鋼筋混凝土結構構件加固后的可靠度研究
[Abstract]:With the increase of the service life of buildings, more and more buildings have exceeded or close to their design life, so there is a certain degree of hidden danger of safety, so it is necessary to re-identify these buildings. The contents of the appraisal generally include safety, applicability and durability. When any of the performance indexes in the appraisal result do not meet the requirements of the specification, the technical treatment of the building is required, and one of the ways to deal with it is to carry out maintenance and reinforcement. Make it meet the limit state of carrying capacity and the limit state of normal use again. In view of the limit state of the bearing capacity of the members, the first step is to use the appraisal code to evaluate the safety of the existing building, and when the evaluation result is not satisfied, the existing reinforcement code is adopted to reinforce the structure. However, the reliability level of the existing reinforcement code is not clear. The main work of this paper is as follows: (1) this paper considers the reliability calculation of existing structures and the different structures to be built. Considering the corrosion of steel bar in atmospheric environment, the attenuation of concrete strength, and the influence of different service life on the modification of live load, the existing concrete structural members that have been in use for a certain number of years are considered. A method for calculating the reliability of existing structures is presented. The results show that the existing structures should be fully considered for their characteristics, and the reliability index should be analyzed. (2) after the reinforced concrete columns under axial compression are designed by the method of reinforcement code, The reliability indexes of the original part and the new addition part are calculated separately. The original part is calculated according to the existing structural reliability index, and the new part is calculated according to the method of calculating the proposed structural reliability index. The factors that affect the reliability index of two parts are analyzed. The analysis shows that the reliability index of the new and old reinforced concrete can be coordinated as much as possible by adjusting the unloading ratio and the load ratio of steel bars. (3) strengthening reinforced concrete beams with bonded steel, Considering the stress level at the strengthening time and the strain lag effect of the steel plate, according to the formula of the reinforcement code, The first order second moment method is used to analyze the reliability of the strengthened beam. (4) in order to solve the problem of which random input parameters have