裝配式框架—剪力墻結構形式和拼裝技術研究
[Abstract]:In recent years, because of its high efficiency, high quality, low resource consumption and low environmental impact, the industrial production mode of housing has remarkable economic and social benefits. It is the development trend of housing construction at present. Therefore, the state attaches great importance to the development of housing industrialization, and its rapid development leads to the adjustment and upgrading of the national economic structure and becomes an important pillar industry of the national economy. At present, the existing technology of domestic assembled concrete structure is limited to pure frame structure and pure shear wall structure, which is composed of prefabricated columns and prefabricated walls. The research and engineering practice of prefabricated concrete frame shear wall structure composed of prefabricated joints and prefabricated beams are still in blank state. Due to earthquake resistance, the height of the assembled frame structure is limited, which does not meet the requirement of high utilization rate of land in the existing market. The assembled shear wall structure is limited to the construction of some commercial buildings, low-rent houses and comfortable housing because of the large number of projects at the joints, the complicated connection technology, and the limitation of the use space and span. But the assembled frame shear wall structure has some shear walls arranged in the frame structure, which has high lateral stiffness, high applicable height of the building, flexible and free use space at the same time, so it can meet the needs of office buildings and shopping malls. Different building functions, such as residential buildings, have a wide range of development space, and will be the future development direction of assembled concrete structures. This paper starts with the selection of split system of assembled frame shear wall structure, puts forward several split schemes, makes a comparative analysis of economic and technical indexes, and determines the optimal scheme to be studied in this paper. Taking the graduate apartment building project of Shenyang University of Architecture as a pilot project, an integrated application is carried out from split design of prefabricated components, production to field assembly, in which: in the design stage, the split drawing of prefabricated components is deeply designed. The design method of split design drawing is explored and summarized in order to make it suitable for industrial production of prefabrication plant. In the prefabrication stage, several key technologies are solved, and the fabrication process of all kinds of prefabricated components is explored, and some suggestions for precision control in the prefabrication process are put forward. In the stage of field assembly, the pre-fabricated components are placed in place and adjusted, and the assembly sequence and method suitable for the split system are summarized. Through the practical application of the pilot project and the further improvement and perfection, a kind of split design