shí)驗(yàn)研究[J];水科學(xué)進(jìn)展;2007年05期
5 馬鵬里;蒲金涌;辛吉武;;甘肅省長(zhǎng)江流域大(暴)雨引發(fā)泥石流危險(xiǎn)程度評(píng)價(jià)[J];水土保持通報(bào);2007年05期
6 樊峗峗;王思敬;王恩志;劉曉麗;;泥石流沿程侵蝕動(dòng)力過程模擬分析[J];巖石力學(xué)與工程學(xué)報(bào);2010年S2期
7 邸雪穎;陶玉柱;;火后泥石流研究進(jìn)展[J];應(yīng)用生態(tài)學(xué)報(bào);2013年08期
8 胡平華;超聲波儀在泥石流泥位測(cè)試中的應(yīng)用[J];山地研究;1987年04期
9 Б.С.Степанов ,孟河清;泥石流特征值的計(jì)算問題[J];力學(xué)進(jìn)展;1987年04期
10 C.R.赫普;劉希林;;加利福尼亞夏斯塔山區(qū)泥石流頻率和規(guī)模的樹木形態(tài)證據(jù)[J];地理譯報(bào);1987年02期
相關(guān)會(huì)議論文 前5條
1 馬鵬里;蒲金涌;辛吉武;;甘肅長(zhǎng)江流域大(暴)雨引發(fā)泥石流危險(xiǎn)程度評(píng)價(jià)[A];第26屆中國(guó)氣象學(xué)會(huì)年會(huì)災(zāi)害天氣事件的預(yù)警、預(yù)報(bào)及防災(zāi)減災(zāi)分會(huì)場(chǎng)論文集[C];2009年
2 陳建平;張欽喜;吳關(guān)今;;1991年北京泥石流的發(fā)育規(guī)模與形成[A];第四屆全國(guó)工程地質(zhì)大會(huì)論文選集(一)[C];1992年
3 張萬順;趙琰鑫;崔鵬;彭虹;王艷;陳雪嬌;;溝道二維泥石流運(yùn)動(dòng)和沖淤數(shù)值模型研究[A];第八屆海峽兩岸山地災(zāi)害與環(huán)境保育學(xué)術(shù)研討會(huì)論文集[C];2011年
4 陳龍偉;;泥石流三維數(shù)值模擬的一種離散元方法[A];中國(guó)幾何設(shè)計(jì)與計(jì)算新進(jìn)展2007——第三屆中國(guó)幾何設(shè)計(jì)與計(jì)算大會(huì)論文集[C];2007年
5 崔鵬;王道杰;莊建琦;;泥石流扇形地土地整治與利用[A];四川省水土保持學(xué)會(huì)第四屆會(huì)員代表大會(huì)暨學(xué)術(shù)交流會(huì)論文集[C];2007年
相關(guān)重要報(bào)紙文章 前7條
1 記者 張賓 通訊員 范沈強(qiáng);我省一項(xiàng)交通科研項(xiàng)目通過鑒定[N];甘肅經(jīng)濟(jì)日?qǐng)?bào);2006年
2 王海;城鎮(zhèn)泥石流減災(zāi)決策支持系統(tǒng)研制成功[N];今日信息報(bào);2005年
3 ;建言:謀劃災(zāi)害防御策略[N];中國(guó)水利報(bào);2012年
4 本報(bào)記者 唐平 張恩榮 韓清華;被吞沒的村莊:天災(zāi)還是人禍?[N];中國(guó)經(jīng)濟(jì)時(shí)報(bào);2006年
5 江毅 田剛 楊三軍 歐陽(yáng)杰;與死神賽跑的接力棒斷在哪里[N];中國(guó)礦業(yè)報(bào);2003年
6 新華社記者 江毅 田剛 楊三軍;與死神賽跑的接力棒,斷在哪里[N];新華每日電訊;2003年
7 本報(bào)記者 趙凡 周飛飛;山穩(wěn)水暢 我們才安全[N];地質(zhì)勘查導(dǎo)報(bào);2010年
相關(guān)碩士學(xué)位論文 前5條
1 向國(guó)萍;潰決型泥石流起動(dòng)模型與放大效應(yīng)研究[D];成都理工大學(xué);2015年
2 吳永卿;尾礦庫(kù)潰壩泥石流演進(jìn)規(guī)律模型試驗(yàn)研究[D];石家莊鐵道大學(xué);2015年
3 周繼發(fā);泥石流次聲監(jiān)測(cè)軟硬件系統(tǒng)[D];中國(guó)地質(zhì)大學(xué)(北京);2016年
4 魏高榮;泥石流次聲監(jiān)測(cè)預(yù)警系統(tǒng)設(shè)計(jì)[D];中國(guó)地質(zhì)大學(xué)(北京);2017年
5 王勇智;固液兩相泥石流運(yùn)動(dòng)計(jì)算力學(xué)[D];重慶交通大學(xué);2008年
,本文編號(hào):1603026
本文鏈接:http://sikaile.net/guanlilunwen/gongchengguanli/1603026.html