great influence on the output results in practice, the first order second moment method is used to analyze the reliability of the strengthened beam. In this paper, the finite element analysis software Ansys is used to establish the analysis model of the steel bonded strengthened beam, and the reliability analysis module is used to analyze the sensitivity of the strengthened beam. The analysis shows that the compressive strength and external load of concrete have the greatest influence on the stress and displacement of the strengthened beam.
【學位授予單位】:天津大學
【學位級別】:碩士
【學位授予年份】:2014
【分類號】:TU375;TU311.2
【相似文獻】
相關期刊論文 前10條
1 趙沁平;王化奎;;關于“邊點網(wǎng)絡”的可靠度[J];太原工學院學報;1980年03期
2 賀國楷;;機械的可靠度[J];火控雷達技術;1987年04期
3 趙雷,陳虬,路湛沁;結構地震可靠度理論研究進展[J];建筑結構;2000年12期
4 沈冰,姜寶忱;抗疲勞斷裂的可靠度計算[J];機械設計與制造;2002年03期
5 馬洪偉;周溪召;孫洪運;;城市交通網(wǎng)絡連通可靠度計算研究[J];計算機應用研究;2013年01期
6 周亞萍;;計算一般網(wǎng)絡可靠度的新算法[J];哈爾濱電工學院學報;1988年04期
7 郭懷志,張社榮,黃東軍;可靠度分析的數(shù)值解法[J];水利學報;1990年07期
8 張鎖貴;;應力和強度分布為表列數(shù)據(jù)時的可靠度計算[J];機械強度;1993年03期
9 程中則;黃曉明;;水泥混凝土路面的可靠度研究[J];華東公路;1993年06期
10 王博;;水工設備抗震可靠度計算方法[J];世界地震工程;1993年02期
相關會議論文 前10條
1 李國強;李繼華;;相關隨機向量的結構可靠度計算[A];工程結構可靠性——中國土木工程學會橋梁及結構工程學會第七屆學術會議論文集[C];1987年
2 李君;;基于沖擊模型的電子設備可靠度計算模型[A];2011年河南省先進制造技術學術年會論文集[C];2011年
3 馬樹升;張良成;李銀生;楊生虎;;結構灰色可靠度計算方法研究[A];第七屆全國結構工程學術會議論文集(第Ⅰ卷)[C];1998年
4 李君;;基于沖擊模型的電子設備可靠度計算模型[A];2012年全國地方機械工程學會學術年會論文集(河南分冊)[C];2012年
5 姚繼濤;濤聿修;陳慧儀;;多層多跨框架失效機構的可靠度計算[A];工程結構可靠性——中國土木工程學會橋梁及結構工程學會結構可靠度委員會全國第三屆學術交流會議論文集[C];1992年
6 高小旺;魏璉;;結構抗震可靠度的分析方法[A];工程結構可靠性——中國土木工程學會橋梁及結構工程學會第七屆學術會議論文集[C];1987年
7 劉寧;孟慶生;吳世偉;;非平穩(wěn)載荷下結構疲勞裂紋擴展的可靠度分析[A];第二屆全國結構工程學術會議論文集(下)[C];1993年
8 李鏞培;高大釗;;豎向承載樁的模糊隨機可靠度計算方法[A];巖土力學數(shù)值方法的工程應用——第二屆全國巖石力學數(shù)值計算與模型實驗學術研討會論文集[C];1990年
9 韓憲軍;王利;;分布形式及相關模型對可靠度計算結果的影響[A];第十一屆全國土力學及巖土工程學術會議論文集[C];2011年
10 羅賢全;;一種通用裝備可靠度預計模型[A];'2002系統(tǒng)仿真技術及其應用學術論文集(第四卷)[C];2002年
相關博士學位論文 前10條
1 劉雪云;儲油罐的腐蝕趨勢預測和可靠度建模的研究[D];哈爾濱工業(yè)大學;2016年
2 孟增;結構可靠度優(yōu)化設計的高效穩(wěn)健算法研究[D];大連理工大學;2015年
3 黃曉旭;結構的時變可靠度分析方法及優(yōu)化設計研究[D];華中科技大學;2016年
4 許林;基于可靠度的結構優(yōu)化研究[D];大連理工大學;2004年
5 邊曉亞;樁基正常使用極限狀態(tài)可靠度分析與設計研究[D];華中科技大學;2014年
6 彭文軒;加錨巖土體穩(wěn)定可靠度研究及工程應用[D];重慶大學;2004年
7 孫海;結構體系抗震可靠度的優(yōu)化與控制研究[D];哈爾濱工程大學;2009年
8 李玉剛;樁式海上風機基礎可靠度分析及優(yōu)化方法研究[D];大連理工大學;2009年
9 駱碧君;基于可靠度分析的供水管網(wǎng)優(yōu)化研究[D];天津大學;2010年
10 劉潤;海工結構物地基可靠度及隨機有限元分析[D];天津大學;2001年
相關碩士學位論文 前10條
1 王泓剛;基于MDD的隨機流網(wǎng)絡可靠度分析算法研究[D];桂林電子科技大學;2015年
2 吳興正;路基邊坡穩(wěn)定可靠度計算中的不確定性問題研究[D];西南交通大學;2015年
3 曹永飛;開裂RC橋梁動態(tài)可靠度分析及研究[D];長安大學;2015年
4 趙敏;大型LNG儲罐隨機地震響應與抗震可靠度分析[D];哈爾濱工業(yè)大學;2015年
5 郎路光;多種荷載組合下超大型空冷塔筒體靜力響應與可靠度分析[D];哈爾濱工業(yè)大學;2015年
6 張智超;基于支持向量機的土石壩壩坡穩(wěn)定可靠度分析[D];廣西大學;2015年
7 張精岳;在役RC橋梁的可靠度分析與剩余壽命研究[D];河北工業(yè)大學;2015年
8 桂勛;基于健康監(jiān)測的平勝大橋鋼箱梁細節(jié)疲勞可靠度研究[D];長沙理工大學;2014年
9 周丹;基于有限元計算的重力壩可靠度及敏感性研究[D];西華大學;2015年
10 蘇小培;基于凸集模型的橋梁非概率可靠度研究[D];云南大學;2015年
,本文編號:2139323