method and assembly technology of the assembled frame shear wall structure suitable for prefabrication and assembly is finally obtained. The split design method of frame shear wall structure and its assembling technology have the advantages of reasonable structure, equal cast-in-place principle, suitable for industrial production and construction, and can be used as reference for the design and construction of similar structures. Due to the limited personal energy, the overall seismic performance of prefabricated members has not been tested and studied in this paper. Under the condition of composite force and the dynamic performance, further research is needed.
【學位授予單位】:沈陽建筑大學
【學位級別】:碩士
【學位授予年份】:2014
【分類號】:TU398.2
【相似文獻】
相關期刊論文 前10條
1 任志科;鄒書忠;;剪力墻結構圖紙范本的改進建議[J];河南科技;2008年11期
2 張旭;;框架-剪力墻結構中剪力墻的設計[J];中小企業(yè)管理與科技(上旬刊);2012年05期
3 周青島;;剪力墻結構工程施工方法的研究[J];中華民居(下旬刊);2012年12期
4 諸葛瑞清;;框架-剪力墻結構剪力墻數(shù)量的確定[J];建筑技術;1980年03期
5 王全鳳;剪力墻基礎轉動對剪力墻最優(yōu)剛度的影響[J];建筑科學;1986年04期
6 孫巨平,孫鴻飛,滿衛(wèi)東;框架剪力墻計算中的剪力調整[J];黑龍江水專學報;1999年01期
7 王全鳳;剪力墻最優(yōu)剛度及其計算機實現(xiàn)[J];華僑大學學報(自然科學版);1999年03期
8 李喜慶;;對房屋剪力墻結構設計問題的思考[J];門窗;2014年01期
9 姜玉柱;;剪力墻結構洞的處理方案探討[J];四川建材;2014年01期
10 胡文發(fā),朱伯龍,黃鼎業(yè);受損剪力墻的非線性分析[J];四川建筑科學研究;2000年02期
相關會議論文 前10條
1 任金山;胡連新;;剪力墻結構的設計與合理布置[A];河南省土木建筑學會2009年學術大會論文集[C];2009年
2 初明進;馮鵬;葉列平;;自適應分縫剪力墻破壞模式研究[A];第20屆全國結構工程學術會議論文集(第Ⅰ冊)[C];2011年
3 滕軍;呂海霞;李祚華;;平面不規(guī)則剪力墻結構大震變形及耗能反應分析[A];第八屆全國地震工程學術會議論文集(Ⅰ)[C];2010年
4 沈蒲生;劉楊;孟煥陵;;地震作用下框支剪力墻結構中落地剪力墻的合理數(shù)量[A];防震減災工程研究與進展——全國首屆防震減災工程學術研討會論文集[C];2004年
5 劉成華;;剪力墻裂縫的綜合分析[A];第四屆全國建筑結構技術交流會論文集(上)[C];2013年
6 劉昌軍;李海洲;;淺談建筑結構中剪力墻的布置[A];第三屆全國建筑結構技術交流會論文集[C];2011年
7 李煥成;;關于高層建筑剪力墻結構設計的探討[A];2014年4月建筑科技與管理學術交流會論文集[C];2014年
8 呂西林;張佑啟;關國雄;;剪力墻結構抗震耗能研究[A];第三屆全國結構工程學術會議論文集(下)[C];1994年
9 劉元珍;李珠;楊卓強;;不同參數(shù)帶縫剪力墻非線性分析[A];第17屆全國結構工程學術會議論文集(第Ⅱ冊)[C];2008年
10 朱砂;江見鯨;;計算形函數(shù)有限條在剪力墻分析中的應用[A];第五屆全國結構工程學術會議論文集(第三卷)[C];1996年
相關重要報紙文章 前4條
1 王敏 王麗 王瑞斌;剪力墻專利現(xiàn)狀研究[N];中國知識產權報;2013年
2 山東誠祥建安集團有限公司 張養(yǎng)亮;高層住宅結構體系的選擇[N];中華建筑報;2010年
3 ;在剪力墻允許偏差內節(jié)約資源[N];建筑時報;2007年
4 徐雯燁 張殿敏 本報記者 彭溢;院士“進駐”企業(yè) 搭起登高“天梯”[N];黑龍江日報;2012年
相關博士學位論文 前10條
1 孫建;新型全預制裝配式剪力墻結構抗震性能研究[D];東南大學;2016年
2 湯磊;預制裝配混凝土剪力墻結構新型混合裝配技術研究[D];東南大學;2016年
3 方德平;剪力墻中斷的高層框—剪結構抗震性能分析與工程應用[D];華僑大學;2007年
4 連星;疊合板式剪力墻的抗震性能試驗分析及理論研究[D];合肥工業(yè)大學;2010年
5 陳學偉;剪力墻結構構件變形指標的研究及計算平臺開發(fā)[D];華南理工大學;2011年
6 辛力;高性能混凝土剪力墻直接基于位移的抗震設計方法研究[D];西安建筑科技大學;2009年
7 葉艷霞;框支分區(qū)剪力墻結構抗震性能及空間精細分析和簡化分析方法研究[D];西安建筑科技大學;2003年
8 勞曉春;RC矩形截面剪力墻構件的抗震性能及其性能指標限值研究[D];華南理工大學;2010年
9 章紅梅;剪力墻結構基于性態(tài)的抗震設計方法研究[D];同濟大學;2007年
10 鄧明科;高性能混凝土剪力墻基于性能的抗震設計理論與試驗研究[D];西安建筑科技大學;2006年
相關碩士學位論文 前10條
1 蔡婷;高層框支剪力墻結構中落地剪力墻合理數(shù)量的研究[D];西安建筑科技大學;2010年
2 郭嘉欣;高層住宅剪力墻結構的結構優(yōu)化布置及其抗震性能分析[D];華南理工大學;2015年
3 楊萬;基于材料應變的L形RC剪力墻變形指標限值研究[D];華南理工大學;2015年
4 宋亞敏;剪力墻抗震性能數(shù)值模擬研究[D];山東建筑大學;2015年
5 馬延聰;新型裝配式空心板—框架剪力墻混合結構抗震性能研究[D];西安建筑科技大學;2015年
6 王昭;高層住宅剪力墻結構優(yōu)化設計研究[D];中國地質大學(北京);2015年
7 黃艷;HPFL加固既有RC剪力墻結構抗震性能試驗研究與理論分析[D];湖南工業(yè)大學;2015年
8 宋春玲;HR-EPS模塊復合保溫剪力墻豎向承載能力試驗研究[D];青島理工大學;2015年
9 袁雄;高層混凝土住宅不同結構體系性能的優(yōu)化分析[D];南昌大學;2015年
10 馮少飛;高層框架—剪力墻結構的抗震性能優(yōu)化分析[D];西安工業(yè)大學;2015年
,本文編號:2440719
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/2440719.html