基于Unity3D的電梯安裝仿真互動(dòng)系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)
[Abstract]:In recent years, with the development of economy, the number of elevators has increased rapidly. The traditional elevator installation teaching mode can not meet the requirements of installation personnel to carry out practical operation on the spot, and the teaching quality is low. Because of the high requirement of the site, equipment and teachers in the actual operation, using Unity3D technology to set up an interactive environment of elevator installation can make the installers simulate the installation of elevators in the network environment. To achieve the goal of efficient teaching. This paper introduces the development process of the elevator installation simulation interactive system based on the standard elevator installation business requirement of the machine room. The design and implementation of the simulation interactive system is based on Unity3D technology, including three parts: the interactive platform of network information management page and the process configuration tool of elevator installation process. Network information management page provides users with personal information and curriculum information management network platform. Unity3D simulation interactive platform is implemented on the Web page, providing users with graphical operation interface. To meet the needs of the user for elevator installation practice. The process configuration tool provides a visual platform for the process engineer to configure the elevator installation process, through which the process engineer can configure the elevator installation process into the system for the students to learn. The simulation interactive system is developed on the platform of MySql database MonoDevelop and Microsoft Visual Studio 2010 using C # language. Meet the standard installation requirements of straight ladder with machine room. This paper first introduces the background of the subject and the research status of Unity3D technology. Then it introduces the related technologies that need to be used in the design and implementation of the elevator installation simulation interactive system, and analyzes the business requirements of the system in detail. Then the overall architecture of the simulation interactive system is introduced, and the design of each module and its functions are analyzed. In the realization of the system, according to the division of the system modules, the detailed implementation of each module and components in the Unity3D simulation interactive platform and the process configuration tool for elevator installation process is explained in detail. Then the test method of the interactive simulation system is described, and the test results are explained. Finally, the work of this paper is summarized, and the future work and development direction of the system are prospected.
【學(xué)位授予單位】:東北大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TU857
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 郭松保;電梯安裝三字經(jīng)[J];現(xiàn)代城市研究;2003年S1期
2 張文碩;;淺談關(guān)于電梯安裝事故的法定管轄權(quán)[J];建筑安全;2007年10期
3 白根亮;;淺談電梯安裝項(xiàng)目全過程管理[J];廣西輕工業(yè);2008年06期
4 蔡永忠;;淺談電梯安裝工程的質(zhì)量控制[J];科協(xié)論壇(下半月);2008年04期
5 詹克讓;;電梯安裝質(zhì)量問題的探討[J];企業(yè)標(biāo)準(zhǔn)化;2008年17期
6 張宇;;監(jiān)理在施工中如何做好電梯安裝的配合工作[J];工程建設(shè)與設(shè)計(jì);2009年07期
7 胡柱強(qiáng);;電梯安裝檢測質(zhì)量安全分析[J];廣東科技;2009年18期
8 王慷;;淺談監(jiān)理對電梯安裝的質(zhì)量控制[J];科技資訊;2010年16期
9 蔣屹;;電梯安裝工程項(xiàng)目管理工作研究[J];裝備制造技術(shù);2010年10期
10 馬子良;;電梯安裝檢驗(yàn)中應(yīng)注意的幾個(gè)問題[J];民營科技;2012年01期
相關(guān)會(huì)議論文 前1條
1 楊慧鋒;;電梯安裝工程實(shí)踐[A];土木建筑學(xué)術(shù)文庫(第11卷)[C];2009年
相關(guān)重要報(bào)紙文章 前10條
1 史玉成;北京電梯安裝養(yǎng)護(hù)要實(shí)行新標(biāo)準(zhǔn)[N];中國質(zhì)量報(bào);2007年
2 本報(bào)記者 韓慶文 通訊員 史劍 于璐;五項(xiàng)流程缺一不可[N];廣東建設(shè)報(bào);2009年
3 ;搶占“制高點(diǎn)”[N];建筑時(shí)報(bào);2009年
4 田夫 志敏 志洪 小波;能者為師上講臺[N];常州日報(bào);2010年
5 于曉穎;電梯安裝國家職業(yè)標(biāo)準(zhǔn)在京試行[N];中國建材報(bào);2011年
6 本報(bào)記者 洪敬譜;兩部電梯安裝4年不能正常使用[N];中國消費(fèi)者報(bào);2011年
7 記者 曹飛;我市給電梯安裝維保立規(guī)矩[N];大同日報(bào);2012年
8 竇新東 秦澤克;電梯安裝 我行我秀[N];中國建設(shè)報(bào);2006年
9 林子;安裝:地位江河日下[N];中國房地產(chǎn)報(bào);2012年
10 張玲邋紅梅;安全狀況量化體現(xiàn) 責(zé)任意識細(xì)節(jié)入手[N];中國質(zhì)量報(bào);2008年
相關(guān)碩士學(xué)位論文 前7條
1 鄭昆明;基于全生命周期的電梯安裝項(xiàng)目風(fēng)險(xiǎn)評估機(jī)制研究[D];山東大學(xué);2011年
2 王雨婷;基于Unity3D的電梯安裝仿真互動(dòng)系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[D];東北大學(xué);2014年
3 金勇;基于過程控制的電梯安裝質(zhì)量管理研究[D];電子科技大學(xué);2008年
4 張震東;網(wǎng)絡(luò)計(jì)劃技術(shù)在電梯安裝項(xiàng)目中的應(yīng)用[D];上海交通大學(xué);2009年
5 顏世君;項(xiàng)目質(zhì)量管理在電梯安裝項(xiàng)目中的應(yīng)用[D];天津大學(xué);2011年
6 毛瑋;基于風(fēng)險(xiǎn)的西塔項(xiàng)目電梯安裝工程安全管理研究[D];華南理工大學(xué);2011年
7 徐浩菁;電梯安裝及維修保養(yǎng)成本控制研究[D];浙江大學(xué);2013年
,本文編號:2158782
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/2158782.html