建設(shè)項(xiàng)目方案設(shè)計(jì)階段投資控制研究
[Abstract]:With the rapid development of our country's economy, the investment of construction projects is increasing day by day. It is more important to strengthen the control of project investment, especially the control of investment budget in the project design phase. The main problem of the investment control in the design phase is the insufficient selection of the design scheme. The construction unit does not pay enough attention to the investment control in the design stage, the designer's investment control consciousness is not strong, the related rules and regulations are not perfect, etc. In this paper, the deficiency of investment control in the design stage of domestic and foreign construction projects, the methods adopted and the course of development are summarized synthetically, and the value engineering is emphasized. The application of quota design and expectation index theory in investment control in design stage and their respective problems. The contents of investment control in the design stage of construction project are discussed, including paying attention to the market investigation in the early stage, carefully compiling the project design task, selecting the design unit, paying attention to the management of the design contract, and selecting and optimizing the scheme design. In this paper, the optimal model of scheme selection and the optimization model of value engineering based on the principle of quota design are established, and how to select the design scheme and control the investment of the project are discussed theoretically. The design scheme comparison is to adopt the selection model considering the expectation index, add the owner's expectation index into the scheme index selection system, and select the design scheme which accords with the owner's expectation and has the least investment at the same time. The control project investment is based on the quota design, the value engineering theory establishes the optimization model of the scheme, and on the premise of ensuring the function of the construction project, the third party professional unit is introduced to further optimize the selected scheme. In order to achieve the final requirements.
【學(xué)位授予單位】:中南林業(yè)科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TU201.7;F283
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 姚傳勤;;從限額設(shè)計(jì)談投資控制[J];安徽建筑;2006年03期
2 王浩;;基于LCC限額設(shè)計(jì)的工程項(xiàng)目成本優(yōu)化[J];重慶科技學(xué)院學(xué)報(bào)(自然科學(xué)版);2008年02期
3 劉微明,王孟鈞;建設(shè)項(xiàng)目投資控制難點(diǎn)及對(duì)策[J];長(zhǎng)沙鐵道學(xué)院學(xué)報(bào)(社會(huì)科學(xué)版);2005年01期
4 謝新喜;姚彩平;;限額設(shè)計(jì)在建筑工程設(shè)計(jì)階段的應(yīng)用分析[J];當(dāng)代經(jīng)濟(jì);2011年08期
5 劉秋霞;翟曉煒;;淺談設(shè)計(jì)與實(shí)施階段的造價(jià)控制[J];公路;2010年08期
6 吳清烈,徐南榮;含整變量多目標(biāo)決策基于目標(biāo)期望水平的交互式方法[J];管理工程學(xué)報(bào);1997年01期
7 徐皓;樊治平;劉洋;伊偉;;一種考慮指標(biāo)期望的產(chǎn)品設(shè)計(jì)方案選擇方法[J];工業(yè)工程與管理;2010年01期
8 唐祥忠;王文靜;;建設(shè)項(xiàng)目全生命周期工程造價(jià)管理價(jià)值工程的實(shí)施[J];經(jīng)濟(jì)師;2006年01期
9 吳諍;;價(jià)值工程在設(shè)計(jì)階段的運(yùn)用[J];江蘇建筑;2007年S1期
10 劉華;;淺談建設(shè)工程設(shè)計(jì)階段的投資控制[J];價(jià)值工程;2012年19期
,本文編號(hào):2331212
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/2331212.html