商業(yè)綜合體電梯安裝工程項目管理流程改善研究
[Abstract]:With the widespread rise of commercial complex projects, how to efficiently complete elevator installation in such projects has been paid more and more attention by elevator companies. The management process plays a fundamental role in the installation project. By studying the experience and lessons of the commercial complex elevator project in the past, this paper finds that the clear degree of the flow chart is the key to the success of the project. Therefore, the purpose of this paper is to summarize the process involved in the construction of commercial complex elevator, and to improve the installation process of commercial complex elevator in combination with the actual situation on the spot. In order to provide reference for other commercial complex elevator projects, it is of great significance to improve the installation process of commercial complex elevator. In this paper, the management flow in the installation process of commercial complex elevator is taken as the research object. Aiming at the difficulties and common problems in the installation process, this paper analyzes the main process problems and causes, and looks for the improvement links so as to realize the improvement of the process. This paper uses management methods including Gantt chart, critical path method, inventory management, on-site 6S, Kanban method and supply chain management. The content is mainly built around the key path of the commercial complex elevator installation process. Improvement of site management and handling of common problems are carried out in several aspects. In a word, the improvement of the project management process of the commercial complex elevator installation project is a long-term and continuous work. With the development of the elevator technology and the rapid change of the external requirements, the project management process of the elevator installation project will also keep pace with the times. However, as long as we grasp the basic management process and cooperate with the advanced management concept, combined with the actual situation on the spot, we will eventually provide customers with high quality commercial complex elevator.
【學位授予單位】:天津大學
【學位級別】:碩士
【學位授予年份】:2014
【分類號】:TU857;TU712
【相似文獻】
相關期刊論文 前10條
1 郭松保;電梯安裝三字經(jīng)[J];現(xiàn)代城市研究;2003年S1期
2 蔡永忠;;淺談電梯安裝工程的質(zhì)量控制[J];科協(xié)論壇(下半月);2008年04期
3 詹克讓;;電梯安裝質(zhì)量問題的探討[J];企業(yè)標準化;2008年17期
4 胡柱強;;電梯安裝檢測質(zhì)量安全分析[J];廣東科技;2009年18期
5 蔣屹;;電梯安裝工程項目管理工作研究[J];裝備制造技術(shù);2010年10期
6 馬子良;;電梯安裝檢驗中應注意的幾個問題[J];民營科技;2012年01期
7 李興;;電梯安裝檢驗中若干問題探討[J];科技風;2014年01期
8 鄧生材;;淺議電梯安裝工程項目管理工作[J];科技致富向?qū)?2010年18期
9 劉向勇;;淺談電梯安裝工的培養(yǎng)[J];現(xiàn)代企業(yè)教育;2010年14期
10 劉建榮;監(jiān)理對電梯安裝工程的質(zhì)量控制[J];工程建設與設計;2000年05期
相關會議論文 前1條
1 楊慧鋒;;電梯安裝工程實踐[A];土木建筑學術(shù)文庫(第11卷)[C];2009年
相關重要報紙文章 前10條
1 史玉成;北京電梯安裝養(yǎng)護要實行新標準[N];中國質(zhì)量報;2007年
2 本報記者 韓慶文 通訊員 史劍 于璐;五項流程缺一不可[N];廣東建設報;2009年
3 ;搶占“制高點”[N];建筑時報;2009年
4 田夫 志敏 志洪 小波;能者為師上講臺[N];常州日報;2010年
5 于曉穎;電梯安裝國家職業(yè)標準在京試行[N];中國建材報;2011年
6 本報記者 洪敬譜;兩部電梯安裝4年不能正常使用[N];中國消費者報;2011年
7 記者 曹飛;我市給電梯安裝維保立規(guī)矩[N];大同日報;2012年
8 竇新東 秦澤克;電梯安裝 我行我秀[N];中國建設報;2006年
9 林子;安裝:地位江河日下[N];中國房地產(chǎn)報;2012年
10 張玲邋紅梅;安全狀況量化體現(xiàn) 責任意識細節(jié)入手[N];中國質(zhì)量報;2008年
相關碩士學位論文 前8條
1 鄭昆明;基于全生命周期的電梯安裝項目風險評估機制研究[D];山東大學;2011年
2 金勇;基于過程控制的電梯安裝質(zhì)量管理研究[D];電子科技大學;2008年
3 張震東;網(wǎng)絡計劃技術(shù)在電梯安裝項目中的應用[D];上海交通大學;2009年
4 顏世君;項目質(zhì)量管理在電梯安裝項目中的應用[D];天津大學;2011年
5 毛瑋;基于風險的西塔項目電梯安裝工程安全管理研究[D];華南理工大學;2011年
6 徐浩菁;電梯安裝及維修保養(yǎng)成本控制研究[D];浙江大學;2013年
7 項威;商業(yè)綜合體電梯安裝工程項目管理流程改善研究[D];天津大學;2014年
8 王雨婷;基于Unity3D的電梯安裝仿真互動系統(tǒng)的設計與實現(xiàn)[D];東北大學;2014年
本文編號:2350748
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/2350748.html